USPTO serial 79046739
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michael C. Cerrati
Michael C. Cerrati Belzer PC2905 Bull StreetSavannah, GA 31405UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | [ Installation, construction, maintenance, and repair of ships, pipelines, steel constructions, and other constructions and industrial installations relating to large cargo on and under water; the laying, repair, maintenance and digging in of pipelines and cables; consultation regarding the repair of apparatuses and installations relating to ships, pipelines, steel constructions and other civil technical and shipbuilding constructions and industrial installations and machines relating to cargo on and under water; consultation relating to the mounting of ships, pipelines, steel constructions and other constructions and industrial installations and machines relating to cargo on and under water ] | SECTION 71 - CANCELLED | — |
| 039 | Transport by sea using ships and specialized vessels; transport on behalf of the offshore industry by ships and specialized vessels; transport of ships, yachts, dry docks, cranes, drag installations, drill and oil platforms; packaging and storage of goods and substances, namely, gasses, liquids and solids; logistic planning and consultation regarding transport, namely transport by sea of goods and cargo for others; services of a shipping company, namely, storage and transportation by sea of goods and cargo on and under water; rental of ships, shears and floating offshore specialized vessels as part of storage and transportation of goods and cargo for others; consultation and information regarding storage and transportation of goods and cargo on and under water | ACTIVE | — |
| 042 | [ Engineering, design, drafting and architectural consultation for the building, construction and repair of ships, pipelines, steel constructions, and other shipbuilding constructions and industrial installations relating to large cargo on and under water; scientific and industrial research and technical research in the field of transport engineering, marine engineering, structure engineering, and project engineering; providing technical designs on behalf of offshore shipbuilding constructions and industrial installations relating to large cargo on and under water; technical project studies regarding transport and storage of large cargo on and under water, namely, documenting and analyzing the transportation of large cargo, the strength of the ship or specialized vessel to use, assessing and anticipating the reaction of a particular cargo load in various waters and designing structures for optimum transport of the cargo, and creating diagrams representing a given cargo's load ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 19, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 18, 2019 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 20, 2019 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 20, 2019 | INPC | INVALIDATION PROCESSED | — |
| Sep 11, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 11, 2019 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jan 11, 2019 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Dec 20, 2018 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Oct 11, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 30, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 16, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 30, 2017 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Sep 14, 2017 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 21, 2015 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jan 21, 2015 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jan 21, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 22, 2014 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jan 6, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 8, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 8, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 30, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 30, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 14, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 24, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 11, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 11, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 8, 2008 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Sep 5, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 5, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 5, 2008 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Aug 29, 2008 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Aug 18, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 18, 2008 | ALIE | ASSIGNED TO LIE | — |
| Aug 11, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 11, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 11, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 11, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 8, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 14, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 14, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 12, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 11, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 21, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 21, 2007 | NWAP | NEW APPLICATION ENTERED | — |
| Dec 20, 2007 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |