USPTO serial 79040607
Serial No. 79040607
Reviewed by CopyMark Law Group
Reg. 3587236Status 706Registered
- Filing date
- Status date
- Registration date
- Mar 10, 2009
- Examiner
- KUNG, KAELIE ELIZABETH
- Law office
- GENERIC WEB UPDATE
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with Serial No. 79040607?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrzej Malarz
111 Brittany CourtClifton, NJ 07013United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal pipes and tubes, metal water-pipe valves, metal water-pipe couplings | ACTIVE | — |
| 009 | Apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, measuring, control and regulating devices for space heating and air conditioning technology; apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, thermostats, temperature regulators in the nature of feed back controllers, temperature regulating solenoid valves for use with energy producers, temperature regulating slides in the nature of valves for use with energy supplier, temperature sensors, temperature control devices in the nature of automatic temperature controllers, thermometers; apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, pressostats being pressure controllers, pressure regulators in the nature of feed back pressure controllers, pressure regulating valves for use with solar energy heating, pressure regulating slides in the nature of pressure valves for use with energy distribution, pressure sensors, pressure controlling devices in the nature of pressure control equipment for preventing blowouts; apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, flow-through regulators for use in the commercial climate control field, flow-through regulator valves for use in the domestic field, flow-through regulator slides in the nature of control valves for regulating the flow of gases and liquids for use with energy distribution for use in the domestic field, flow-through control devices in the nature of control valves for regulating the flow of gases and liquids; apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, measurement reading devices in the nature of computer peripheral equipment, measurement feelers in the nature of sensors for metering , regulators being automatic controllers for liquid lines, two-point regulators being automatic controllers for liquid throughput, three-point regulators being proportional controllers for liquid processors, proportional regulators being flow controllers for climate control installations; apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, control devices in the nature of electric control panels for temperature, pressure, moisture and flow-through of heating and air conditioning systems; apparatus and instruments for measuring, signalling, temperature, humidity, pressure and flow control, namely, automatic valves, barometers, warning devices, namely, bells, alarm circuit breakers, electrical cables, electrical circuit boards, electrical conductors, laboratory filters, pressure gauges, water meters, electric motion sensitive switches, automatic nozzles, electric plugs, pressure indicating plugs for valves, rheostats, solenoid valves, electrical switches, thermometers not for medical use, thermostats | ACTIVE | — |
| 011 | Heating, cooling, water supply apparatus and sanitary installations, namely, boilers, water heaters, central heating apparatus in the nature of radiators, furnaces, valves for air conditioners, heat pumps, hot water heaters, hot water tanks, solar collectors, oil burners, gas burners, thermostatic valves, plumbing fittings, namely, valves; heating panels in the nature of heating elements, and heat exchangers not being parts of machines | ACTIVE | — |
| 037 | installation of metal pipes, metal pipe and water pipe fittings and metal valves for water pipes, boilers, water heaters, central heating apparatus in the nature of radiators, furnaces, heat pumps, heating panels in the nature of heating elements, and heat exchangers not being parts of machines, control and regulating devices in the nature of thermostats for space heating and air conditioning technology; and repair of metal pipes, metal pipe and water pipe fittings and metal valves for water pipes, boilers, water heaters, central heating apparatus in the nature of radiators, furnaces, heat pumps, heating panels in the nature of heating elements, and heat exchangers not being parts of machines, control and regulating devices in the nature of thennostats for space heating and air conditioning technology | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Hans Georg Baunach
- Other trademarks owned by Hans Georg Baunach
- Other trademarks owned by Hans Georg Baunach
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 15, 2025 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| Mar 15, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 15, 2025 | EWOR | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED | — |
| Mar 15, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 15, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 15, 2025 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Mar 15, 2025 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Oct 29, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Feb 14, 2019 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Feb 14, 2019 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Feb 10, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Mar 12, 2015 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - MAILED | — |
| Mar 12, 2015 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Mar 12, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 9, 2015 | 71AF | REGISTERED-SEC.71 FILED | — |
| Mar 9, 2015 | PAPER RECEIVED | — | |
| May 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 2, 2011 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 19, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 19, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 10, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 10, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 29, 2009 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 15, 2009 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 15, 2009 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 23, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 3, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 14, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 13, 2008 | ALIE | ASSIGNED TO LIE | — |
| Nov 13, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 24, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Oct 24, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 20, 2008 | PAPER RECEIVED | — | |
| Apr 17, 2008 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 16, 2008 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 3, 2008 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 3, 2008 | ALIE | ASSIGNED TO LIE | — |
| Mar 24, 2008 | PAPER RECEIVED | — | |
| Mar 13, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Mar 13, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 13, 2008 | ALIE | ASSIGNED TO LIE | — |
| Feb 19, 2008 | PAPER RECEIVED | — | |
| Aug 31, 2007 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 15, 2007 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 15, 2007 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 15, 2007 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 14, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 13, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 13, 2007 | NWAP | NEW APPLICATION ENTERED | — |
| Aug 10, 2007 | LIMS | LIMITATION OF GOODS/SERVICES FROM IB ENTERED | — |
| Aug 9, 2007 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |