USPTO serial 79026323
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,950
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Patrick J. Jennings
Patrick J. Jennings Pillsbury Winthrop Shaw Pittman, LLP1200 Seventeenth Street, NWWashington, DC 20036UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 004 | [Paints] | SECTION 71 - CANCELLED | — |
| 006 | [Metal building materials, namely, soffits and fascia; common metals, namely, aluminum, nickel and their alloys; manually operated metal valves; metal manhole covers; metal locks; metal locks for vehicles; metal signs which are neither luminous nor mechanical; metal reinforcing materials for machine belts; metal sealing, gasket and key rings; manually operated metal water-pipe valves; spanners; metal vats for fermentors used in the wine industry for the vitrification of musts; metal tubing; metal stair treads; metal ladders; prefabricated building materials, namely, metal steps; metal registration license plates;] metal storage transport containers for fuel; [metal pipes; metal pipe fittings, namely, cocks; metal flanges; metal hose and joinery fittings; non-mechanical metal winding spools for flexible hoses;] cases of stainless steel boxes[; steel and aluminium] | ACTIVE | — |
| 007 | [Food mixers, mixers; electric, electro-hydraulic or hydraulic operated pumps for swimming pools and aquariums; food waste disposers; clack valves being parts of machines; waste compacting machines; condensing installations, namely, air condensers and axial fan condensers; belts for machines; cylinder heads for internal combustion and vehicle engines; machine parts namely, hoppers; emission reduction units for motors and engines, namely, EGR valves, PCV valves, catalytic converters; sewage pulverizers] | SECTION 71 - CANCELLED | — |
| 009 | [Magnetic identity cards; measuring and controlling apparatus, namely, rain gauges, and measuring cups; speed indicators for vehicles; fire engines; temperature indicators; vacuum gauges; gauges, namely, tire pressure gauges; lactometers; luminous or mechanical road signs; pressure indicator plugs for valves; thermometers not for medical use; vehicle breakdown warning triangles; electronic thermometers] | SECTION 71 - CANCELLED | — |
| 011 | [Thermoelectric and induction re-heaters for agri-food products; reheaters for agri-food products; anti-glare devices for motor cars, namely, light filters and light diffusers; lights for motor cars and land vehicles; refrigerating apparatus and installations, namely, refrigerators; cooling installations for liquids namely, water coolers; ventilation and drying apparatus, namely, clothes dryers, ventilation hoods] | SECTION 71 - CANCELLED | — |
| 012 | Trailers; gas tanks for trucks; unitized tanker bodies, tankers, unitized tankers semi-trailers, semi-trailers, tank bodies; vehicle chassis, namely, automobile chassis, wagon chassis, underframes for railcars, tanker wagons, refrigerated wagons; mobile storage tanks, namely, tank containers, portable tanks, tanks for powdery products, dump tanks; tanks with interior lining; waste tanks, vacuum-operated tanks; freight containers, namely, swap bodies; heat-insulated and refrigerated insulated tankers and trailers; land vehicles, light lorries | ACTIVE | — |
| 037 | [Vehicle repair and breakdown assistance services; rental of trailers, lorries, tankers, tanker-lorries, semi-trailers, repair services for vehicles, tankers, semi-trailers and lorries; vehicle maintenance, namely, checking the level of oil or petrol in the engine crankcases of vehicles, tankers, semi-trailers, lorries; vehicle maintenance, namely, carrying out pressure, temperature, fill-point, safety and reliability tests for tankers, semi-trailers and lorries and maintenance and repair services for vehicles, tankers, semi-trailers and lorries; vehicle cleaning] | SECTION 71 - CANCELLED | — |
| 039 | [Transport of goods by land vehicles, vehicles rental, rental of tankers] | SECTION 71 - CANCELLED | — |
| 040 | Custom manufacture of boilers; custom steel, stainless steel, aluminum, special steels rolling and fabrication to the order and specification of others | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 18, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 24, 2018 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| May 20, 2018 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 20, 2017 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 20, 2017 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 11, 2017 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Oct 23, 2016 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Apr 18, 2016 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Feb 24, 2016 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 4, 2016 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 31, 2016 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 31, 2015 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 25, 2015 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jun 25, 2015 | INPC | INVALIDATION PROCESSED | — |
| Jun 24, 2015 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Feb 21, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 4, 2015 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 4, 2014 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jun 4, 2014 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 7, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 3, 2014 | 715F | REGISTERED - SEC. 71 & SEC. 15 FILED | — |
| Apr 3, 2014 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| May 15, 2009 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 29, 2008 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 29, 2008 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 25, 2008 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 23, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 7, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 18, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| May 12, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 12, 2007 | ALIE | ASSIGNED TO LIE | — |
| Apr 25, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 18, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 17, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 17, 2007 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 20, 2007 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 19, 2007 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 10, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 9, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 9, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 29, 2006 | RFNP | REFUSAL PROCESSED BY IB | — |
| Sep 8, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 8, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 6, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 5, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 1, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 1, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Aug 31, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |