Drawing for WILO

USPTO serial 79039484

WILO

Reviewed by CopyMark Law Group

Reg. 3520768Status 404
Filing date
Status date
Registration date
Oct 21, 2008
Examiner
BLANE, SUZANNE
Law office

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WILO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JONATHAN MYERS

JONATHAN MYERS LUCAS & MERCANTI, LLP30 BROAD STREET21ST FLOORNEW YORK, NY 10004

Goods and services

ClassDescriptionStatusFirst use
007PUMPS EXCEPT FOR PUMPS FOR MEDICAL PURPOSES, NAMELY, PUMPS FOR HEATING UNITS, [ AGRICULTURAL PUMPS, ] SUBMERSIBLE PUMPS, [ BOREHOLE PUMPS, HIGH PRESSURE CENTRIFUGAL PUMPS, PUMPS FOR PRESSURE BOOSTING, ] HEATING INSTALLATION PUMPS, [ COOLING INSTALLATION PUMPS, PUMPS FOR MACHINES EXCEPT PUMPS FOR MEDICAL PURPOSES, HIGH PRESSURE PUMPS FOR WASHING APPLIANCES AND INSTALLATIONS; ] BUILDING INSTALLATION PUMPS, NAMELY, PUMPS FOR HEATING INSTALLATIONS, [ COOLING INSTALLATIONS, FRESH WATER SUPPLY INSTALLATIONS, WASTEWATER INSTALLATIONS, ] SEWAGE AND FECES TREATMENT INSTALLATIONS; [ ELECTRICAL WATER PUMPS EXCEPT FOR PUMPS FOR MEDICAL PURPOSES, NAMELY, WATER SUPPLY PUMPS, ] SEWAGE TREATMENT PUMPS, PUMPS FOR [ SWIMMING POOLS, WHIRLPOOLS, BATHS, ] PONDS, WATER FILTERING UNITS [ ; INDUSTRIAL ELECTRIC MOTORS OTHER THAN FOR LAND VEHICLES, NAMELY, ELECTRIC MOTORS FOR MACHINES AND PUMPS; SPARE PARTS FOR ELECTRIC PUMPS, NAMELY, FILTERS ]SECTION 70 - CANCELLED
009[ REGULATING AND CONTROLLING APPARATUS, NAMELY, SWITCHING DEVICES FOR THE OPERATION OF ONE OR MOPE PUMPS WITH A DRIVE MOTOR, CONTROL UNITS IN THE NATURE OF SWITCH BOXES AND OPERATING UNITS FOR THE ELECTRICAL CONNECTION OF AC AND THREE PHASE PUMPS, FLOW REGULATORS FOR COMMERCIAL AND DOMESTIC USE, ELECTRONIC FLOW AND PRESSURE CONTROLLERS; ELECTRO-TECHNICAL APPARATUS AND INSTRUMENTS, NAMELY, DRY-RUNNING PROTECTION SWITCHES, PRESSURE SWITCHES, FLOAT SWITCHES, IMMERSION PROBES, ELECTRIC COILS, TIME SWITCHES, PRESSURE SENSORS, ELECTRIC CONTROL PANELS, SWITCH GEARS FOR APPLICATION AS CONTRACTOR FOR AC AND THREE-PHASE CURRENT PUMPS; OPERATIONAL MONITORING MEANS FOR SYSTEMS COMPRISING AT LEAST A PUMP OR A MOTOR, FOR MEASURING, TEMPERATURE, CURRENT, PRESSURE OR WATER LEVEL, FOR MONITORING AND INDICATING OPERATING STATUS OF THE PUMP OR MOTOR, AND FOR PROVIDING A WARNING SIGNAL IN CASE OF REACHING A CERTAIN MEASURED VALUE; ELECTRONIC OPERATIONAL MONITORING UNITS FOR CONTROL AND CHECK OF OPERATING STATUS OF ELECTRIC PUMPS; ELECTRICAL CONNECTION PARTS, NAMELY, INSULATED ELECTRICAL CONNECTORS; FIRE-FIGHTING EQUIPMENT, NAMELY, SPRINKLERS; LABORATORY EQUIPMENT FOR MEASURING AND EVALUATING WATER QUALITY, NAMELY, ELECTRONIC WATER QUALITY ANALYZER; FUEL CELLS; COMPUTER SOFTWARE FOR USE IN CONTROL AND MONITORING OF PUMPS AND MOTORS, SOFTWARE FOR USE IN DATABASE MANAGEMENT ]SECTION 71 - CANCELLED
011[ HEATING INSTALLATIONS, NAMELY, HOT WATER HEATING INSTALLATIONS COMPRISING RADIATORS, ELECTRIC HEATING CABLES, HEATING BOILERS, HEAT PUMPS, HEAT AND STEAM ACCUMULATORS, HEAT-EXCHANGERS AND SOLAR COLLECTORS AS COMPONENTS OF HEATING INSTALLATIONS; HOT-WATER SPACE HEATING APPARATUS COMPRISING PUMPS FOR DOMESTIC HOT WATER CIRCULATORS, SECONDARY CIRCULATORS FOR MECHANICAL BUILDING AND INDUSTRIAL SERVICES, SOLAR THERMIC PUMPS AND PARTS THEREFOR AS COMPONENTS OF THE HOT WATER SPACE HEATING APPARATUS; HOT-WATER HEATERS COMPRISING CENTRAL HOT WATER HEATERS, HOT WATER CIRCULATING PUMPS FOR HOT WATER CIRCULATORS, SECONDARY AND SERVICE WATER HEATERS AND OPEN CONDENSATION WATER HEATERS, GLANDLESS PUMPS FOR HOT WATER HEATERS OF ALL KINDS, CLOSED CHILLED WATER CIRCULATORS, INDUSTRIAL CIRCULATORS AND PARTS THEREFOR; HOT WATER APPARATUS, NAMELY, HOT WATER TANKS, HEATING BOILERS, NAMELY, ELECTRICAL BOILERS, FURNACE BOILERS, INDUSTRIAL BOILERS; HEATING ELEMENTS, NAMELY, ELECTRICAL HEATING CABLES; AIR CONDITIONING INSTALLATIONS; AIR CONDITIONING INSTALLATIONS COMPRISING GLANDLESS PUMPS AS COMPONENTS OF THE INSTALLATIONS; HEAT PUMPS, HEAT ACCUMULATORS AND PRESSURE ACCUMULATORS AS COMPONENTS OF HEATING AND WATER CONDUIT INSTALLATION, NAMELY, HEAT ACCUMULATORS, STEAM ACCUMULATORS; INSULATION TUBES AND PUMPS SOLD AS A COMPONENT OF HEATING AND/OR WATER CONDUIT INSTALLATIONS, NAMELY, CERAMIC ENAMEL FIBER INSULATION FOR PUMPS AS COMPONENTS OF HEATING AND/OR WATER CONDUITS INSTALLATIONS, GLASS FIBER INSULATION FOR PUMPS AS COMPONENTS OF HEATING AND/OR WATER CONDUITS INSTALLATIONS, GLASS AND MINERAL WOOL INSULATION FOR PUMPS AS COMPONENTS OF HEATING AND/OR WATER CONDUITS INSTALLATIONS, THERMAL INSULATION FOR PUMPS AS COMPONENTS OF HEATING AND/OR WATER CONDUITS INSTALLATIONS ]SECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 8, 2017DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Dec 8, 2017DETHDEATH OF INTERNATIONAL REGISTRATION
Oct 21, 2017REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Dec 11, 2015INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Nov 18, 2015INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Nov 18, 2015INPCINVALIDATION PROCESSED
Oct 9, 2015INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Feb 9, 2015NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Feb 9, 2015C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
Feb 9, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 22, 2015ES75TEAS SECTION 71 & 15 RECEIVED
Jan 6, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Oct 13, 2009CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Oct 2, 2009CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Feb 2, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 2, 2009FIMPFINAL DISPOSITION PROCESSED
Jan 21, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 23, 2008CHLDCHANGE OF OWNER RECEIVED FROM IB
Oct 21, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 5, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 16, 2008NPUBNOTICE OF PUBLICATION
Jul 1, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jun 28, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jun 27, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 27, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 27, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 25, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 24, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 23, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Apr 4, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Mar 27, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 26, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 13, 2008ACECAMENDMENT FROM APPLICANT ENTERED
Mar 13, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 13, 2008ALIEASSIGNED TO LIE
Feb 14, 2008MAILPAPER RECEIVED
Sep 14, 2007RFNTREFUSAL PROCESSED BY IB
Aug 27, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 27, 2007RFRRREFUSAL PROCESSED BY MPU
Aug 27, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 26, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 24, 2007DOCKASSIGNED TO EXAMINER
Jul 13, 2007NWAPNEW APPLICATION ENTERED
Jul 12, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance