Drawing for STIEBEL ELTRON

USPTO serial 79049194

STIEBEL ELTRON

Reviewed by CopyMark Law Group

Reg. 3537354Status 404
Filing date
Status date
Registration date
Nov 25, 2008
Examiner
JUN, WON KYUNG WENDY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with STIEBEL ELTRON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Metal hardware, namely, frames, rails, angles, clamps, flanges, screws for installation, assembly and fixing solar collectors, photovoltaic modules and systems; Metal taps for water pipes; Metal pipes for ventilation and air conditioning systems; Tubes made of metalSECTION 71 - CANCELLED—
007Machines for mining, namely, mining drill sharpeners; Parts of machines, namely, mine borers, drill chucks, drilling heads for rock drilling, drilling bits, drilling rigs; Electro-mechanical machines, namely, aerated beverage preparation machines; Valves being parts of machinesSECTION 71 - CANCELLED—
009Solar cells for current generation; Photovoltaic modules, namely, control and regulation equipment as safety units; Current converters and inverters for photovoltaic systems or fuel cells; Glass covered electric conductors; Control and regulation equipment, namely, apparatus and instruments for regulating or controlling electric current; Remote controls for tankless water heaters, electrical water boilers, hot water tanks, water heaters, electrical hot air hand dryers, electrical towel warmers, electrical storage heaters, electric central heating radiators, air conditioning units, air humidifiers and dehumidifiers, heat pumps, burners and thermal solar collectors; Electronic display units, namely, LCD display panels; AnodesSECTION 71 - CANCELLED—
011Thermal and electrical fittings for heating installations, not including measuring devices; Plumbing fittings for water pipes made of metal, metal alloys or plastic, namely, drains; Taps; Pipeline systems for water, namely, tubes, taps, flanges and tappings; Thermostatic-valves as parts of heating installations; Pipe coils as parts of distillation, heating or cooling installations; Tankless water heaters; Plumbing fittings, namely, flanges for use in heating systems; Electrical water boilers; Hot water tanks; Pressure water tanks; Water heaters; Electrical hot air hand dryers; Electric towel warmers; Electrical heating apparatus and installations, namely, heaters for water and air for domestic use; Electrical storage heaters for central or decentralized installation; Defrosting apparatus for heat pumps; Electric central heating radiators; Electric stoves; Heating apparatus for solid, liquid or gaseous fuels, namely, ovens heated with wood, coal oil and gas; Household electrical heaters, namely, electric radiant heater, convector heaters, thermal storage heaters and fan heaters; Air conditioning units; Air humidifiers- and dehumidifiers; Air filters for air conditioning units; Air conditioning and ventilation apparatus and instruments; Heat pumps; Heat exchangers; Brine distributors as parts of heat pump stems; Solar-powered cooling units, namely, adsorption and absorption heat pumps; Thermal solar collectors; Heating flues and pipes for heating boilers; Brackets for gas burners, sold as parts of gas burners; Electric heating boilers; Gas burners; Heating and power station operated by fuel cells; Block-unit thermal power stations with combustion engine; Water filters and filtration apparatus for drinking water for domestic or commercial systems: Cooling units and systems for drinking water; Water treatment equipment, namely, cartridge filtration units and taps;Water softening units for softening water and for the protection against lime scale build-up;Water supply and distribution apparatus and systems in the nature of pipes for sanitary and drinking water installations; Hot and cold water dispensing units for domestic use; Mineral water equipment, namely, home water carbonatorSECTION 71 - CANCELLED—
037Installation, maintenance, cleaning and repair of burners, electric appliances, heating systems, air conditioning systems, ventilation systems, cooling systems for drinking water, machines, stoves, fuel cells, block-type thermal power stations, pumps, water treatment equipment, water dispensing and mineral water equipment, solar systems, photovoltaic systems, heat pumps,current production systems and water heaters, accessories and components of these goods; Providing information on repair services in the electrotechnical heating and cooling sector; Construction management and supervision; Well drilling; Construction services, namely, rock blasting; DisinfectingSECTION 71 - CANCELLED—
042Consultancy services in the field of energy-saving buildings: Geological research and preparation of technical and geological surveys; Technical and geological project planning; Soil analysis of building grounds for others; Environmental testing and inspection services, namely, environmental compatibility investigationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 9, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Mar 9, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 31, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Apr 22, 2016INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 22, 2016INPCINVALIDATION PROCESSED—
Feb 26, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 26, 2015C71TCANCELLED SECTION 71—
Jan 7, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 18, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 18, 2009FIMPFINAL DISPOSITION PROCESSED—
Feb 26, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 25, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 9, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 20, 2008NPUBNOTICE OF PUBLICATION—
Aug 5, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 5, 2008CNEAEXAMINERS AMENDMENT MAILED—
Aug 5, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 5, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Aug 5, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 15, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 15, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 11, 2008MAILPAPER RECEIVED—
Jun 11, 2008CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 11, 2008CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 20, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
May 20, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 14, 2008ALIEASSIGNED TO LIE—
May 13, 2008MAILPAPER RECEIVED—
Mar 28, 2008RFNTREFUSAL PROCESSED BY IB—
Mar 10, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 10, 2008RFRRREFUSAL PROCESSED BY MPU—
Mar 8, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 7, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 29, 2008DOCKASSIGNED TO EXAMINER—
Feb 29, 2008NWAPNEW APPLICATION ENTERED—
Feb 28, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance