USPTO serial 79039020
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
DE
44263 Dortmund, DE
44263 Dortmund, DE
44263 Dortmund, DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
JONATHAN MYERS LUCAS & MERCANTI, LLP30 BROAD STREET21ST FLOORNEW YORK, NY 10004| Class | Description | Status | First use |
|---|---|---|---|
| 007 | PUMPS EXCEPT FOR PUMPS FOR MEDICAL PURPOSES, NAMELY, PUMPS FOR HEATING UNITS, [ AGRICULTURAL PUMPS, ] SUBMERSIBLE PUMPS, [ BOREHOLE PUMPS, HIGH PRESSURE CENTRIFUGAL PUMPS, PUMPS FOR PRESSURE BOOSTING, ] HEATING INSTALLATION PUMPS, [ COOLING INSTALLATION PUMPS, PUMPS FOR MACHINES EXCEPT PUMPS FOR MEDICAL PURPOSES, HIGH PRESSURE PUMPS FOR WASHING APPLIANCES AND INSTALLATIONS; ] BUILDING INSTALLATION PUMPS, NAMELY, PUMPS FOR HEATING INSTALLATIONS, [ COOLING INSTALLATIONS, FRESH WATER SUPPLY INSTALLATIONS, WASTEWATER INSTALLATIONS, ] SEWAGE AND FECES TREATMENT INSTALLATIONS; [ ELECTRICAL WATER PUMPS EXCEPT FOR PUMPS FOR MEDICAL PURPOSES, NAMELY, WATER SUPPLY PUMPS, ] SEWAGE TREATMENT PUMPS, PUMPS FOR [ SWIMMING POOLS, WHIRLPOOLS, BATHS, ] PONDS, WATER FILTERING UNITS [ ; INDUSTRIAL ELECTRIC MOTORS OTHER THAN FOR LAND VEHICLES, NAMELY, ELECTRIC MOTORS FOR MACHINES AND PUMPS; SPARE PARTS FOR ELECTRIC PUMPS, NAMELY, FILTERS ] | ACTIVE | — |
| 009 | [ REGULATING AND CONTROLLING APPARATUS, NAMELY, SWITCHING DEVICES FOR THE OPERATION OF ONE OR MORE PUMPS WITH A DRIVE MOTOR, CONTROL UNITS IN THE NATURE OF SWITCH BOXES AND OPERATING UNITS FOR THE ELECTRICAL CONNECTION OF AC AND THREE PHASE PUMPS, FLOW REGULATORS FOR COMMERCIAL AND DOMESTIC USE, ELECTRONIC FLOW AND PRESSURE CONTROLLERS; ELECTRO-TECHNICAL APPARATUS AND INSTRUMENTS, NAMELY, DRY-RUNNING PROTECTION SWITCHES, PRESSURE SWITCHES, FLOAT SWITCHES, IMMERSION PROBES, ELECTRIC COILS, TIME SWITCHES, PRESSURE SENSORS, ELECTRIC CONTROL PANELS, SWITCHGEARS FOR APPLICATION AS CONTACTOR FOR AC AND THREE-PHASE CURRENT PUMPS; OPERATIONAL MONITORING MEANS FOR SYSTEMS COMPRISING AT LEAST A PUMP OR A MOTOR, FOR MEASURING, TEMPERATURE, CURRENT, PRESSURE OR WATER LEVEL, FOR MONITORING AND INDICATING OPERATING STATUS OF THE PUMP OR MOTOR, AND FOR PROVIDING A WARNING SIGNAL IN CASE OF REACHING A CERTAIN MEASURED VALUE; ELECTRONIC OPERATIONAL MONITORING UNITS FOR CONTROL AND CHECK OF OPERATING STATUS OF ELECTRIC PUMPS; ELECTRICAL CONNECTION PARTS, NAMELY, INSULATED ELECTRICAL CONNECTORS; FIRE-FIGHTING EQUIPMENT, NAMELY, SPRINKLERS; LABORATORY EQUIPMENT FOR MEASURING AND EVALUATING WATER QUALITY, NAMELY, ELECTRONIC WATER QUALITY ANALYZER; FUEL CELLS; COMPUTER SOFTWARE FOR USE IN CONTROL AND MONITORING OF PUMPS AND MOTORS, SOFTWARE FOR USE IN DATABASE MANAGEMENT ] | SECTION 71 - CANCELLED | — |
| 011 | [ HEATING INSTALLATIONS, NAMELY, HOT WATER HEATING INSTALLATIONS, RADIATORS, ELECTRIC HEATING CABLES, HEATING BOILERS, HEAT PUMPS, HEAT AND STEAM ACCUMULATORS, HEAT EXCHANGER, SOLAR COLLECTORS FOR HEATING INSTALLATIONS; HOT-WATER SPACE HEATING APPARATUS, HEATING APPARATUS, NAMELY, PUMPS FOR DOMESTIC HOT WATER CIRCULATORS, SECONDARY CIRCULATORS FOR MECHANICAL BUILDING AND INDUSTRIAL SERVICES, SOLAR THERMIC PUMPS AND PARTS THEREFOR; HOT-WATER HEATERS, NAMELY, CENTRAL HOT WATER HEATERS, HOT WATER CIRCULATING PUMPS FOR HOT WATER CIRCULATORS, SECONDARY AND SERVICE WATER HEATERS AND OPEN CONDENSATION WATER HEATERS, GLANDLESS PUMPS FOR HOT WATER HEATERS OF ALL KINDS, AIR CONDITIONING PLANTS, CLOSED CHILLED WATER CIRCULATORS, INDUSTRIAL CIRCULATORS AND PARTS THEREFOR; HOT WATER APPARATUS, NAMELY, HOT WATER TANKS, HEATING BOILERS, NAMELY, ELECTRICAL BOILERS, FURNACE BOILERS, INDUSTRIAL BOILERS; HEATING ELEMENTS, NAMELY, ELECTRICAL HEATING CABLES; AIR CONDITIONING INSTALLATIONS, NAMELY, GLANDLESS PUMPS; HEAT PUMPS, HEAT ACCUMULATORS, PRESSURE ACCUMULATORS AS PART OF HEATING AND WATER CONDUIT INSTALLATION, NAMELY, HEAT ACCUMULATORS, STEAM ACCUMULATORS; INSULATION TUBES SOLD AS A COMPONENT OF PUMPS AND HEATING AND/OR WATER CONDUIT INSTALLATIONS, NAMELY, CERAMIC ENAMEL FIBER INSULATION FOR PUMPS AND HEATING AND/OR WATER CONDUITS INSTALLATIONS, GLASS FIBER INSULATION FOR PUMPS AND HEATING AND/OR WATER CONDUITS INSTALLATIONS, GLASS AND MINERAL WOOL INSULATION FOR PUMPS AND HEATING AND/OR WATER CONDUITS INSTALLATIONS, GLASS AND MINERAL WOOL INSULATION FOR PUMPS AND HEATING AND/OR WATER CONDUITS INSTALLATIONS, THERMAL INSULATION FOR PUMPS AND HEATING AND/OR WATER CONDUITS INSTALLATIONS ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| May 16, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 26, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 1, 2019 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 21, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 21, 2018 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| May 21, 2018 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| May 16, 2018 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jul 22, 2017 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jun 15, 2017 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Nov 20, 2015 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 4, 2015 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 4, 2015 | INPC | INVALIDATION PROCESSED | — |
| Oct 5, 2015 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 5, 2015 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Feb 5, 2015 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Feb 5, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 19, 2015 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Dec 30, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 13, 2009 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Oct 2, 2009 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Nov 7, 2008 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 7, 2008 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 23, 2008 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Oct 22, 2008 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 22, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 6, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 16, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 28, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 26, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 11, 2008 | CFIT | CASE FILE IN TICRS | — |
| Mar 11, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Mar 11, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 6, 2008 | ALIE | ASSIGNED TO LIE | — |
| Feb 8, 2008 | PAPER RECEIVED | — | |
| Sep 14, 2007 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 27, 2007 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 27, 2007 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 27, 2007 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 26, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 24, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 6, 2007 | NWAP | NEW APPLICATION ENTERED | — |
| Jul 5, 2007 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |