Drawing for RE

USPTO serial 79050224

RE

Reviewed by CopyMark Law Group

Reg. 3598654Status 706Registered
Filing date
Status date
Registration date
Mar 31, 2009
Examiner
RUTLAND, BARBARA A
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with RE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Francesco Braga

Francesco Braga PERANI & PARTNERS S.P.A.Piazza Armando Diaz 7MILANO, 20123ITALY

Goods and services

ClassDescriptionStatusFirst use
007Universal joints and couplings; rotating joints for air and vacuum; dual flow independent rotating joints; self-supporting graphite rotating joints; single-flow and double-flow joints; bearings; metal seal rings; hoses for rolls-stand; mechanical and pneumomechanical chucks for rolls-stand; pneumatic disk brakes; manual caliper brakes; pneumatic caliper brakes; pneumatic brakes and clutches; electromagnetic brakes and clutches; electromagnetic powder clutches and brakes; machine parts, namely, flexible shaft couplings; shaft couplings for machines; air cooled pneumatically controlled brakes and clutches; self-centering and pneumatic expanding shafts, chucks and non-electrical core adaptors for rolls-stand; chucks with non-electrical adapters for rolls-stand; pneumatic adaptors with strips for paper rolls handling; strip and rubber core non-electrical adaptors for rolls-stand; foot and flange safety chucks for rolls-stand; foot and flange safety chucks with axial movement for rolls-stand; clutches and brakes for the web tension control; roller bearings; conveyors; [ conveyor belts; torque converters, not for land vehicles; hydraulic torque converters; ] all the afore-mentioned goods being machines or parts of machinesACTIVE—
009Current regulators for electromagnetic powder brakes, not being parts of machines; electric control panels; microprocessor control panels; electrical load cells; electrical flange mounted load cells; electrical load cells for web tension measurements; electric and electrical connectors; power supply connectors and adapters for use with portable electronic devices; amplifiers for electric load cells; electronic devices for the tension control of paper, plastic and laminates for use in printing presses; vision system, namely, video camera, personal computer, video monitors and electric or electronic sensors; electromechanical and electrohydraulic devices for use as part of automated process control system, namely, linear actuators, hydraulic cylinders, pivot frames and steering rolls; optical character readers; electric or electronic optic sensors; electric or electronic ultrasonic sensors; electric or electronic ultrasonic control sensors; electric or electronic infrared sensors; electric or electronic sensors of transmitted or reflected light; automatic sensor holders; force measurement products, namely, ultrasonic torque regulators; electric converters; electropneumatic converters; tension control devices for use in automated process control in printing press machines and roll paper transformation; digital web tension indicator devices for use in automated process control in printing press machines; digital web tension control devices for use in automated process control in printing presses and rolls paper transformationACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 30, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 5, 2019INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Nov 14, 2019INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 14, 2019NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Mar 14, 201971AGREGISTERED-SEC.71 ACCEPTED—
Mar 7, 2019ES71TEAS SECTION 71 RECEIVED—
Mar 31, 2018REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Mar 22, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 8, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 8, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 14, 2017RNWLINTERNATIONAL REGISTRATION RENEWED—
May 5, 2016INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 10, 2016INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 10, 2016INPCINVALIDATION PROCESSED—
Dec 1, 2015INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 1, 2015NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 1, 201571AGREGISTERED-SEC.71 ACCEPTED—
Mar 31, 2015EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 26, 2015PR71POST REGISTRATION ACTION MAILED - SEC.71—
Mar 26, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 19, 201571AFREGISTERED-SEC.71 FILED—
Mar 19, 2015ES71TEAS SECTION 71 RECEIVED—
Dec 18, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 12, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 29, 2011ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 4, 2010CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Dec 18, 2009CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 13, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 13, 2009FIMPFINAL DISPOSITION PROCESSED—
Jun 30, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 31, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 2, 2009MAILPAPER RECEIVED—
Jan 13, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 24, 2008NPUBNOTICE OF PUBLICATION—
Dec 10, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 2, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 8, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 8, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 8, 2008ALIEASSIGNED TO LIE—
Oct 28, 2008TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 28, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 28, 2008CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Oct 2, 2008CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 23, 2008RFNPREFUSAL PROCESSED BY IB—
May 2, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 2, 2008RFRRREFUSAL PROCESSED BY MPU—
May 1, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 30, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 24, 2008DOCKASSIGNED TO EXAMINER—
Mar 24, 2008NWAPNEW APPLICATION ENTERED—
Mar 21, 2008LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Mar 20, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance