USPTO serial 79047537
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
ModuSpec Engineering (International) BV
NL-4353 JA SEROOSKERKE, NL
Other trademarks owned by ModuSpec Engineering (International) BV
ModuSpec Engineering (International) BV
NL-4353 JA SEROOSKERKE, NL
Other trademarks owned by ModuSpec Engineering (International) BV
Lloyd's Register Drilling Integrity Services (International) B.V.
NL
Other trademarks owned by Lloyd's Register Drilling Integrity Services (International) B.V.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Laurel V. Dineff
LAUREL V. DINEFF DINEFF TRADEMARK LAW LIMITED160 N WACKER DRCHICAGO, IL 60606-1633UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Building construction; providing information in the field of building construction; construction management, namely, supervision and management of architectural construction activities performed with geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms and their installations, equipment, devices, engines, machines and their installations; services relating to the construction of drilling equipment for geological drilling, drilling rigs, drilling ships, mobile drilling installations and production platforms, their installations, equipment and devices, engines, machines, namely, construction planning, construction consultation, construction management; ancillary services to services in the area of construction, namely construction planning, construction consultation, construction management of drilling equipment for geological drilling, drilling rigs, drilling ships, mobile drilling installations and production platforms, their installations, equipment and devices, engines and machines; inspection services in the course of construction of drilling equipment for geological drilling, drilling rigs, drilling ships, mobile drilling installations and production platforms, their installations, equipment and devices, engines and machines; general construction contracting; carpentry contractor services; painting; installation of insulating materials; installation, maintenance and repair of lighting installations, heating, ventilation, cooling and sanitary facilities; plumbing services; installation of gas and water supply installations; laying of cables and pipelines; repair and maintenance of, buildings, geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms and their installations, equipment and devices, engines, machines and their installations; all the aforementioned services specifically in relation to geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms or their installations, equipment and devices, engines, machines and their installations | SECTION 71 - CANCELLED | — |
| 041 | Training services in the field of electrical drilling and drilling equipment, rig inspection for floaters, rig inspection for land, platform and jack-up rigs, sub-sea engineering and equipment, well control and equipment for Blow Out Preventers on floaters and surface Blow Out Preventers, accident and incident investigation, hazard awareness, hazard and operability studies, job safety analysis, workplace risk assessment and control training, asset and maintenance management, equipment inspection, conducting system and environmental audits, quality assessment, commissioning management and package engineering; educational services, namely, conducting courses in the field of electrical drilling and drilling equipment, rig inspection for floaters, rig inspection for land, platform and jack-up rigs, sub-sea engineering and equipment, well control and equipment for Blow Out Preventers on floaters and surface Blow Out Preventers, accident and incident investigation, hazard awareness, hazard and operability studies, job safety analysis, workplace risk assessment and control training, asset and maintenance management, equipment inspection, conducting system and environmental audits, quality assessment, commissioning management, package engineering; educational services provided in connection with training courses in the field of building construction, construction management, construction planning, construction consultation, general construction, carpentry contractor services, painting, installation of insulating materials, installation, maintenance and repair of lighting installations, heating, ventilation, cooling and sanitary facilities, plumbing services, installation of gas and water supply installations, laying of cables and pipelines, repair and maintenance of, buildings, geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms and their installations, equipment and devices, engines, machines and their installations, quality control for others, technical writing for others, technical inspection of geological drilling equipment | SECTION 71 - CANCELLED | — |
| 042 | Quality control for others, namely, quality control of geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms and their installations, equipment, devices, engines, machines and their installations; technical writing for others, namely, technical writing in the nature of writing guidelines and manuals regarding maintenance, safety and the environment in relation to geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms, and their installations, equipment, devices, engines, machines and their installations; technical writing for others, namely, technical writing in the nature of writing and updating checklists, safety standards, communication guidelines for geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations, production platforms and their installations, equipment, devices, engines, machines and their installations; technical planning of maintenance activities on geological drilling equipment, drilling rigs, drilling ships, mobile drilling installations and production platforms, and their installations, equipment, devices, engines, machines and their installations; technical inspection of geological drilling equipment | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 9, 2018 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Feb 9, 2018 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 24, 2017 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| May 16, 2016 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| May 16, 2016 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Apr 21, 2016 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 21, 2015 | C71T | CANCELLED SECTION 71 | — |
| May 31, 2013 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 7, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 28, 2011 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 4, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 4, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 20, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 20, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 4, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 15, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Oct 1, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 1, 2008 | ALIE | ASSIGNED TO LIE | — |
| Sep 22, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 22, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 22, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 22, 2008 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 11, 2008 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 11, 2008 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 11, 2008 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 21, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 14, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 14, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 14, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 11, 2008 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 11, 2008 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 8, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 17, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 17, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 17, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 16, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 4, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 4, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Jan 3, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |