Drawing for INTEC ENGINEERING

USPTO serial 79040807

INTEC ENGINEERING

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
GLASSER, CARYN
Law office
TMEG LAW OFFICE 108 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with INTEC ENGINEERING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mary Catherine Merz

MARY CATHERINE MERZ MERZ & ASSOCIATES, P.C.1140 LAKE STREET, SUITE #304OAK PARK, IL 60301-1051UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
037Construction of offshore platforms and facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, platforms for research and production of oil and gas, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; repair and maintenance services, namely maintenance and repair of apparatus and installations at offshore locations on and under water for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of ships; maintenance and repair of floating offshore equipment for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of pipelines; maintenance and repair of steel constructions and civil engineering constructions, namely offshore platforms and facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers bridges, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; maintenance and repair of industrial installations, namely industrial installations for oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of machines for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; maintenance and repair of machines for use in vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; building and constructing pipelines, drainage systems, oil and gas production facilities, light-installations, roads, wells and shafts; repair of vessels, the dragging of rivers and other waterways; installation of platforms; laying, repairing, maintaining and burying pipelines; construction of drilling pilings on land and sea; mining extraction; extraction of oil, gas and other energy-products by drilling and pumping; rental of apparatus for drilling and pumping of oil, gas and other energy-productsSECTION 70 - CANCELLED—
039Transportation by truck, rail, air, ships and pipelines, namely distribution of energy, oil and gas; storage of energy, oil and gas; consultation and information in the field of storage and transportation of oil, gas and other energy products; rental of equipment used for transportation of oil, gas and other energy products by truck, rail, air, ships and pipelinesSECTION 70 - CANCELLED—
042Design, planning and consultation for construction of offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilites, refineries for oil, gas and other energy-products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; design of apparatus and installations for offshore locations on and under water for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; design of apparatus and installations for ships and floating offshore equipment for use in use in offshore oil and gas exploration, drilling, pumping, transporting and refining; design of apparatus and installations for pipelines, steel constructions namely offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks, and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; design of apparatus and installations for industrial installations, namely industrial installations for oil and gas exploration, drilling, pumping, transporting and refining; design of apparatus and installations for machines for use in offshore oil and gas exploration, drilling, pumping, transporting and refining; scientific and industrial research and technical studies; technical design of offshore facilities, oil and gas platforms, buildings, marine construction, pier construction, pipeline construction, steel structure construction works, underwater building and construction, floating facilities, refineries for oil, gas and other energy products, vessels, boats, ships, tugboats, fishing boats, dragging boats, dry docks and dry dock facilities, wharfs, quays, panellings, dams, piers, bridges, offshore platforms, platforms for research and production of oil, light towers and light houses, platforms for sulfur mining, docking and mooring places, loading docks, power installations and industrial installations and factories; quality control services in the fields of construction, repair and maintenance of equipment in use for oil and gas exploration, drilling, pumping, transporting and refining; quality control services in the fields of transportation, storage, research and extraction of oil, gas and other energy productsSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 7, 2017DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 6, 2017DETHDEATH OF INTERNATIONAL REGISTRATION—
Jul 4, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 15, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 5, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 21, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 25, 2009FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 12, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 12, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 5, 2009OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 22, 2009OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 22, 2009OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 12, 2008MAB0ABANDONMENT NOTICE MAILED - INCOMPLETE RESPONSE—
Nov 12, 2008ABN0ABANDONMENT - INCOMPLETE RESPONSE—
Nov 3, 2008DMCCDATA MODIFICATION COMPLETED—
Oct 8, 2008UNPRUNRESPONSIVE/DUPLICATE PAPER RECEIVED—
Oct 8, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 3, 2008ALIEASSIGNED TO LIE—
Sep 22, 2008MAILPAPER RECEIVED—
Mar 21, 2008GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 21, 2008GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 21, 2008CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 13, 2008TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 13, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 13, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 13, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2007RFNTREFUSAL PROCESSED BY IB—
Aug 24, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 24, 2007RFRRREFUSAL PROCESSED BY MPU—
Aug 24, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 23, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2007DOCKASSIGNED TO EXAMINER—
Aug 17, 2007NWAPNEW APPLICATION ENTERED—
Aug 16, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance