Drawing for LTG AKTIENGESELLSCHAFT THE INNOVATION COMPANY

USPTO serial 79035083

LTG AKTIENGESELLSCHAFT THE INNOVATION COMPANY

Reviewed by CopyMark Law Group

Reg. 3505442Status 404
Filing date
Status date
Registration date
Sep 23, 2008
Examiner
MIDDLETON, BERNICE L
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LTG AKTIENGESELLSCHAFT THE INNOVATION COMPANY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

M. SCOTT ALPRIN

M. Scott Alprin Alprin Law Offices5 Pinehurst Circle, N.W.Washington, DC 20015UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Air filters for mechanical purposes; fans for mechanical and industrial purposes, namely, fans for machine engines; purification filters, namely, air purification filters for mechanical purposes; de-dusting apparatuses, namely, dust separators; aeration apparatuses and machines, namely, aerators; compacters, namely, air compactors, namely, air compressors; pressing machines, namely, air pressing machines, namely, compressed air pumps; compressors, namely, air compressors, compressors for air conditioning and compressors for humidifying machines; air inlets and outlets, namely, blowers for machines, air filters for mechanical purposes, air compressorsSECTION 71 - CANCELLED—
009Measuring and control devices for air conditioning and ventilator technology; volume flow regulator for domestic, commercial and industrial useSECTION 71 - CANCELLED—
011Ventilators for air conditioning, air-conditioning, heating, cooling, ventilation and exhaust, humidifying and dehumidifying systems and devices, as well as parts thereof, for use in rooms, build-ings, trains, ships and vehicles; ventilators for domestic, com-mercial and industrial use; air heaters, namely electric heaters for domestic, commercial and industrial use; evaporative air coolers; air filters for air conditioning units; nozzles as parts of ventilators and humidifiers; sprayer nozzles, air-volume control valves and stop valves as parts of air-conditioning systems; re-generative heat exchangers not being parts of a machine; hu-midity exchangers, namely, high pressure humidifier not being parts of machines; air outlets and inlets as parts of ventilators, humidifiers and ventilation fume hoods; induction devices, namely induction ovens for room heating; ventilator convector ovens for room heating and cooling; room cooling devices with fan, namely, ventilating fans for domestic, commercial and in-dustrial use; façade air-conditioning modules for decentralized heating, cooling, fresh-air supply, air circulation and air evacua-tion of rooms and buildings, namely, central air-conditioning in-stallations; air filtering units for process ventilation engineering and for filtering dust, fibres, chips, granules and paperSECTION 71 - CANCELLED—
035Providing expert opinions and economic forecasts relating to companies and business in the field of energy management and air circulation of buildings, plants, apparatus, devices and machines; business efficiency experts in the field of ventilation and room ventilation systems, apparatus, devices and machines; business management analyses, namely, analyses of enterprises for businesses in the field of ventilation and room ventilation systems, apparatus, devices and machinesSECTION 71 - CANCELLED—
042Technical planning, technical development, design planning, and measurement evaluations in the field of ventilation and room ventilation systems, apparatus, devices and machines as well as their components, for use in new buildings, refurbishment of buildings, industrial buildings, laboratories, vehicles, trains, ships and drying and disposal installations for air flows; technical simulation, namely, design and testing for new product devel-opment and developing programs for simulating experiments in the field of ventilation and room ventilation systems, apparatus, devices and machines as well as their components, for use in new buildings, refurbishment of buildings, industrial buildings, laboratories, vehicles, trains, ships and drying and disposal in-stallations for air flowsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 3, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 30, 2016DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Dec 30, 2016DETHDEATH OF INTERNATIONAL REGISTRATION—
Feb 27, 2016INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 27, 2016INPCINVALIDATION PROCESSED—
Dec 24, 2015INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 24, 2015C71TCANCELLED SECTION 71—
Jan 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 1, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 13, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 13, 2009FIMPFINAL DISPOSITION PROCESSED—
Dec 23, 2008FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 23, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 12, 2008OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Aug 28, 2008OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 28, 2008OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 8, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 18, 2008NPUBNOTICE OF PUBLICATION—
May 30, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 30, 2008ALIEASSIGNED TO LIE—
May 30, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 24, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 23, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 23, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 23, 2008TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 24, 2007CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 23, 2007CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 2, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 2, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 2, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 19, 2007RFNTREFUSAL PROCESSED BY IB—
Apr 2, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 2, 2007RFRRREFUSAL PROCESSED BY MPU—
Mar 30, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 29, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2007DOCKASSIGNED TO EXAMINER—
Mar 23, 2007NWAPNEW APPLICATION ENTERED—
Mar 22, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance