Drawing for COMPES

USPTO serial 79035603

COMPES

Reviewed by CopyMark Law Group

Reg. 3496122Status 709
Filing date
Status date
Registration date
Sep 2, 2008
Examiner
MANDIR, FREDERICK
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with COMPES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

George A. Pelletier, Jr.

George A. Pelletier, Jr. Cantor Colburn LLP20 Church StreetFloor 22Hartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
006Metal moulds for foundry use; aluminum extrusion dies, namely, metal dies for aluminum extrusion; foundry chill-molds; metallic moulds for metal casting; metal moulds for forming cement products; moulds of metal for casting ceramic materials; forging moulds; wrought and semi-wrought iron for further manufacture; foundry screens for controlling grain sizes of mold sand; common metals and their alloys, namely, ingots, metal sheets, tubes, bars, rods and extrusions used for further manufacture; ductile iron and iron sold in bulk; aluminum and its alloys for further manufacture; cast and forged steel sold in bulk; nickel and nickel alloys sold in bulk; iron ores; ironmongery, namely, chains, tubes, pipes; small items of metal hardware, namely, bolts, nuts, dowels, thread rods, screws, plugs, metal pipe connectors, metal window handles, metal window knobs, metal door handles and metal door knobs; metal gates, armored main doors, metal ladders, metal window casements, metal window shutters, metal window frames, fences of metal, metal gazebos, pergolas and colonnades, metal overhead garage doors, terrace roofing of metal; metal bolts, metal locks and metal keys for doors, metal rivets, metal hooks, metal door stops, metal latches; building girders, joists and building framing made from steel; transportable buildings of metal; railroad tracks made from metal; non-electric metallic cables and wires; metal pipes; metal safesSECTION 71 - CANCELLED—
007Machines to support the process of metal extrusion; machines, namely, blanking presses, fodder presses, hydraulic presses for metalworking and industrial machine presses; machines, namely, wine presses, mechanical presses for metalworking, metal extrusion presses, photogravure printing presses and plywood presses; power tools, namely, drill presses, press dies for metal forming, printing presses, printing presses for ceramic material, punching presses for metalworking, rotary presses for textiles; stamping presses; press fabric for paper making machines; metalworking machines, namely, drilling tool-machines, drifting machines, milling machines, lathes, tube bending machines, boring machines, broaching machines, cutting machines, horning machines, lapping machines, metalworking machine tools, perforating machines, tubing mills, rolling mills, shaping machines, shearing machines, slotting machines, machine parts, namely, toolholders for metalworking machines; molding machines, piece casting machines, injection plastic molding machines, dies for use with machine tools, die-cutting and tapping machines, die-stamping machines, die-splitting machines, aluminum recovery machines, die-correcting machines, die-coupling machines, die machine tools, namely, rotary dies for cutting boxes for packaging industry and die holders, degreaser machines for use in metal working, dust removing machines, dyeing machines, engraving machines; sandblasting machines, parts of machines, namely, bolsters, inserts, knockouts, shears, stems, liners and containersSECTION 71 - CANCELLED—
009Software regarding the simulation of metal extrusion; software for the metal extrusion; computer software development tools, blank optical discs; blank record disks, blank CD-ROM for sound or video recording, personal computers, calculators, data processors, recorded computer operating programs, electric connectors, electric cables, electric wires; plumb bobs; plumb lines; magnetic telephone wires; electric coils; silicon wafers; optic fibre cables; measuring rulers, scales, carpenter's levels, electric converters, electric switches, inverters, automatic switchboards, electrical distribution boxes, electrical fuses, printed circuits, welding electrodes, protective masks; gloves and garments for protection against accidents, irradiation and fire; smoke detectors, fire alarms, spectacles, electric batteries, electric accumulatorsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 9, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 30, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 30, 2021INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Sep 2, 2017REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 1, 2016RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 20, 2014NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Aug 20, 2014C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Aug 20, 2014APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 7, 2014ES75TEAS SECTION 71 & 15 RECEIVED—
Dec 30, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 20, 2009CORVREVIEW OF CORRESPONDENCE COMPLETE—
Feb 2, 2009MAILPAPER RECEIVED—
Jan 5, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 5, 2009FIMPFINAL DISPOSITION PROCESSED—
Dec 2, 2008FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 2, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 17, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 28, 2008NPUBNOTICE OF PUBLICATION—
May 12, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 12, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 12, 2008XAECEXAMINER'S AMENDMENT ENTERED—
May 12, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 12, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
May 12, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 12, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2007ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Dec 3, 2007PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Nov 20, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 20, 2007ALIEASSIGNED TO LIE—
Oct 17, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 15, 2007TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 15, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 15, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 15, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 4, 2007RFNTREFUSAL PROCESSED BY IB—
Apr 13, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 13, 2007RFRRREFUSAL PROCESSED BY MPU—
Apr 12, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 11, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 9, 2007LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Apr 5, 2007DOCKASSIGNED TO EXAMINER—
Apr 5, 2007NWAPNEW APPLICATION ENTERED—
Apr 5, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance