USPTO serial 79031766
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Turbines and generators for power generation, namely, turbines for use in turning waste gas into electrical power and to generate electrical power | SECTION 71 - CANCELLED | — |
| 009 | Electrotechnical and electronic apparatus, devices and instruments and measuring, checking, monitoring, open and closed-loop controlling and switching devices all for use in installations for turning waste gas into electrical power and electrical power generation, namely, electrical switches and switchgears, electrical controllers, computer hardware for controlling operations in installations for turning waste gas into electrical power and electrical power generation; control centers for electric power stations, namely, computer hardware and computer software for monitoring and controlling equipment, machinery and devices used in installations for turning waste gas into electrical power and power generation; data processing equipment, namely, data processors; computers and computer peripherals for use in installations for turning waste gas into electrical power and electrical power generation; data processing programs for use in planning the design and construction of installations for turning waste gas into electrical power and electrical power generation; data processing programs for monitoring and controlling the operation of installations for turning waste gas into electrical power and electrical power generation | SECTION 71 - CANCELLED | — |
| 037 | Construction services, namely, implementation of construction projects, namely, construction management and construction planning, construction supervision, building construction, and construction management in the nature of site supervision; installation, maintenance and repair of machines, installation, maintenance and repair of computer hardware | SECTION 71 - CANCELLED | — |
| 042 | Technical planning, research and technical development of plants, systems and facilities in the fields of power generation and process engineering; technical monitoring of production processes in the field of electrical power generation; engineering services; technical consultancy, in the fields of power generation and process engineering; preparation of technical and scientific expert reports in the field of power generation and relating to turning waste gas into electrical power; computer programming and renting of data processing computer programs and process engineering computer programs, in particular for constructing, equipping and operating industrial, power generating and process engineering systems and plants; civil engineering | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 17, 2017 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 18, 2016 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Nov 18, 2016 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 10, 2016 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 10, 2016 | INPC | INVALIDATION PROCESSED | — |
| Mar 10, 2016 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 10, 2015 | C71T | CANCELLED SECTION 71 | — |
| Jan 5, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 24, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 24, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 9, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 9, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 23, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 3, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 20, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 20, 2008 | ALIE | ASSIGNED TO LIE | — |
| Aug 13, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 22, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 22, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 22, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 29, 2008 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 15, 2008 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 15, 2008 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 27, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 27, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 31, 2008 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 31, 2008 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Jan 31, 2008 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Jan 31, 2008 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Jul 31, 2007 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 31, 2007 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 11, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 10, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 10, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 10, 2007 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 1, 2007 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 10, 2007 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 10, 2007 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 29, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 28, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 15, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 15, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Dec 14, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |