Drawing for COLEXON

USPTO serial 79048139

COLEXON

Reviewed by CopyMark Law Group

Reg. 3595025Status 404
Filing date
Status date
Registration date
Mar 24, 2009
Examiner
WATSON, JULIE A
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with COLEXON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, converting, storing, regulating and controlling electricity, namely, electric conductors, electric switches, electric transformers, electric transformer batteries, voltage regulators for electric power, power distribution panels, electronic controllers for use in power converters, power amplifiers, power controllers, power switches, power transformers; photovoltaic installations and encompassing systems for converting electronic radiation to electrical energy; components and spare parts for photovoltaic installations and systems, namely, solar cells, solar collector, solar modules, solar panels for generating electricity, inverters, mounting systems for PV-systems, wiring, as well as for solar cells, solar collectors, solar modules, solar panels for generating electricity, arrangements of solar batteries, data processors and computersSECTION 71 - CANCELLED—
037Construction, namely, information on construction and installation matters, supervision of construction and installation work, assembly, erection and installation of photovoltaic installations and solar-thermal installations, maintenance and repair of photovoltaic installations and solar-thermal installations, installation and repair of electrical appliances, interference suppression in electrical installations, information on repairsSECTION 71 - CANCELLED—
042Scientific and technological services and research work, corresponding to designer services in the field of the design of photovoltaic and solar thermal technology; industrial analysis and research services in the fields of photovoltaic and solar thermal energy; scientific and industrial research about solar energy; computer programing, especially for the control, regulation and/or monitoring of solar-thermal and/or photovoltaic installations; research in the field of photovoltaics and solar collectors, especially technical planning and technical development of components, appliances and systems for photovoltaics; technical development of components, appliances and systems for solar collectors; technical development and planning of the above mentioned products; technical data analysis for the purpose of performance optimisation concerning photovoltaic installations and systems as well as solar-thermal installations, evaluation and elaboration of concepts for the purpose of performance optimisation concerning photovoltaic installations and systems as well as solar-thermal installations; interior decorating and architectural design servicesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 8, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jun 8, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Aug 24, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 21, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 12, 2016INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 12, 2016INPCINVALIDATION PROCESSED—
Jun 30, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 30, 2015C71TCANCELLED SECTION 71—
May 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 12, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 8, 2010NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 9, 2009CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jul 8, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 8, 2009FIMPFINAL DISPOSITION PROCESSED—
Jun 24, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 24, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 6, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 17, 2008NPUBNOTICE OF PUBLICATION—
Dec 1, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 1, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Dec 1, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 1, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 21, 2008MAILPAPER RECEIVED—
Nov 18, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 18, 2008FAXXFAX RECEIVED—
Nov 17, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 17, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 17, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 13, 2008MAILPAPER RECEIVED—
Nov 7, 2008NAUDNOTICE OF UNRESPONSIVE AMENDMENT - MAILED—
Nov 6, 2008NAUDREPORT UNRESPONSIVE AMENDMENT - COMPLETED—
Nov 6, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 6, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 4, 2008FAXXFAX RECEIVED—
Sep 29, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 26, 2008ALIEASSIGNED TO LIE—
Sep 16, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 26, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 25, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 25, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 14, 2008RFNPREFUSAL PROCESSED BY IB—
Feb 26, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 26, 2008RFRRREFUSAL PROCESSED BY MPU—
Feb 26, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 25, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 22, 2008DOCKASSIGNED TO EXAMINER—
Feb 1, 2008NWAPNEW APPLICATION ENTERED—
Jan 31, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance