Drawing for SOLON

USPTO serial 79053069

SOLON

Reviewed by CopyMark Law Group

Reg. 4024534Status 404
Filing date
Status date
Registration date
Sep 13, 2011
Examiner
SALEM-HOWEY, AISHA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SOLON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paul Fields

PAUL FIELDS Leason Ellis LLPOne Barker Avenue, Fifth FloorWhite Plains, NY 10601-1526UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Electricity pylons of metalSECTION 70 - CANCELLED—
009Data processing equipment and recorded computer programs for use in the production, distribution and checking of solar energy and electricity; solar batteries and solar cells for generating and producing electricity and solar energy; land surveying instruments for the solar energy industry; sensors, namely, current fluctuation and current interruption sensors and frequency fluctuation sensors and alarm installations for use in solar energy production and distribution instruments/apparatus for converting solar electricity, namely, photovoltaic and solar modules; electric circuits for solar cells and solar elements; inverters for photovoltaic applications, software for the data visualisation of photovoltaic and solar installations; software for simulating photovoltaic and solar installations; electronical sensors for measuring solar radiation and parts thereforeSECTION 70 - CANCELLED—
035business administration in the solar energy sectorSECTION 70 - CANCELLED—
037Assembly relating to the installation of and installations of photovoltaic and solar installations and of power stations; maintenance and repair of photovoltaic and solar installationsSECTION 70 - CANCELLED—
039Transport, storage and distribution of solar generated electricity and energy; information relating to the transport, distribution and storage of solar energy productsSECTION 70 - CANCELLED—
040Processing and refining of oil, gas, natural resources and fuels, for generating energy and electricity; production of solar energySECTION 70 - CANCELLED—
042Technical project planning of photovoltaic and solar installations and of power stations; technical consultancy with regard to the use of photovoltaic and solar installations and of power stations, development of solar cells and solar modules and of power stations; development of assembly and rack systems for photovoltaic and solar installations; engineering, namely, technical engineering expertise and consultancy of solar energy projects; research and development regarding new products, geological calculations for the extraction of natural resources for the production of solar energy and solar energy products, technical reports and projects related to product development within the power and solar energy sectors, research and consulting in the field of environmental protection and environmental impact assessment concerning solar power stations and the solar energy sector, development of technical material and industrial installations, in particular in the solar energy sectorSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 6, 2017DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Dec 6, 2017DETHDEATH OF INTERNATIONAL REGISTRATION—
May 26, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 27, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 10, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 10, 2012FIMPFINAL DISPOSITION PROCESSED—
Dec 13, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 28, 2011APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 13, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 25, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 4, 2011MAILPAPER RECEIVED—
Aug 4, 2011TMBNTTAB RELEASE CASE TO TRADEMARKS—
Aug 4, 2011OP.TOPPOSITION TERMINATED NO. 999999—
Aug 4, 2011OP.DOPPOSITION DISMISSED NO. 999999—
May 20, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 20, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 19, 2009RFNTREFUSAL PROCESSED BY IB—
Jun 24, 2009OP.IOPPOSITION INSTITUTED NO. 999999—
Jun 23, 2009OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
Jun 23, 2009OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
May 14, 2009ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Apr 21, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 1, 2009NPUBNOTICE OF PUBLICATION—
Mar 19, 2009CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 18, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 18, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 4, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 4, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 3, 2009MAILPAPER RECEIVED—
Jan 14, 2009CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 13, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 7, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Jan 7, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 7, 2009ALIEASSIGNED TO LIE—
Dec 22, 2008MAILPAPER RECEIVED—
Nov 27, 2008ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 18, 2008RFNPREFUSAL PROCESSED BY IB—
Jun 30, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 30, 2008RFRRREFUSAL PROCESSED BY MPU—
Jun 27, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 26, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2008DOCKASSIGNED TO EXAMINER—
May 30, 2008NWAPNEW APPLICATION ENTERED—
May 29, 2008SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance