USPTO serial 79049535
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Detecting, measuring and monitoring apparatus and instruments for pools, swimming pools and gardens; particularly alarms, emergency devices, diagnostic apparatus, dosage dispensers; distribution panels and cabinets (electricity), control panels (electricity), electronic display boards, level indicators, quantity indicators, temperature level indicators, data processing apparatus, electrolysers, electric devices for attracting and killing insects | SECTION 70 - CANCELLED | — |
| 011 | Lighting apparatus and installations for pools, swimming pools and gardens; heating apparatus for pools, swimming pools and gardens; particularly heat accumulators and regenerators, heat exchangers, water heating apparatus, heat pumps, air-conditioning apparatus or installations, cooling installations and machines, drying apparatus and installations; water distribution apparatus and sanitary installations for pools, swimming pools and gardens; particularly in-line valves, showers, shower cubicles, bath apparatus and installations, whirlpool baths, sauna installations; water treatment apparatus and machines for pools, swimming pools and gardens; particularly in-line valves, showers, shower cubicles, bath apparatus and installations, whirlpool baths and sauna installations; water treatment apparatus and machines for pools, swimming pools and gardens; particularly sterilizers, water softening apparatus and installations, disinfection apparatus, filtering apparatus, swimming pool chlorination apparatus; fountains, ornamental water jets | SECTION 70 - CANCELLED | — |
| 019 | Non-metallic construction materials for pools, swimming pools and gardens; particularly non-metallic frameworks for building, concrete shuttering, concrete, artificial stone, protective non-metallic coverings for swimming pools, non-metallic arbours and shelters for swimming pools and gardens | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 30, 2018 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Jun 29, 2018 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 1, 2018 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Mar 19, 2010 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 19, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 19, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 27, 2009 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Aug 7, 2009 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 6, 2009 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 20, 2009 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Feb 19, 2009 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jul 18, 2008 | RFNP | REFUSAL PROCESSED BY IB | — |
| May 27, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 27, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 22, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 21, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 16, 2008 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 15, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2008 | IRRF | IRREGULARITY ON REFUSAL FROM IB | — |
| Apr 3, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 3, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 2, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 1, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 1, 2008 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Mar 30, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 29, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 7, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Mar 6, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |