USPTO serial 79030084
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Lisa Parker Gates
Lisa Parker Gates Baker & McKenzie LLP300 East Randolph StreetSuite 5000Chicago, IL 60601| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and machine tools within the building and construction sector, namely electric motors and engines for machines; electric, pneumatic and power-operated steel reinforcing shears, bending machines, mortar mixers, construction cranes, electric, pneumatic and power-operated scrap shears, grinders; elevators; lifts, namely, elevators for use in building and construction; elevators for use in mining; underground elevators for use in mining; pit lifts for use in underground mining; personal elevators; elevators for use during supervision of building construction; elevators for lifting goods; off-shore lifts, namely, lifts for use in constructing platforms; machine parts, namely, elevator chains for purpose of lifting and lowering elevators; belts for elevators; brakes for working and construction platforms; brakes for lifts; cranes; wheels being parts of machines; wheelworks for machines; drives for machines; electric hand-tools, namely drills, saws, sanders; electric motors for machines except for land vehicle motors; electric and pneumatic windlasses, winches; hydraulic working and construction platforms and motors for machines and engines other than for land vehicles; pneumatic working and construction platforms and motors for moving platforms; cranes; hoists; line hoists, winches; elevator parts, namely, lines for elevators and lifts for lifting and lowering elevators; grooved pulleys and wedge ropes discs and variators; ball-bearings; gears, other than for vehicles, namely, elevator gears, moveable platform gears, material hoist gears, construction hoist gears; gear pinion; pinion gear poles; gear seats being parts of machinery; toothed transmission gear motors; machine parts, namely, couplings and transmission parts, not for land vehicles; belts for machines; machine parts, namely, roller bearings; roller bearings for machines; moving staircases, namely, escalators; machine operated mobile working and construction platforms; worm gears for machines; conveyers; pneumatic and power-operated transporters | SECTION 70 - CANCELLED | — |
| 037 | Building, construction and installation of buildings, elevators and lifts, building scaffolds, working and building platforms, transportable working and building platforms, movable working and building platforms, building scaffolds; machinery installation; repair and maintenance of elevators and lifts, building scaffolds, working and building platforms, transportable working and building platforms, movable working and building platforms, building scaffolds, cranes, electrical hand tools, transporters, machines, namely, lifts for use in constructing platforms; rental of building and construction equipments, elevators and lifts, building scaffolds, working and building platforms, transportable working and building platforms, movable working and building platforms, building scaffolds, cranes, electrical hand tools, transporters, and machines, namely, lifts for use in constructing platforms; also rental of parts and components for the aforesaid goods; setting up of building sites in preparation for construction, namely, clearing and excavating of building sites, evaluation building sites for purposes of construction, building site preparation | SECTION 70 - CANCELLED | — |
| 042 | Technical consultancy in the field of development and industrial design regarding construction machines for building scaffolds, working platforms, building platforms, mobile work platforms, construction cranes, electrical hand tools, hoisting cranes, elevators and lifts, elevating apparatus, lifting apparatus, module and elevator lifts, module platforms, building lifts, and transporters; technological consultancy regarding the use and operation of construction equipment and development of parts and fittings for the aforesaid products | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 12, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 16, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 27, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 15, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 29, 2018 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - MAILED | — |
| Aug 29, 2018 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Aug 27, 2018 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 27, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 8, 2015 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Sep 3, 2014 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED | — |
| Sep 3, 2014 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 3, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 25, 2014 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 25, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 26, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 29, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 16, 2008 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 16, 2008 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 26, 2008 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 26, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 10, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 21, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| May 7, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 2, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| May 2, 2008 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 1, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 1, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 1, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 28, 2008 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 17, 2008 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 17, 2008 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 4, 2008 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Mar 24, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 21, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 20, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Mar 20, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 19, 2008 | ALIE | ASSIGNED TO LIE | — |
| Feb 28, 2008 | PAPER RECEIVED | — | |
| Jan 23, 2008 | RECG | ACTION GRANTING REQ. FOR RECON. MAILED | — |
| Jan 23, 2008 | CNCF | ACTION CONTINUING FINAL - COMPLETED | — |
| Dec 28, 2007 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 28, 2007 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Dec 28, 2007 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Dec 28, 2007 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Jul 6, 2007 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 5, 2007 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 12, 2007 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 12, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 12, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 12, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 29, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 12, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 12, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 9, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 8, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 17, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 17, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Nov 16, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |