Drawing for MORE OUT OF ORE!

USPTO serial 79040967

MORE OUT OF ORE!

Reviewed by CopyMark Law Group

Reg. 3512700Status 404
Filing date
Status date
Registration date
Oct 7, 2008
Examiner
FENNESSY, EDWARD JOHN
Law office
TMEG LAW OFFICE 101

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MORE OUT OF ORE!?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph J. Orlando

Joseph J. Orlando Bucknam and Archer1077 Northern BoulevardRoslyn, NY 11576UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Sulphur, sulphuric acid, sulphuric dioxide, foundry sand, ammonium sulphate, baryta, drilling mud for use in oil well drilling coating, selenium and its compounds, chrome concentrate, mercury all of the foregoing for industrial, forestry, agricultural and scientific use; wood flour for use as a filler in the manufacture of paper and plastics, fire extinguishing compositions for the paper and plastic industry; welding flux, welding chemicals, namely, pickling pastes, pickling gels, neutralizing pastes, pre and post welding chemicals; patination agentsSECTION 71 - CANCELLED—
006Iron ore and calcine chromite concentrate, chromite ore, chromium pellets, common metal processing slags in powder, granule or pellets form; ferrochrome in powder, granule or slab form; copper in powder, granule or slab form; stainless steel, copper, zinc, nickel, aluminium and their alloys produced in rods, wires, pipes, tubes, wirebars, slabs, billets, sheets, strips, foils, coin blanks and token blanks, cartridge cups, cartridge and bullet blanks, hollow conductors form; stainless steel and nickel alloy filler metals; electrodes made of common metals or their alloys for the welding accessories industry; non-electric cables and wires of common metal; building materials of metal, namely, metal plates for building facadesSECTION 71 - CANCELLED—
007Casting machines for molten metal, upward continuous casting machines, casting wheels and take off/bosh tank machines for anodes; rolling machines for metal tubes, pipes, rods, wires, wirebars, slabs, billets, sheets, strips and foils; machines for the preparation of starting sheets and anodes and unloading of anodes and cathodes, stacking machines for slabs and ingots, stripping machines for cathodes or starting sheets, venturi scrubbers, mixer-settler cells; machines for flash smelting and converting of concentrates, flotation and dispersion machines for mineral processing, machines for preconcentration of ore; machines for physical separation of ore and minerals; machines for green anode plants and rodding shops; mills for grinding materials; thickener and clarifier machines for minerals, chemical and waste water industries; machines for briquetting, pelletizing and sintering of materials; machines for direct smelting of iron ore; machines for producing sulphuric acid; machines for cleaning waste water; machines for calcining and leaching ores and concentrates and other materials; machines for ion exchange and solvent extraction of materials; machines for treating, transferring and conveying of molten slag and molten metal; machines for fire refining of ores and concentrates; machines for drying materials, namely, concentratesSECTION 71 - CANCELLED—
009Testing and analyzing equipment, namely, x-ray and gamma ray apparatus fa or industrial use, neutron-activated and electrochemical element analyzers; sensors and instruments for detecting and sensing metals and other materials; minicomputers and microprocessors for digital process control and management in mining and mineral technology, metallurgy and non-organic chemical industry; superconductor cables, silicon wafers; copper anodes and cathodes; welding electrodes made of common metals or their alloys; electric busbar components, conduits, cables, wires, coaxial cables, conductors, profiles, commutator rods and connectors of copper or copper alloys or tin alloys or nickel alloys; electrostatic precipitators; computer software for process and process management and for monitoring and analyzing of processes in the mining and mineral technology, metallurgy and non-organic chemical industrySECTION 71 - CANCELLED—
011Fluidized bed combustion boilers and burners; submerged combustion evaporation units; fluidized bed units for reduction, calcining and roasting of ores and residues; waste heat boilers; cooling elements for smelting and melting furnaces; cooling elements for electric equipmentSECTION 71 - CANCELLED—
014Rods, wires, tubes, bars, billets, ingots, wirebars, slabs and sheets of precious metals; gold, silver, platinum, palladium and other precious metals and their alloys for raw and/or semi-processed goodsSECTION 71 - CANCELLED—
035Business management of mines, concentrators and metallurgical plants as well as for the energy producing, environmental protection, and non-organic chemical industriesSECTION 71 - CANCELLED—
037Building construction; Construction and initial operation of mines, concentrators and plants for metallurgy, energy producing, environmental protection and non-organic chemical industry; Installation, maintenance and repair of machines, apparatus and appliances used in mining and mineral technology, metallurgy, energy producing, metal working and environmental protection and non-organic chemical industry; Building construction consulting services in the mining and mineral technology fieldsSECTION 71 - CANCELLED—
040Consulting services in the fields of energy producing and metal working; consulting services in the field of metallurgySECTION 71 - CANCELLED—
042Environmental services, namely, technical consultation in the fields of environmental science and non-organic chemical engineering; Design of mines, concentrators and plants for metallurgy, energy production, environmental protection and non-organic chemical engineeringSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 23, 2017DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jun 23, 2017DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 17, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 14, 2016INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 14, 2016INPCINVALIDATION PROCESSED—
Jan 8, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 8, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 21, 2015GPNXNOTIFICATION PROCESSED BY IB—
May 8, 2015C71TCANCELLED SECTION 71—
Feb 17, 2015CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Feb 6, 2015CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 18, 2014ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 6, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 23, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 23, 2009FIMPFINAL DISPOSITION PROCESSED—
Jan 12, 2009COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jan 7, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 6, 2009PLGLASSIGNED TO PARALEGAL—
Nov 18, 2008ES7RTEAS SECTION 7 REQUEST RECEIVED—
Oct 7, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 22, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 2, 2008NPUBNOTICE OF PUBLICATION—
Jun 19, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 16, 2008CNEAEXAMINERS AMENDMENT MAILED—
Jun 16, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 16, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Jun 16, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 9, 2008DOCKASSIGNED TO EXAMINER—
Jun 9, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 5, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 18, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 17, 2008CNEAEXAMINERS AMENDMENT MAILED—
Apr 17, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 16, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Apr 16, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 10, 2008MAILPAPER RECEIVED—
Apr 10, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 9, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 19, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 19, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 19, 2008ALIEASSIGNED TO LIE—
Feb 27, 2008MAILPAPER RECEIVED—
Feb 20, 2008ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2008REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 20, 2007CHLDCHANGE OF OWNER RECEIVED FROM IB—
Sep 14, 2007RFNPREFUSAL PROCESSED BY IB—
Aug 28, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 28, 2007RFRRREFUSAL PROCESSED BY MPU—
Aug 28, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 27, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 24, 2007DOCKASSIGNED TO EXAMINER—
Aug 24, 2007NWAPNEW APPLICATION ENTERED—
Aug 23, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance