USPTO serial 79035464
CONVERTEAM
Reviewed by CopyMark Law Group
Reg. 3564789Status 404
- Filing date
- Status date
- Registration date
- Jan 20, 2009
- Examiner
- HELLMAN, ELI J
- Law office
- MADRID PROCESSING UNIT
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with CONVERTEAM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric motors for machines and electric generators; electrochemical generators; magnetohydrodynamic generators; turbines; turbochargers for internal combustion machines; industrial robots; dynamos; starter alternators; replacement parts for the aforesaid machines; systems for transforming electrical energy into mechanical energy comprised of motors and engines | SECTION 71 - CANCELLED | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, and more generally any other form of energy including mechanical energy, namely, electric switches, electric wires; electrical cables, ducts and transformers; electrical transformers, electric switches, circuit breakers, fuses, voltage surge protectors; electric relays; reactive power compensators; electric capacitors, electric coils, electric converters and inverters; semiconductor power elements; electric meters; electric batteries and accumulators; fuel cells; cryostats; battery chargers; electronic components, namely, piezoelectric switches; semiconductors; printed circuits; electron tubes; electrical conductors; wires and cables for communication and transport of energy; coupling sleeves and sheaths for electric cables; identity threads and identification sheaths for electric wires; equipment for welding, namely, welding torches, helmets and masks; cathodic protection equipment, namely, surge protectors; electrical conduits; prefabricated electrical substations, LCD boards and panels for monitoring and controlling energy production, decentralized power production stations consisting of electric generators; high-voltage electric equipment, namely, circuit breakers, electric isolating switches, lightning conductors, voltage dividers, namely, electronic, digital and optoelectronic voltage dividers for indoor and outdoor stations or stations under metal or insulated casings; medium and low-voltage electric equipment, namely, transformer panels and stations, electric switches, electric isolating switches, electrical components in the nature of electric contactors, lightning conductors, circuit breakers, electrical fuses; electrical transformers; electrical plugs; electrical sockets; commutators; junction boxes; voltage dividers; cut-out switches; static and rotary converters; energy converters; electrical resistors; rheostats; capacitors, magnets; electrical conductors made of all types of metal; scales; thermostats; acoustic membranes; relays, namely, remote control electric relays and electric relays; equipment and apparatus for electrical energy conversion, namely, electrical plug adapters and converters; systems for transforming electrical energy into mechanical energy, comprised of transformers, converters and variators; apparatus for automatic operation and control of processes of compression of petroleum, gas, gas products and liquid air for oil refineries and gas plants and replacement parts therefore, namely, a compression station comprised of switch breaker modules, pressure compensated power transformers, variable speed drives and high-speed motors | SECTION 71 - CANCELLED | — |
| 037 | Construction, maintenance and repair of installations for the production, transport and distribution of electricity and energy; construction, maintenance and repair of industrial robots, turbochargers for internal combustion machines, and electrical devices for ships and offshore well bores; maintenance, repair, replacement and tuning of components, parts or systems in variable speed drives, electrical controls, motors and generators, the foregoing goods for use in the fields of electrical engineering, electronics, mechanics, nuclear industry, electrochemistry and production, transformation, distribution and transport of energy; rental of variable speed drives, electrical controls and motors, the foregoing goods for use in the fields of electrical engineering, electronics, mechanics, nuclear industry, electrochemistry and production, transformation, distribution and transport of energy; constructing municipal infrastructure facilities for the production, transformation, distribution and transport of energy; maintenance and repair of variable speed drives, electrical controls, motors and generators, the foregoing goods relating to the fields of electrical engineering, mechanics, nuclear industry, electrochemistry and production, transformation, distribution and transport of energy | SECTION 71 - CANCELLED | — |
| 042 | Services provided by engineers or specialists, namely, engineering for the energy industry; installation design in the field of production, transformation, transport, distribution and industrial use of energy; scientific research; industrial research in the field of the energy industry; technical project studies, namely, conducting routine testing of electrical components for the energy industry; engineering services, namely, appraisals, estimates, research and reports for engineering projects; engineering, design, development and follow-up of turn-key projects for energy production, transformation, distribution and transport infrastructures; oil-well and offshore platform testing; quality control for others, rental of laboratory apparatus and instruments, the foregoing for use in the electrical engineering, electronic and electrochemical industries | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by CONVERTEAM GROUP
- Other trademarks owned by CONVERTEAM GROUP
- Other trademarks owned by CONVERTEAM GROUP
- Other trademarks owned by MAGENTA PARTICIPATIONS
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named CONVERTEAM
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 26, 2017 | UNDN | UNDELIVERABLE MAIL - NO ACTION TAKEN | — |
| Apr 7, 2017 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 10, 2017 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Mar 10, 2017 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| May 12, 2016 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| May 12, 2016 | INPC | INVALIDATION PROCESSED | — |
| Apr 21, 2016 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 21, 2015 | C71T | CANCELLED SECTION 71 | — |
| Jun 26, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 17, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 26, 2011 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Nov 19, 2010 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 3, 2010 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Sep 2, 2010 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Sep 28, 2009 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 1, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 1, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 20, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 20, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 4, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 15, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 29, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 29, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 25, 2008 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 11, 2008 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 11, 2008 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 3, 2008 | DMCC | DATA MODIFICATION COMPLETED | — |
| Aug 28, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 28, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 28, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 28, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 3, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 2, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 2, 2008 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Feb 15, 2008 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 4, 2008 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 7, 2007 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Dec 6, 2007 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 28, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 28, 2007 | ALIE | ASSIGNED TO LIE | — |
| Oct 24, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 23, 2007 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 23, 2007 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 23, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 23, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 23, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 10, 2007 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 24, 2007 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 24, 2007 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 20, 2007 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 19, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 5, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 5, 2007 | NWAP | NEW APPLICATION ENTERED | — |
| Apr 5, 2007 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |