USPTO serial 79049460
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Melanie I. Rauch
MELANIE I. RAUCH SETTER ROCHE LLP199 S. BRIGGS ST., SUITE 200P.O. BOX 780ERIE, CO 80516| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; metal building materials, namely, soffits, fascia, cladding, roof and wall panels, sandwich elements in the nature of anti-noise and sound absorbing panels for roofing, for fences, for floors and doors, sandwich elements, namely, soffits, fascia, cladding, roof and wall panels, made primarily of metal with at least one plastic layer and at least one metal layer or made of two or more metal layers especially for suction dredger tubes, sleekers of plows, wearing plates of roll housings, molding, blades in blade washers, chutes, for use in the sand, grit and cement industry, and for wear-resistant layers in crusher plants; heating systems in the nature of ducts and pipes of metal for central heating and cooling installations, metal heating and cooling ducts; transportable buildings of metal; small items of metal hardware, namely, pulleys, nuts and washers; pipes and tubes of metal; metal fire resistant safes and metal safes; common metal building materials, namely, beams, profiles, particularly, cap profiles, air duct profiles, steel light profiles, U-shaped, C-shaped and angle profiles for use in protection cabins manufacturing industry, safety frames, door frames, formwork, floor frames, roof frames and corner pillars, metal profiles for the construction industry, namely, for bridge safety rails, flat roof insulations, anchor rails, glazings, partitioning and ceiling rails, plant manufacturing and lift construction; metal building materials, namely, fastening profiles, illuminating profiles and profiles for use in the electrical and escalator industries; metal reinforcement materials for building, namely, profiles for use in the structural-facings, window manufacturing, handling engineering, interior construction work, insulation, air-conditioning, and ventilation and solar technology industries, in particular, for air-conditioning cabinets, frames for solar panels, electrical cabinets and perforated and non-perforated locking rails; metal building materials, namely, profiles for use in the storage and conveyor technique, steel and mechanical engineering industries, in particular, for use as vertical members, plate supports, diagonals, support angles, runners, cheek sections and guide rails; metal building materials, namely, profiles for use in the agricultural machinery industry, in particular, for use in constructing rollover protection cabins, towing couplings, chain guides, door frames and storage platform frames; metal reinforcement materials for building, namely, profiles for use in the furniture and shop fitting industries, in particular, for use in constructing office furniture and beds, for use in sanitary engineering, switchboard construction, vessel interior construction work; lockings, namely, metal locks, metal locksets, metal security lock cylinders and keys; metal gates; metal door fittings, in particular, metal door frames, metal tubes for doors and portals with and without sealing grooves or runners; metal garage doors; metal industrial doors; metal awnings; metal doors; metal beverage cans; coated shaped and/or hardened components of metal, included in this class, namely, bolts, casings and cable wires; fence posts made of metal; corn silos made of metal; metal mountings for photovoltaics and solar panels | SECTION 71 - CANCELLED | — |
| 012 | Vehicles, namely, automobiles, boats, rail trains; apparatus for locomotion by land, air or water, in particular coated components of metal therefor, namely, parts for vehicle chassis in the nature of automobile chassis, parts for vehicle interiors and exteriors in the nature of wheels, fenders, bumpers, attachments for vehicles in the nature of spoilers, chassis components for vehicles in the nature of frame components in the nature of automobile bodies, automobile bumpers, automobile door frames, trailer frames, bus and truck frames, caravans frames, structural parts of boats in the nature of gondola cabins, doors and lids, wheel suspension components in the nature of suspension struts, suspension springs for motor cars, axle legs, ball heads, axle casings, trailing arms, transverse control arms, triangular control arms, chamber guides, struts, strut bearings, suspension sub-frames, bearing sub-frames; rear and front axle components in the nature of axle bearings for land vehicles, axle boot kits for use with land vehicles, axles for land vehicles, cast and forged axle bodies for solid axles, joints for fastening axles to a car body, included in this class; coated vehicle body parts of metal, namely, vehicle bodies, body panels, automobile body kits comprising external structural parts of automobiles | SECTION 71 - CANCELLED | — |
| 040 | Treatment of materials, in particular, coating of metals, including, with a non-metallic coating or a non-metallic coating containing metallic particles; electroplating; shaping of metals and metal components; metalworking, namely, metal treatment; hardening of metals and metal components; surface treatment of metals; surface coating of metals, metal components and metal component assemblies | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 20, 2018 | UNDN | UNDELIVERABLE MAIL - NO ACTION TAKEN | — |
| Jun 15, 2018 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Jun 15, 2018 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 23, 2018 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 25, 2018 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 25, 2018 | INPC | INVALIDATION PROCESSED | — |
| Jan 12, 2018 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 12, 2017 | C71T | CANCELLED SECTION 71 | — |
| Aug 3, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 17, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 17, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 21, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 21, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 5, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 5, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 20, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 30, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 17, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 17, 2010 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 17, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 17, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 17, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 8, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 8, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 8, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 28, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 28, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 29, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 29, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 29, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 27, 2009 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Aug 7, 2009 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 6, 2009 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| May 4, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 3, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 31, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 31, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 31, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 31, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 2, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 16, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 16, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 16, 2008 | ALIE | ASSIGNED TO LIE | — |
| Aug 13, 2008 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 13, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 13, 2008 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 28, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 11, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 11, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 10, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 9, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 7, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 7, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Mar 6, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |