Drawing for JUNG

USPTO serial 79037799

JUNG

Reviewed by CopyMark Law Group

Reg. 3666850Status 404
Filing date
Status date
Registration date
Aug 11, 2009
Examiner
MAHONEY, PAULA M
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with JUNG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Electric switches, namely, electric switches for appliances, namely, standard electrical switches, rocker switches, rotary switches, push button switches, push switches, pull cord switches, slide switches and multi gang switches; electrical sockets and socket adapters, electrical plugs, pilot light signal indicators, electrical connection boxes, electrical distribution boxes, housings for electrotechnical appliances, namely, flush mounting boxes, junction boxes; wall cover plates for electric and electronic devices; electric transformers; dimmers, namely, electrical devices for control and regulation of illumination; room thermostats, electric device speed regulators, namely, for electronic switches, fans, motors, lighting, and electrical signals; electronic switches and push button switches for control and adjustment, namely, electric switches for appliances, electronic displays, sound, lighting, electronic signal, voltage regulators, electrical regulators, fan controls, temperature controls, alarm controls, video controls, sound controls, smoke and gas detection and software communication; voltage control guides, namely, regulators for low voltage rope and rail systems; overvoltage protection devices, namely, voltage regulators; earth leakage breakers, namely, circuit leakage breakers, namely, voltage surge protectors, fuses, current surge protectors, sensors, electrical socket and socket adaptor protectors, and transformer protectors; main protection devices, namely, voltage surge protectors; electrical sensors and devices for recognition of movement, sound, brightness, gas, smoke, liquid, temperature and/or other physical dimensions for use in individual and industrial building management systems; passive infrared detectors for control and/or detection, namely, infrared sensoring systems comprised of infrared transmitters and detectors for physical control of buildings and motion detections; ultrasonic movement detectors for control and/or detection, namely, ultrasonic movement sensoring detectors for physical control of buildings and motion detections; electronic components/devices with wireless infrared or radar control for control and/or adjustment, namely, infrared device detectors and controllers and radar detectors and controllers; remote operating electrical switches; electric and optical devices for news and data processing, transmitting, memorizing, control and output, namely, optical readers and storage devices; switching, controlling, measuring and recording devices and appliances, namely, voltage controls, electric current controls, electronic displays, sound, lighting, electronic signal, sensors, voltage regulators, electrical regulators, fan control, temperature controls, alarm controls, video controls, smoke and gas sensors, microphones, sound recorders, speakers, and software communication; electronic burglar alarms; electrical, signaling, alarming, warning, displaying, measuring, registering, monitoring, controlling and switching devices and instruments, namely, smoke and fire detectors and alarms; devices for the recording, transmission, sending, reproduction, receipt, emission, elaboration and treatment as well as for the production of signals, sounds and/or picture, namely, signal, sound and picture receivers, tuners, amplifiers, transmitters and monitorsSECTION 71 - CANCELLED—
037Repair, maintenance and servicing of the goods and systems of electric switches, namely, electric switches for appliances, namely, standard electrical switches, rocker switches, rotary switches, push button switches, push switches, pull cord switches, slide switches and multi gang switches; electrical sockets and socket adapters, electrical plugs, pilot light signal indicators, electrical connection boxes, electrical distribution boxes, housings for electrotechnical appliances, namely, flush mounting boxes, junction boxes; wall cover plates for electric and electronic devices; electric transformers; dimmers, namely, electrical devices for control and regulation of illumination; room thermostats, electric device speed regulators; electronic switches and push button switches for control and adjustment; voltage control guides, namely, regulators for low voltage rope and rail systems; overvoltage protection devices, namely, voltage regulators; earth leakage breakers, namely, circuit leakage breakers, main protection devices, namely, voltage surge protectors; electrical sensors and devices for recognition of movement, sound, brightness, gas, smoke, liquid, temperature and/or other physical dimensions for use in individual and industrial building management systems; passive infrared detectors for control and/or detection, namely, infrared sensoring systems comprised of infrared transmitters and detectors for physical control of buildings and motion detections; ultrasonic movement detectors for control and/or detection, namely, ultrasonic movement sensoring detectors for physical control of buildings and motion detections; electronic components/devices with wireless infrared or radar control for control and/or adjustment, namely, infrared device detectors and controllers and radar detectors and controllers; remote operating electrical switches; electric and optical devices for news and data processing, transmitting, memorizing, control and output, namely, optical readers and storage devices; switching, controlling, measuring and recording devices and appliances; electronic burglar alarms; electrical, signaling, alarming, warning, displaying, measuring, registering, monitoring, controlling and switching devices and instruments, namely, smoke and fire detectors and alarms; devices for the recording, transmission, sending, reproduction, receipt, emission, elaboration and treatment as well as for the production of signals, sounds and/or picture, namely, signal, sound and picture receivers, tuners, amplifiers, transmitters and monitorsSECTION 71 - CANCELLED—
042Computer software design, production and rentalSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 22, 2017DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Sep 22, 2017DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 24, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 24, 2017XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Feb 23, 2017XXCRGENERIC MADRID TRANSACTION CREATED—
Nov 18, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 18, 2016C71TCANCELLED SECTION 71—
Jan 27, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 25, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 25, 2009FIMPFINAL DISPOSITION PROCESSED—
Nov 11, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 11, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 26, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 6, 2009NPUBNOTICE OF PUBLICATION—
Apr 17, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 17, 2009ALIEASSIGNED TO LIE—
Apr 16, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 18, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 18, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 18, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 2, 2008OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 13, 2008OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 13, 2008OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 18, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 18, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 10, 2008PETGPETITION TO REVIVE-GRANTED—
Sep 10, 2008PROATEAS PETITION TO REVIVE RECEIVED—
Sep 2, 2008MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Sep 1, 2008ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Feb 1, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 21, 2007TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 21, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 21, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 21, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2007RFNTREFUSAL PROCESSED BY IB—
Jun 28, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 28, 2007RFRRREFUSAL PROCESSED BY MPU—
Jun 28, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 27, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 18, 2007DOCKASSIGNED TO EXAMINER—
Jun 8, 2007NWAPNEW APPLICATION ENTERED—
Jun 7, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance