Drawing for XERVON

USPTO serial 79028641

XERVON

Reviewed by CopyMark Law Group

Reg. 3348772Status 404
Filing date
Status date
Registration date
Dec 4, 2007
Examiner
KAUFMAN, LAURIE R
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with XERVON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
002Anti-corrosive preparations, namely, paints, corrosion inhibiting films, corrosion inhibition oils, anti-corrosion coating, corrosion-inhibiting primers, paints, varnishes, lacquers, wood preservatives, dyes, namely aniline dyes, basic dyes, direct dyes, raw natural resins for use in manufacture of adhesives, metal in foil and powder form for painters, decorators and printersSECTION 71 - CANCELLED—
006Common metals and their alloys, namely, common metal ingots, common metal drawer pulls, common metal slabs, common metal stribs, metal strips; common metals and their alloys in rod, sheet or tube form for use in further manufacture, alloys of metal for casting, building material of metal, namely, flashing, soffits, fascia, stairs of metal, boards of metal, brackets of metal, panels of metal, bars for metal railings, braces of metal for handling loads, platforms of metal, props of metal, roof coverings of metal, wall linings of metal, wall hooks of metal for pipes, buildings, transportable, of metal; railway materials of metal for railway construction; non-electric metal cables and wires; metal hardware and locksmith materials, namely, buckles of metal, bolts of metal, chains of metal, chests of metal, nails of metal, angle of metal; tubes and pipes of metal; metal products, namely, clips of metal for tubes and pipes, collars of metal for fastening tubes and pipes, elbows of metal for tubes and pipes, junctions of metal for tubes and pipes, tube and pipe muffs of metal , reinforcing materials of metal for tubes and pipes, tubes and pipes valves of metal; metal construction scaffolding and components, namely all girders, stands, panels, anchors, couplings; metal mobile and hanging scaffolding; roof coverings of metal; portable and prefabricated steel buildingsSECTION 71 - CANCELLED—
037Construction, repair, installation work, construction planning, building inspection, and construction consultancy for buildings of all kinds and related building infrastructure; installation of fire alarm systems; demolition of buildings; building sealing; painting and repair of signs; asphalting; providing construction information with relation to building construction; providing repair information with relation to building repair; exterior cleaning of buildings; construction and repair of warehouses; construction supervision; dry cleaning; roofing services; disinfecting; general construction contracting; installation of building insulation; interference suppression in electrical apparatus; vehicle service stations; chimney sweeping; scaffolding erection, repair and dismantling; building construction and civil engineering; interior cleaning of buildings; line and pipeline construction and maintenance; elevator construction and maintenance; installation and repair of irrigation devices, heating devices and air conditioning; installation and repair of cooling devices; installation and repair of ovens; installation, maintenance and repair of machines; plumbing; furniture varnishing; painting; masonry; boiler cleaning and repair; pump repair; rust proofing; sanding; underwater repair; rental of construction equipment; rebuilding machines and engines that have been worn or partially destroyed; installation of heat, cold and sound insulation; rental of construction, mobile and hanging scaffolding and construction devices; exterior cleaning of buildings; pipe and canal cleaning, gully cleaning; industrial cleaning; renovation of buildings and technical equipment; installation, maintenance and repair of machines; interference suppression in electrical apparatus; repair and maintenance of data-technical equipment; installation and repair of equipment technology; installation of pumps and fittings; installation and repair of power supply equipment; repair of concrete buildings and related infrastructure; erection and repair of mobile and conveyor equipment; installation of scaffolding; installation of heat and sound protection insulation and devices; demolition of bridges, buildings, streets, pipelines, supply plants and industrial plants; builder services, namely installation, initial operation and quality management of building projectsSECTION 71 - CANCELLED—
042Engineering services, namely technical consultations in scaffolding installation, erection, repair and design; technical consultation in the field of engineering, architectural design; construction drafting; environmental consultations in the field of environmental assessment, compliance and planning, sewage plants, demolition of plants; technical project planning in the field of engineering, architectural design, plant maintenance planning and management, welding technology, pumping services for removal of sewage and residual material of structures, insulating, demolition of bridges, buildings, streets, pipelines, supply plants and industrial plants, surface protection of conveyor belts, steel, cement, wood and rail tracks; construction drafting; architectural design services; engineering services; electronic data processing consulting, namely in the field of computer hardware, computer software, data conversion of computer programs and data; environmental technology consulting in the field of environmental assessment, compliance and planning, sewage plants, demolition of plants; technical project planning in the field of engineering, architectural design, plant maintenance planning and management, welding technology, pumping services for removal of sewage and residual material of structures, insulating, demolition of bridges, buildings, streets, pipelines, supply plants and industrial plants, surface protection of conveyor belts, steel, cement, wood and rail tracks; construction drafting; architectural design services; planning of infrastructure projects, namely the technical development and planning of commercial objects; development of generation of data processing programs by order of third parties, technical consulting in the operation of industrial equipmentSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 15, 2016DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Apr 15, 2016DETHDEATH OF INTERNATIONAL REGISTRATION—
Jul 31, 2015INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 10, 2015INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 10, 2015INPCINVALIDATION PROCESSED—
Mar 11, 2015INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 11, 2014C71TCANCELLED SECTION 71—
Sep 22, 2013ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 5, 2009FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 25, 2008FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 25, 2008FIMPFINAL DISPOSITION PROCESSED—
Mar 4, 2008FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 4, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 19, 2007TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 18, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 29, 2007NPUBNOTICE OF PUBLICATION—
Aug 15, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 15, 2007ALIEASSIGNED TO LIE—
Jun 29, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 19, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 19, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 19, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 5, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 7, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 6, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 6, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 6, 2007TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 1, 2006RFNTREFUSAL PROCESSED BY IB—
Nov 8, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 8, 2006RFRRREFUSAL PROCESSED BY MPU—
Nov 7, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 6, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 20, 2006DOCKASSIGNED TO EXAMINER—
Oct 20, 2006NWAPNEW APPLICATION ENTERED—
Oct 19, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance