USPTO serial 79030380
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Anne W. Glazer
Anne W. Glazer Stoel Rives LLP760 SW Ninth Avenue, Suite 3000Portland, OR 97205UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for conducting, switching, transforming, storing, regulating and controlling of electricity, namely, electric conductors, electric switches, electric transformers, electric storage batteries and voltage regulators for electric power; electric apparatus and instruments, namely, electric accumulators, electric commutators in the field of photovoltaic and solar thermal; electric accumulators; electric cables; electric and electronic operating instruments and apparatus, namely, remote controls used for the regulation and control of interior and exterior window blinds, and temperature sensors; wind sensors and sun sensors for activating aforesaid instruments and apparatus; automatic switchboards for electronic control and operation of aforesaid apparatus and instruments; solar control systems consisting of installations and systems and parts thereof, namely, solar cells, solar modules, inverters, rectifiers, converter in the fields of photovoltaic and solar thermal; electric plugs, electric fuses, and electric fuse boxes; electric switches and automatic switchboards; replacement parts for all aforesaid goods, all aforesaid goods not in relation to the automobile industry | SECTION 70 - CANCELLED | — |
| 011 | [ Lighting apparatus, namely, lamps; heating apparatus relating to solar energy technology, namely, steam heating apparatus for industrial purposes; steam generating apparatus, namely, electric food steamers; ventilation apparatus, namely, ventilating exhaust fans; water supply apparatus, namely, water faucet spout; solar collectors for heating; solar energy systems consisting of solar heat collection panels, solar collectors, solar thermal installations and systems being solar heating plants and replacement parts thereof in the fields of photovoltaic and solar thermal but not for heating apparatus and solely relating to solar energy technology; hot-water tanks, furnace boilers, electrochemical gas generators, heating systems consisting of heating installations being photovoltaic solar power plants and heating components in the nature of solar radiant heater and replacement parts thereof but not for heating apparatus and solely relating to solar energy technology, cooling systems consisting of evaporative air cooling units for domestic purposes, water heating systems related to solar energy technology composed primarily of tubes, pipes and pre-assembled manifolds though which cold or low temperature water circulates solely; all aforesaid goods not in relation to the automobile industry ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metal building materials, in particular cement roofing slabs for inclined roofs in connection with energy generating systems for the use of environmental warmth; non-metal roofings featuring integrated solar cells; non-metal rigid pipes for building purposes; asphalt, pitch and bitumen asphalt; non-metal transportable buildings ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building construction; repair installation and maintenance of installations for generating regenerative energy; construction planning, namely, construction planning and consultation in connection with thermal and photovoltaic solar systems as well as in connection with energy saving house technology ] | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, scientific research about solar energy; scientific research; technology research in the fields of photovoltaic and solar thermal; and technological design services for others in the fields of photovoltaic and solar thermal; industrial research services in the fields of photovoltaic and solar thermal; architectural consultation, engineering services including engineering services related to construction planning and engineering consultation relating to thermal and photovoltaic solar systems as well as of energy saving house technology; technical project planning in the fields of photovoltaic and solar thermal; technical research in the fields of photovoltaic and solar thermal; design and development of computer hardware and software, conversion of data and documents from physical to electronic media, technical development of measuring, signaling, controlling, checking and supervision apparatus and systems for third parties in the fields of photovoltaic and solar thermal and related technical consultation services; all aforesaid services in particular with regard to solar technology | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 16, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jul 16, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Dec 25, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 17, 2021 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jun 13, 2021 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 13, 2020 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Oct 13, 2020 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Oct 9, 2020 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jun 5, 2020 | RINX | USPTO CORRECTION PROCESSED BY IB | — |
| Apr 9, 2020 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| Apr 9, 2020 | REIN | REINSTATED | — |
| Nov 29, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 8, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 8, 2019 | INPC | INVALIDATION PROCESSED | — |
| Aug 21, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 21, 2018 | C71T | CANCELLED SECTION 71 | — |
| Nov 19, 2018 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Nov 19, 2018 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| May 17, 2018 | PR71 | POST REGISTRATION ACTION MAILED - SEC.71 | — |
| May 14, 2018 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 13, 2017 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jan 30, 2016 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Sep 11, 2015 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 20, 2015 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 20, 2015 | INPC | INVALIDATION PROCESSED | — |
| Jul 14, 2015 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 14, 2014 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Nov 14, 2014 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Nov 14, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 5, 2014 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Dec 22, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 29, 2008 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 29, 2008 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 13, 2008 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 13, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 13, 2008 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 26, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 6, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Jan 18, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 17, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jan 16, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 16, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 16, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 25, 2007 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Jul 20, 2007 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 20, 2007 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 20, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 20, 2007 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Jun 23, 2007 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jun 23, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 23, 2007 | ALIE | ASSIGNED TO LIE | — |
| Jun 12, 2007 | PAPER RECEIVED | — | |
| Dec 29, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 12, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 12, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 7, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 6, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 24, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 24, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Nov 23, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |