Drawing for REFCO

USPTO serial 79028772

REFCO

Reviewed by CopyMark Law Group

Reg. 3261332Status 706Renewal
Filing date
Status date
Registration date
Jul 10, 2007
Examiner
RINKER, ANTHONY MICHAEL
Law office
TMO LAW OFFICE 119

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with REFCO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $2,042*

Plus Government fees of $5,200

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thilo C. Agthe

Thilo C. Agthe Wuersch & Gering LLP100 Wall Street, 10th FloorNEW YORK, NY 10005UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001[ Metal tempering preparations and soldering chemicals; ] adhesives used in leak detection; refrigeration chemicals; chemical preparations in the nature of filtering materials in leak detection; chemical leak sprays for displaying line leaksACTIVE—
006Valves and fittings of metal for pipes, namely manually operated metal valves, fittings and joining flangesACTIVE—
007Gas pumps; vacuum pumps; replacement parts for gas pumps and vacuum pumps; filters for air and liquids, for motors or pumps or enginesACTIVE—
008Hand tools and implements, namely, pipe-bending and cutting apparatus, flaring tools, clamping tools and fittings thereforACTIVE—
009Mechanical and electrical pressure measuring apparatus, namely, pressure gauges, high pressure manometers, thermometer and vacuum measuring apparatus; pressure gauges; thermostats, [ time switches, relays; ] electric and mechanical leak detection monitoring apparatus, equipment, and instruments for detecting and measuring two-dimensional distribution [ of force and ] pressure; hygrometers; computer component testing and calibrating equipment; charging appliances for rechargeable equipment; scales for weighing stored gases, and parts thereof, namely, cylindersACTIVE—
011Ultra-violet detection lamps; filters for air and liquids for industrial installations, soldering lampsACTIVE—
017Packing materials, namely, materials for forming seals and encasing other material, and insulating materials, namely, polyurethane foam and polyethylene foam; flexible pipes, not of metal; [ weather-stripping compositions, materials and goods, namely, polyurethane foam and polyethylene foam, and weather-stripping for use in industrial premises ]ACTIVE—
042Engineering, research, material testing and quality control for vacuum technology for others; research on [ building construction incorporating ] vacuum technology; engineering; technical consultancy in the field of vacuum technologyACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 10, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Mar 27, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
May 19, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Apr 2, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 2, 2018INPCINVALIDATION PROCESSED—
Mar 24, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 24, 2017NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jul 24, 201771AGREGISTERED-SEC.71 ACCEPTED—
Jul 22, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 7, 2017ES71TEAS SECTION 71 RECEIVED—
Aug 4, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 10, 2016REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Apr 16, 2015RNWLINTERNATIONAL REGISTRATION RENEWED—
Sep 27, 2012NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Sep 27, 2012C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Sep 27, 2012APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 30, 2012715FREGISTERED - SEC. 71 & SEC. 15 FILED—
Aug 30, 2012ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 3, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 3, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 27, 2009CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 20, 2009CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 14, 2008FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 16, 2007FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 16, 2007FIMPFINAL DISPOSITION PROCESSED—
Nov 7, 2007FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 10, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 24, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 4, 2007NPUBNOTICE OF PUBLICATION—
Mar 2, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 1, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 1, 2007ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Feb 20, 2007PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 25, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 25, 2007ALIEASSIGNED TO LIE—
Dec 22, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 14, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 13, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 13, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 24, 2006RFNTREFUSAL PROCESSED BY IB—
Nov 3, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 3, 2006RFRRREFUSAL PROCESSED BY MPU—
Nov 2, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 1, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 1, 2006RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Oct 29, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 28, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 27, 2006DOCKASSIGNED TO EXAMINER—
Oct 27, 2006NWAPNEW APPLICATION ENTERED—
Oct 26, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance