Drawing for BAIE PLUS

USPTO serial 79028247

BAIE PLUS

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
BLANE, SUZANNE
Law office
TMO LAW OFFICE 114 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BAIE PLUS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Building materials of metal, namely grilles, gratings, railings, dormer windows, rafters, frameworks, valances, shingles, tiles, tubes and pipes of metal, pipes for residential, collective and industrial buildings, rainwater gutters, conduits, gutter pipes, gutters, drain pipes, roof systems, shaped parts, slabs, sheets and plates, hardware of metal, namely screws of metal, cotter pins, nails, hooks, tube and pipe clamps; gutters of metal, pipe junctions of metal, doors, shutters, windows, siding, beams, pillars, studding, foot-scrapers, door cases, window frames, door frames, window casings, door casings, verandas, staircases, cornices, shores, canopiesSECTION 70 - CANCELLED—
019Non-metallic building materials, namely grilles, gratings, railings, dormer windows, rafters, frameworks, valances, shingles of all types, tiles, slates, rainwater gutters, conduits, gutter pipes, gutters, drain pipes, doors, shutters, windows, siding, beams, pillars, studding, foot-scrapers, door cases, window frames, door frames, window casings, door casings, verandas, staircases, cornices, shores, canopiesSECTION 70 - CANCELLED—
037Construction of buildings, repair of buildings, facades, roof systems, roofing, piping systems, rainwater gutters, gutters and valances; installation of roofing, piping systems, rainwater gutters, gutters and valances; laying of building materials, insulation materials, rental of construction equipment, construction information, repair, supervising (directing) construction work, construction, erection of scaffolding, damp-proofing, building insulation, cleaning of buildings, piping systems, rainwater gutters and gutters, roofing services, chimney sweeping, interior and exterior paintingSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 11, 2016DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Nov 10, 2016DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 20, 2008FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 2, 2008FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 30, 2008FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 28, 2008OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 13, 2008OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 13, 2008OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 30, 2007MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 30, 2007ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 17, 2006RFNTREFUSAL PROCESSED BY IB—
Oct 26, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 26, 2006RFRRREFUSAL PROCESSED BY MPU—
Oct 26, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 25, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 13, 2006DOCKASSIGNED TO EXAMINER—
Oct 13, 2006NWAPNEW APPLICATION ENTERED—
Oct 12, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance