Drawing for AKER - THE PREFERRED PARTNER

USPTO serial 79045120

AKER - THE PREFERRED PARTNER

Reviewed by CopyMark Law Group

Reg. 3606172Status 404
Filing date
Status date
Registration date
Apr 14, 2009
Examiner
KUNG, KAELIE ELIZABETH
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with AKER - THE PREFERRED PARTNER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Sheldon H. Klein

Sheldon H. Klein Gray, Plant, Mooty, Mooty & Bennett, P.A.600 New Hampshire Ave., NWSuite 700Washington, DC 20037

Goods and services

ClassDescriptionStatusFirst use
007Oil and gas production machinery, apparatus being parts, equipment, systems or other apparatus or oil and gas well machinery, namely, drilling and workover systems comprising drilling derrick, workover risers, substructures, risers and riser systems, namely, production risers, drilling risers, service/workover risers and riser connectors and riser handling power tools, winches, windlasses, chain stoppers for use in equipping and building sea-going vessels and oil and gas drilling rigs; oil and gas well machinery, apparatus being parts, equipment, systems or other apparatus or oil and gas well machinery, namely, wellheads, and Christmas trees; subsea pumping, compression and processing systems comprising separation, crude oil conditioning, water treatment and/or injection, pumping/compression, and heat exchange mass transfer devices for use in subsea extraction, processing and exporting of oil and natural gas; oil and gas well machinery, apparatus being parts, equipment systems or other apparatus or oil and gas well machinery, namely, wireline, tractor and logging products, comprising wireline tractor devices, for functions such as scale removal, milling/side-tracking, sand-bailing, perforating and plug-setting for use down hole in the extraction, processing and exporting of oil and natural gas; electrical pumps, namely, fluidising pumps for medium consistency pumps, centrifugal pumps, line shaft pumps and multiphase pumps used for crude oil transportation, firefighting and seawater pumping systems, lift pumps, lift caissons, and booster pumps; heaters and heat exchangers being parts of machines, inert gas electric generators for production of liquefied natural gas, natural gas liquids and petroleum products; control modules, namely, pump control valves for products of combustible gases and recovery of chemicals and for the optimization of such processes; oil and gas well drilling machine and parts and fittings thereforSECTION 71 - CANCELLED—
012Ships, fast boats, sea-going vessels, and structural parts and fittings therefor for use in equipping, building, maintaining and fitting out sea-going vessels, ships and other fixed and floating vessels for the storage and transportation of gasSECTION 71 - CANCELLED—
020Furniture, mirrors, picture frames; all sorts of storage, filing and handling solutions, namely, shelves and brackets sold as a unitSECTION 71 - CANCELLED—
029Meat, fish, poultry and game; meat extracts; preserved, dried and cooked fruits and vegetables; jellies, jams, compotes; eggs, milk and milk products, excluding ice cream, ice milk and frozen yogurt; edible oils and fatsSECTION 71 - CANCELLED—
035Advertising and business management consultancy; business management; business management and consultation; business administration and management; business administration and office work; business operation, business administration and office functionsSECTION 71 - CANCELLED—
037Building construction; building construction and repair; repair and installation services relating to offshore oil and gas production plants and onshore industrial facilities including plants for the processing of waste water and the processing and manufacturing of nuclear materials, pharmaceuticals, metals, polymers and chemicals, oil refining and onshore oil and gas processing; construction, modification, repair and installation of pulp and paper plants and of chemical recovery, pollution control and energy generating energy plants for use in the chemical, pulp and paper industries; construction, modification, repair and installation of power plantsSECTION 71 - CANCELLED—
040Treatment of metalSECTION 71 - CANCELLED—
042Scientific research, industrial research, development of computer programs, design for others, and technological consultation in the technology field of the following, all in the fields of automated drilling, fixed and floated concrete platform/marine structure technology, down hole technology, reservoir technology, subsea technology, fixed and floating oil and gas platform technology, including hulls, jackets and riser systems, the processing, pumping, storage and transportation of oil and gas, petrochemical and biochemical process technology, pharmaceutical technology, nuclear waste and pumping technology, shipbuilding, ship and fixed and floating concrete platform instrumentations, processing ferrous and non-ferrous metals/ores, seafood, and biomarine product researchSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 2, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Mar 2, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Apr 21, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 20, 2016INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 20, 2016INPCINVALIDATION PROCESSED—
Jul 20, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 20, 2015C71TCANCELLED SECTION 71—
Dec 22, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 16, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 12, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 8, 2011CORVREVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED—
Aug 25, 2011ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 24, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 29, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 29, 2009FIMPFINAL DISPOSITION PROCESSED—
Jul 14, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 14, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 27, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 7, 2009NPUBNOTICE OF PUBLICATION—
Dec 20, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 20, 2008ALIEASSIGNED TO LIE—
Dec 19, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 18, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 18, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 18, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 26, 2008ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 26, 2008REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 19, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 18, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 28, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
May 28, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 28, 2008ALIEASSIGNED TO LIE—
May 23, 2008MAILPAPER RECEIVED—
Dec 14, 2007RFNTREFUSAL PROCESSED BY IB—
Nov 27, 2007RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 27, 2007RFRRREFUSAL PROCESSED BY MPU—
Nov 27, 2007RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 26, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 16, 2007DOCKASSIGNED TO EXAMINER—
Nov 16, 2007NWAPNEW APPLICATION ENTERED—
Nov 15, 2007REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance