USPTO serial 79052264
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ralph E. Locher
Ralph E. Locher Lerner Greenberg Stemer LLPP.O. Box 2480Hollywood, FL 33022-2480UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Adhesive materials for surfaces made of grouting cement | SECTION 71 - CANCELLED | — |
| 007 | Machines for processing synthetic materials, namely, synthetic cellular materials into shaped products; machines for manufacturing molded bodies made of synthetic foamed materials; automatic devices for handling plastic objects, namely, for stacking them; machines and machine tools, molds for use in the manufacture of shaped products; machines and apparatus for manufacturing light-weight concrete; machines and apparatus for manufacturing building parts and prefabricated building parts made of light-weight concrete | SECTION 71 - CANCELLED | — |
| 017 | Plastic sheets not used for packaging, moldings, plates and bars of synthetic materials, namely, semi-finished goods; packing, stopping and insulating materials; flexible non-metallic pipes; insulating and heat-proofing inserts; moldings of plastic materials made by drawing or injection molding processes; cellular materials for thermal insulation | SECTION 71 - CANCELLED | — |
| 019 | Natural and artificial stones, cement mixes, non-agricultural lime for use in construction, mortar, plaster and gravel; sandstone or cement pipes; asphalt, pitch and bitumens; non-metallic transportable buildings, stone monuments, non-metallic chimneys; plates of synthetic material for laying and assembling used for floor heating; synthetic building materials made of foamed synthetic material; light-weight concrete; concrete with added synthetic cellular materials in pellet form, concrete with added foamed polystyrene in pellet form, mixtures of mortars, prefabricated building parts of concrete, prefabricated building parts of light-weight concrete; surfaces made of grouting cement, finished mixtures for surfaces made of grouting cement | SECTION 71 - CANCELLED | — |
| 020 | Containers and cases made of synthetic material or of synthetic cellular material for commercial use, packaging containers made of synthetic material or of synthetic cellular material for food products, fruit, vegetables, mushrooms or fish; containers used for storage and for stacking made of synthetic material or of synthetic cellular material; furniture and furniture of wood for hotels, furniture articles made of wood | SECTION 71 - CANCELLED | — |
| 021 | Thermal insulated containers for food or beverages; bottles sold empty; flower pots and tubs for cultivating plants made of synthetic material or of synthetic cellular material for bulb plants | SECTION 71 - CANCELLED | — |
| 035 | Advertising, business assistance in the operation and management of a commercial company, assistance in the management of business or commercial functions of an industrial or commercial company | SECTION 71 - CANCELLED | — |
| 037 | Construction and repair of roads; construction, repair and maintenance of buildings; manufacture of surfaces in the form of casting compounds | SECTION 71 - CANCELLED | — |
| 042 | Technical consultancy in connection with automation, packaging made of synthetic cellular materials, floor heating systems, light-weight concrete, the production of moldings made of synthetic cellular material and interior design of hotels; special consultancy provided to companies in connection with environmental protection issues regarding the manufacture, processing, use and disposal of synthetic materials | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 9, 2018 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Feb 9, 2018 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| May 12, 2017 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 25, 2017 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 25, 2017 | INPC | INVALIDATION PROCESSED | — |
| Jan 20, 2017 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 20, 2016 | C71T | CANCELLED SECTION 71 | — |
| Jul 22, 2015 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jul 17, 2015 | RHRD | RESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED | — |
| May 13, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 12, 2012 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jun 23, 2012 | RHRD | RESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED | — |
| Jun 17, 2011 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 6, 2010 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Apr 6, 2010 | PLGL | ASSIGNED TO PARALEGAL | — |
| Mar 26, 2010 | IRFI | IRREGULARITY ON FINAL DECISION RECEIVED FROM IB | — |
| Feb 17, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 17, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 13, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 23, 2009 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 13, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 8, 2009 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 8, 2009 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 28, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 22, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 8, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 22, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 20, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 9, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 8, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 8, 2009 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jun 4, 2009 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jun 4, 2009 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 4, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 16, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 16, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 16, 2009 | ALIE | ASSIGNED TO LIE | — |
| May 15, 2009 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jan 6, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 6, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Dec 18, 2008 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Dec 18, 2008 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Dec 18, 2008 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 21, 2008 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 21, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 21, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 13, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 23, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 23, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 22, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 21, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| May 9, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| May 8, 2008 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |