USPTO serial 79034225
CHAMPION
Reviewed by CopyMark Law Group
Reg. 3669464Status 404
- Filing date
- Status date
- Registration date
- Aug 18, 2009
- Examiner
- TANNER, MICHAEL R
- Law office
- GENERIC WEB UPDATE
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with CHAMPION?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Rebecca Lederhouse
Rebecca Lederhouse BAKER & MCKENZIE LLP300 EAST RANDOLPH STREETSUITE 5000CHICAGO, IL 60601Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Non-electric cables and wires of common metal; pipes and tubes of metal; working platforms, namely, metal scaffolding, prefabricated metal platforms; construction platforms, namely, metal scaffolding, prefabricated metal platforms; reinforcing bars, namely, reinforcing metal bars, metal for building purposes; scaffolding of metal; supports of metal for elevator/lift, namely, metal beams, metal pontoons and structural supports therefore, used to support decking, construction elements made of metal in the nature of metal supports, ceiling supports of metal; rods, bars, beams, pontoons and structural supports made of metal and used for scaffolding intended for the building and construction sector, the mining and petroleum sector; masts, namely, reinforcing metal beams, metal beams; chains except driving chains for vehicles, namely, metal chains, metal rigging chain, metal skid chains; and structural parts therefor ] | SECTION 71 - CANCELLED | — |
| 007 | Elevators and lift devices, namely, elevating work platforms, lifting installations for the transport of persons and goods not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; elevators; lifts other than ski-lifts, namely, elevating work platforms, lifting installations for the transport of persons and goods not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; building and construction elevators and lifts, namely, elevating work platforms, lifting installations for the transport of persons and goods not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles, elevators intended for the building and construction industry; mining and underground elevators; lifts and pit lifts, namely, elevators for underground mining; personal elevators and lifts, namely, lifting installations for the transport of persons; supervision elevator and lifts, namely, elevators intended for supervision in the building and construction industry; goods lifts, namely, lifting installations for the transport of goods not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; off-shore lifting installations for the transport of people or goods for use on ships and oil rigs not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; elevator and lift chain machine parts, namely, cables for lifts and elevators not including cables for reel lifts or cables for hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; braking devices for working and construction platforms, namely, brakes for working and construction platforms; braking devices for lifts, namely, braking clamps for elevators and lifts not including braking clamps for reel lifts or braking clamps for hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; [ cranes not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; ] electric motors except for land vehicles, namely, elevator motors; electric and pneumatic winches, not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; hydraulic working and construction platforms and motors, namely, hydraulically operated elevating work platforms, hydraulically operated elevating construction platforms; pneumatic working and construction platforms, namely, pneumatically operated elevating work platforms, pneumatically operated elevating construction platforms; lifting and hoisting apparatus in the nature of cranes, not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; hoists, not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; line hoists in the nature of winches, not including reel lifts or hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; moving staircases in the nature of escalators; mobile working and construction platforms, namely, elevating work platforms, elevating construction platforms; conveyers and pneumatic transporters for [ cranes, ] elevators, lifts and platforms; metal parts for elevator and lift devices, namely, metal elevator chains, elevator doors, elevator gears, elevator motors, cables for lifts not including cables for reel lifts or cables for hoists, booms, lifts, and winches used in the recovery and towing of disabled vehicles; and structural parts and fittings therefor | SECTION 70 - CANCELLED | — |
| 009 | Electrical and electronic apparatus and instruments for the building and construction sector in the nature of apparatus for checking, supervision, steering and maneuvering of lifts and working and construction platforms, namely, electronic controller to manage the power, movement and functions of an elevator, elevator performance monitoring system, namely, embedded software in controllers for monitoring elevator functions, electrical elevator parts, namely, push buttons, signal fixtures and emergency lighting; electric or electronic maneuvering devices for lifts and working and construction platforms, namely, brake controllers, electronic speed controllers, electronic controller to manage the power, movement and functions of an elevator; electrical elevator parts, namely, push buttons, signal fixtures and emergency lighting; electric control apparatus, namely, electronic controller to manage the power, movement and functions of elevators and platforms; electric and electronic apparatus and instruments for signaling, checking, supervision, steering, and maneuvering, namely, brake controllers, electronic speed controllers, electronic controller to manage the power, movement and functions of an elevator, electrical elevator parts, namely, push buttons, signal fixtures and emergency lighting, electronic control systems for machines, electronic controls for motors, electric control panels, electrical controlling devices, electrical elevator parts, namely, push buttons, signal fixtures and emergency lighting; and structural parts and fittings therefor | SECTION 70 - CANCELLED | — |
| 037 | [ Building construction; ] building installation services, namely, installation of elevators and lifts, hoists, scaffolding, working and construction platforms, mobile working and construction platforms, movable working and construction platforms, construction cranes, construction devices and arrangements in the nature of elevators and platforms, hoist cranes, hoist apparatus, and elevator and lift devices, motors and engines for lifts, elevators and platforms, conveyers and transporters; repair and maintenance of elevators and lifts, hoists, scaffolding, working and construction platforms, mobile working and construction platforms, movable working and construction platforms, construction cranes, lifts, hoist cranes, hoist apparatus, lift devices, motors and engines for lifts, elevators and platforms, conveyers and transporters; rental of building and construction equipment; rental of building equipment in the nature of hoists, elevators and lifts, scaffolding, working and construction platforms, mobile working and construction platforms, movable working and construction platforms, construction cranes, hoist cranes, hoist apparatus, elevator and lift devices, motors and engines for lifts, elevators and platforms, conveyer and transporters; rental of structural parts and fittings for the aforesaid building and construction equipment | SECTION 70 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ALIMAK HEK GROUP AB
- Other trademarks owned by Alimak Group Management AB
- Other trademarks owned by ALIMAK HEK GROUP AB
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Similar marks named CHAMPION
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 3, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Sep 3, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 16, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 12, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 27, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 24, 2020 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 12, 2020 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jun 12, 2020 | INPC | INVALIDATION PROCESSED | — |
| May 6, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 6, 2019 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 6, 2019 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Aug 19, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 15, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Mar 24, 2016 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Sep 11, 2015 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED | — |
| Sep 11, 2015 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 11, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 6, 2015 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 6, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 26, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 27, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 2, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 2, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 18, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 18, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 14, 2009 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Jul 14, 2009 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Jul 14, 2009 | OP.D | OPPOSITION DISMISSED NO. 999999 | — |
| Dec 26, 2008 | RFNP | REFUSAL PROCESSED BY IB | — |
| Nov 25, 2008 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Nov 24, 2008 | OPNS | OPPOSITION NOTICE (IB REFUSAL) SENT TO IB | — |
| Nov 22, 2008 | OPNC | OPPOSITION NOTICE (IB REFUSAL) CREATED | — |
| Aug 7, 2008 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 24, 2008 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 24, 2008 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jun 20, 2008 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Jun 13, 2008 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 27, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 7, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 21, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 21, 2008 | ALIE | ASSIGNED TO LIE | — |
| Apr 16, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 24, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Mar 24, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 24, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 10, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Dec 20, 2007 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Nov 19, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 19, 2007 | PAPER RECEIVED | — | |
| Jun 1, 2007 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 10, 2007 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 10, 2007 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 8, 2007 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 7, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 26, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 23, 2007 | NWAP | NEW APPLICATION ENTERED | — |
| Feb 22, 2007 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |