USPTO serial 79050655
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | HANDLING APPARATUS, NAMELY, LOADING AND UNLOADING MACHINES; CONVEYORS; CONVEYOR BELTS; BAND CONVEYORS; INDUSTRIAL HANDLERS BEING MACHINES, NAMELY, TRANSPORT AND HANDLING CARRIAGES; ELEVATORS, SHREDDERS, NAMELY, WASTE CRUSHERS; CUTTERS BEING MACHINES, NAMELY, BRICK AND TILE CUTTERS; CONCRETE MIXERS AND CERAMIC MIXERS; ROLLING MILLS; INDUSTRIAL MACHINE PRESSES; VIBRATORY MIXING MACHINES FOR INDUSTRIAL USE; MECHANICAL DIGGERS, NAMELY, EARTH MOVING DIGGERS AND EXCAVATORS; EARTH EXTRACTORS FOR USE IN MINES; AIR SUCTION MACHINES FOR INDUSTRIAL USE; PACKAGING MACHINES | SECTION 71 - CANCELLED | — |
| 009 | Data processing apparatus, namely, data processors; computers; computer peripherals; computer printers; interfaces for computers; monitors for computers; computer software for conducting and monitoring operations relating to the running of industrial plants; computer programs for conducting and monitoring operations relating to the running of industrial plants; measuring instruments, namely, instruments for measuring raw materials quality parameters, instruments for measuring thermal and moisture parameters of materials and in course of processing these materials, instruments for measuring the weight, the color and tri-dimensional size of finished ceramic and concrete goods; dosage dispensers, namely, dispensers for feeding ceramic, concrete or similar raw materials to process industrial machines; material testing instruments and machines for testing finished ceramic and concrete goods; furnaces for laboratory experiments; electric and electronic control panels; electrical distribution systems, namely, power distribution panels | SECTION 71 - CANCELLED | — |
| 011 | HEATING APPARATUS FOR SOLID, LIQUID OR GAS FUELS, NAMELY, SOLID, LIQUID OR GAS FUEL HEATERS FOR INDUSTRIAL USE; BURNERS, NAMELY, SOLID, LIQUID OR GAS FUEL BURNERS FOR INDUSTRIAL USE; GAS-FIRED BURNERS; FURNACES OTHER THAN LABORATORY FURNACES; CHIMNEY FLUES; METAL FRAMEWORKS FOR FURNACES, NAMELY, METAL FRAMEWORKS BEING PARTS OF FURNACES; SHAPED FITTINGS FOR FURNACES, NAMELY, SHAPED FITTING BEING PARTS OF FURNACES; DAMPERS, NAMELY, CONTROL DEVICES USED IN AIR DUCTS TO REGULATE THE FLOW OF AIR; LOADING APPARATUS FOR FURNACES, NAMELY, LOADERS BEING PARTS OF FURNACES, KILN FURNITURE BEING SUPPORTS USED IN KILNS, DRYERS, NAMELY, INDUSTRIAL DRYERS FOR HEATING AND DEHUMIDIFYING | SECTION 71 - CANCELLED | — |
| 019 | Non-metal building materials, namely, mortar for ceramics, refracture cement, refracture concrete, plaster; raw materials for ceramics, namely, clay and fireclay for industrial use; non-agricultural lime for use in construction; brick maker's earth, namely, brick clay; non-metal refractory construction materials; bricks; tiles of terra cotta for walls, floors or ceilings; concrete building elements, namely, blocks, bricks, posts, slabs, panels ; non-metal building panels for doors, fencing, roofing, walls, floors or ceilings; non-metal wall claddings for building | SECTION 71 - CANCELLED | — |
| 037 | INSTALLATION AND MAINTENANCE OF HEATING INSTALLATIONS AND FACTORIES FOR MANUFACTURING BUILDING ELEMENTS NOT MADE OF METAL; BURNER MAINTENANCE AND REPAIR; INDUSTRIAL MACHINE INSTALLATION, MAINTENANCE AND REPAIR | SECTION 71 - CANCELLED | — |
| 041 | ARRANGING AND CONDUCTING COLLOQUIUMS, CONFERENCES AND CONGRESSES; ORGANIZING AND CONDUCTING TRAINING WORKSHOPS IN THE FIELD OF CONDUCTING AND MONITORING OPERATIONS RELATED TO THE RUNNING OF INDUSTRIAL PLANTS | SECTION 71 - CANCELLED | — |
| 042 | DESIGN OF COMPUTER SYSTEMS; DEVELOPMENT, DESIGN, INSTALLATION, UPDATING AND MAINTENANCE OF COMPUTER SOFTWARE; COMPUTER PROGRAMMING; COMPUTER SOFTWARE CONSULTANCY; DRAWING UP OF BUILDING PLANS; CONSTRUCTION CONSULTING; CONSTRUCTION CONSULTING IN CONNECTION WITH CONSTRUCTING ENERGY EFFICIENT BUILDINGS; RESEARCH IN THE FIELD OF ENVIRONMENTAL PROTECTION; TECHNICAL RESEARCH IN THE FIELD OF CERAMIC AND CONCRETE; CONDUCTING OF TECHNICAL PROJECT FEASIBILITY STUDIES; ENGINEERING SERVICES; PREPARING EXPERT ENGINEERING COMPLIANCE REPORTS THAT ARE PROVIDED BY ENGINEERS; PHYSICS RESEARCH; CHEMICAL ANALYSIS; MATERIAL TESTING; CALIBRATION IN THE NATURE OF MEASURING; INDUSTRIAL DESIGN; GEOLOGICAL SURVEYS; GEOLOGICAL PROSPECTING; RESEARCH AND DEVELOPMENT OF NEW PRODUCTS FOR THIRD PARTIES | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 22, 2018 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Jun 22, 2018 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Apr 7, 2017 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 14, 2017 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jan 14, 2017 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Nov 16, 2016 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 16, 2016 | INPC | INVALIDATION PROCESSED | — |
| Oct 12, 2016 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 12, 2016 | C71T | CANCELLED SECTION 71 | — |
| May 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 15, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 15, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 7, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 7, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 21, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 1, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 16, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 14, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 13, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 12, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 12, 2009 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 8, 2008 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 8, 2008 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 8, 2008 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 22, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 22, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 19, 2008 | ALIE | ASSIGNED TO LIE | — |
| Sep 18, 2008 | ALIE | ASSIGNED TO LIE | — |
| Sep 11, 2008 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 11, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 25, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 8, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 8, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 8, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 7, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 28, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 28, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Mar 27, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |