Drawing for BP ALTERNATIVE ENERGY

USPTO serial 79029438

BP ALTERNATIVE ENERGY

Reviewed by CopyMark Law Group

Reg. 3458179Status 404
Filing date
Status date
Registration date
Jul 1, 2008
Examiner
MARTIN, JENNIFER MCGARRY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BP ALTERNATIVE ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Donald C. Knapp, Jr.

Donald C. Knapp, Jr. BP America Inc.150 West Warrenville RoadMail Code 200-1WNaperville, IL 60563

Goods and services

ClassDescriptionStatusFirst use
001Chemicals used in industry and science; chemical additives for fuel treatment, chemical additives for use with internal combustion engine fuels; hydrogenSECTION 71 - CANCELLED—
004Fuels; non-chemical additives for oils and fuels; hydrogen for use as a fuelSECTION 71 - CANCELLED—
007Machines and machine tools, namely, for generation of electricity; motors and engines, namely, engines and motors for generation of electricity; generators, namely, electric generators, generators for land vehicles; apparatus and machines for power generation, namely, internal combustion engines for power generation; turbines; windmills; wind-powered electricity generators and machines for converting wave power to electric energy; apparatus for generating electricity and/or heat from geo-thermal power, namely, geo-thermal electricity generatorsSECTION 71 - CANCELLED—
009Blank magnetic data carriers; data processors and computers; software for managing energy and power needs, namely, computer software for managing energy measurement data for the energy industry; fuel cells; power cables; photovoltaic cells and modules; photovoltaic apparatus and installations for generating solar electricity, namely, photovoltaic solar modules; electrical cells and batteries; battery chargers; accumulators; acid hydrometers; acidometers for batteries; anode batteries; anodes; capacitors; circuit breakers and electric circuit closers; galvanic batteries; electric apparatus for remote ignition, namely, remote controls for igniting engines, integrated circuits; light conducting filaments; oscillographs; printed circuits; pyrometers; electric resistors; solar batteries; silicon wafers; water level indicators; downloadable electronic publications, namely, downloadable computer magazines for use in the field of energy production; solar cells; solar panels; photo sensors, calibrated photovoltaic reference cells, ampere-hour meters, electrical charge controllers, voltage regulators and monitorsSECTION 71 - CANCELLED—
011Incinerators; heat accumulators; gas burners for industrial use; heat exchangers; petrol burners, namely, gas burners for industrial use; gas regulators, regulating accessories for water supply, namely, metered valves; solar collectors for heating; solar furnacesSECTION 71 - CANCELLED—
016Printed instructional, educational and teaching materials in the field of energy production; handbooks in the field of energy productionSECTION 71 - CANCELLED—
035Business management; consultancy services relating to energy and power, namely, consultation regarding energy use management, business consultation; business management of energy requirements for others; provision of internet portal facilities for on-line trading, namely, providing a web site at which users can offer goods for sale and buy goods offered by others; business consultation in the field of photovoltaic installationsSECTION 71 - CANCELLED—
037Construction, maintenance and repair of power stations; installation, maintenance, repair and servicing of gas supply pipes; installation, construction, maintenance and repair of power plants and pipelines for utilization of geo-thermal powerSECTION 71 - CANCELLED—
039Distribution of energy; public utility services in the nature of natural gas distribution; gas supplying; transportation and storage of fuels; utility services, namely, transmission and distribution of electricity to commercial, residential and industrial premises; transmission of gas by pipelineSECTION 71 - CANCELLED—
040Generation of power and electricity; production of gas; waste processing, treatment and disposal; preparing and processing of fuels and of other sources of energy, namely, gas production and wind capture; production of energy from heat from geo-thermal powerSECTION 71 - CANCELLED—
041Providing of training in the fields of electricity production, gas production, solar energy production and geo-thermal power production; providing of educational seminars, conferences and courses in the fields of oil, gas and petrochemical industries, science, health, safety and environment; providing non-downloadable electronic publications, namely, newsletters and magazines in the fields of electricity production, gas production, solar energy production and geo-thermal power production; organization and conducting of educational and informational seminars in the field of photovoltaic installationsSECTION 71 - CANCELLED—
042Scientific and technological services and research and design relating thereto, namely, scientific research; design and development of computer hardware and software for others; design of energy and power systems, namely, architectural and technological design of energy plants and power plants; consultancy services relating to environmental matters, namely, consulting services in the field of environmental assessment, compliance and planning; design services for power plants; technical consulting, technical design and technical planning of photovoltaic installations; computer software consultation; development of environmentally-friendly forms of energy and powerSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 1, 2016DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jul 1, 2016DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 27, 2015INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 5, 2015INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 5, 2015INPCINVALIDATION PROCESSED—
Oct 6, 2015INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 6, 2015C71TCANCELLED SECTION 71—
Dec 29, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 17, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 4, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 7, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 16, 2008FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 16, 2008FIMPFINAL DISPOSITION PROCESSED—
Oct 1, 2008FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 1, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 15, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 26, 2008NPUBNOTICE OF PUBLICATION—
Mar 11, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 11, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 11, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Mar 11, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 11, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 11, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 10, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Feb 23, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 21, 2008CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Feb 8, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 6, 2008ALIEASSIGNED TO LIE—
Jan 2, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 2, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Jan 2, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 2, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 2, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 21, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 4, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 3, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 3, 2007ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 7, 2007LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jun 6, 2007GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 6, 2007CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 15, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 14, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 14, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 9, 2007ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 9, 2007REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 1, 2006RFNTREFUSAL PROCESSED BY IB—
Nov 14, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 14, 2006RFRRREFUSAL PROCESSED BY MPU—
Nov 10, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 9, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 3, 2006DOCKASSIGNED TO EXAMINER—
Nov 3, 2006NWAPNEW APPLICATION ENTERED—
Nov 2, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—