Drawing for HYBRID BYPASS

USPTO serial 79050076

HYBRID BYPASS

Reviewed by CopyMark Law Group

Reg. 3676572Status 404
Filing date
Status date
Registration date
Sep 1, 2009
Examiner
MORRIS, KRISTINA KLOIBER
Law office
TMO LAW OFFICE 116

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with HYBRID BYPASS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jason S. Nardiello

Jason S. Nardiello Barclay Damon, LLP1270 Avenue of the Americas, Suite 600New York, NY 10020UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007[ Cement ingredient adjustment machines for supplying cement ingredients during cement manufacture in amounts that eliminate the presence of chlorine, sulfur and lead; chemical processing machines and apparatus, namely, disintegrators, dissolving machines, absorbing machines, adsorbing machines, mixing machines, dust collecting machines, sintering machines, calcining machines, extracting machines, reaction vessels for containing materials to be physically or chemically processed being parts of machines, separating machines, filters and purifiers for machines, namely, filters and purifiers for removing contaminants from gases and heavy metals used in cement manufacturing waste recovery industries; waste compacting machines; waste crushing machines; harmful substance removal devices for waste treatment for separating or recovering contaminant particulate and gaseous components from waste and exhaust streams in the cement manufacturing industry in the nature of probes for contaminants being parts of machines, heat exchangers for parts of machines, fans for machine engines, fans for motors or engines, cyclones, cyclone separators, dust separators, air filters for mechanical purposes, drying machines and apparatus for dewatering, industrial machine presses for filtering, centrifuges, tanks for containing materials to be dissolved being parts of machines, electric pumps, centrifugal pumps, pumps as parts of machines, catalyst contact units for contact of exhaust gases being parts of machines, tanks for containing slurries to be physically or chemically processed, conveyor lines, conveyor belts, and belt conveyors; cement manufacturing machines utilizing waste materials ]SECTION 71 - CANCELLED—
011[ Harmful substance removal devices for waste treatment for separating or recovering contaminant particulate and gaseous components in exhaust or waste streams in the cement manufacturing industry in the nature of gas purification machines for removing contaminants from gases used in the cement manufacturing and waste recovery industries, evaporative coolers for gases, gas scrubbers, flue-gas desulfurization scrubbers, spraying and injection units for disbursing solids, liquids and soluble gases for purification and for potassium salt recovery, water filters, air filters for industrial installations, slurry treatment units for stabilizing and sanitizing slurries, mist separators, waste water purification units in the nature of flotation apparatus formed of liquid containing tanks arranged for sequential liquid flow to separate minerals and other contaminants, desalination units, waste water purification units, and water purification tanks; garbage incinerators; industrial boilers; waste water treatment tanks for industrial purposes; drying machines and apparatus, namely, industrial dryers for heating and dehumidifying; steam generating installations for chemical processing; evaporators for chemical processing; distillers for chemical processing; heat exchangers for chemical processing ]SECTION 71 - CANCELLED—
037Construction of a cement manufacturing plant; construction of industrial plants for processing harmful substances and waste gases generated by cement manufacturing plants and industrial furnaces; construction consultancy; maintenance of building equipment [ ; repair or maintenance of waste compacting machines and apparatus; repair or maintenance of waste crushing machines and apparatus; repair or maintenance of chemical plants ]SECTION 71 - CANCELLED—
040Processing of cement, namely, removal of contaminants and harmful species present during the manufacture of cement; recycling of waste; providing material treatment information; sorting and destruction of waste and trashSECTION 71 - CANCELLED—
042Design of cement manufacturing plants; design of plants for recovery of waste gas or harmful ingredients from industrial furnaces; research and development of cement manufacturing technology and cement manufacturing equipment; scientific research in the field of harmful substance removal in cement manufacturing; testing or research on prevention of pollution [ ; providing temporary use of on-line nondownloadable software for operation of cement manufacturing plant and for operation of devices which remove harmful substances from industrial gases; computer software design, computer programming, or maintenance of computer software ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 2, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 1, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 21, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 19, 2017INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jun 7, 2017INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 28, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 2, 2017XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Feb 2, 2017XXCRGENERIC MADRID TRANSACTION CREATED—
Oct 7, 2016C71TCANCELLED SECTION 71—
Oct 3, 2016INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 3, 2016PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Jan 28, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 4, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Jun 25, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 27, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 4, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 4, 2010FIMPFINAL DISPOSITION PROCESSED—
Dec 1, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 1, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 28, 2009OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Aug 13, 2009OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 13, 2009OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 16, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 27, 2009NPUBNOTICE OF PUBLICATION—
May 12, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 11, 2009CNEAEXAMINERS AMENDMENT MAILED—
May 11, 2009ALIEASSIGNED TO LIE—
May 11, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 11, 2009XAECEXAMINER'S AMENDMENT ENTERED—
May 11, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
May 7, 2009CNEAEXAMINERS AMENDMENT MAILED—
May 7, 2009XAECEXAMINER'S AMENDMENT ENTERED—
May 7, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 13, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 13, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 13, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 14, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 11, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 19, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 19, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2008TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 11, 2008RFNTREFUSAL PROCESSED BY IB—
Mar 24, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 24, 2008RFRRREFUSAL PROCESSED BY MPU—
Mar 22, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 21, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 14, 2008DOCKASSIGNED TO EXAMINER—
Mar 14, 2008NWAPNEW APPLICATION ENTERED—
Mar 13, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance