Drawing for DILLINGER HÜTTE

USPTO serial 79053768

DILLINGER HÜTTE

Reviewed by CopyMark Law Group

Reg. 3639710Status 404
Filing date
Status date
Registration date
Jun 16, 2009
Examiner
MIDDLETON, BERNICE L
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DILLINGER HÜTTE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Scott D. Woldow

Scott D. Woldow Smith, Gambrell & Russell, LLP1055 Thomas Jefferson St. NW, Suite 400Washington, DC 20007UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006[ BASE METALS AND THEIR ALLOYS; BUILDING MATERIALS MADE OF METAL, NAMELY, ANGLE IRONS, BANDS, BARS, BOARDS, BRACKETS FOR BUILDING, BUILDING FLASHING, BUILDING WALL FRAMINGS, CASINGS, CEILINGS, CHAINS, CHIMNEY POTS, CHIMNEY SHAFTS, CHIMNEYS, CLADDINGS FOR CONSTRUCTION AND BUILDING, COLUMNS, CORNICES, DECKINGS, DOOR, FENCE, FLOOR, ROOF AND WALL PANELS, DRAIN PIPES, DUCTS, FITTINGS, FLOORS, FRAMES FOR BUILDING, FRAMEWORKS FOR BUILDING, GIRDERS, GRATINGS, GUTTERS, HINGES, I-BEAMS, JOISTS, LADDERS, LATHS, LININGS, LINTELS, MASTS, MOLDINGS, PARTITIONS, PILLARS, PIPES, POSTS, RAILINGS FOR FENCES, BALCONIES AND BRIDGES, RAILS, PLUGS, POLES, ROOF AND WALL COVERINGS, ROOF FLASHING, SHEET PILES, SHUTTERING FOR CONCRETE, SHUTTERS, STAIR TREADS, STAIRWAYS, TILES, TRUSSES, TUBES, WAINSCOTING, WASHERS, WINDOWS, WIRE ROPES; TRANSPORTABLE SHELTER STRUCTURES MADE OF METAL; METAL REINFORCEMENT MATERIALS FOR BUILDINGS; JOINTS MADE OF METAL, NAMELY, METAL EXPANSION JOINTS FOR FLOORS, WALLS, PIPING AND DUCTING, PIPE COUPLING JOINTS; CONSTRUCTION HARDWARE MADE OF METAL, NAMELY, BINDING SCREWS, BOLTS, BUCKLES, CLIPS FOR CABLES AND PIPES, COTTER PINS, COUPLINGS FOR CHAINS, CRAMPS, DOWELS, ELBOWS FOR PIPES, FLANGES, HOOKS, JUNCTIONS FOR PIPES, KARABINERS, MANIFOLDS FOR PIPES, NAILS, NUTS, PEGS, PINS, PIPE COLLARS, PIPE MUFFS, PULLEYS, RINGS, RIVETS, SCREWS, SEALING CAPS, SHIMS, SLEEVES, SPRINGS, VALVES, WALL PLUGS; SHEETS MADE OF METAL; ] SLABS MADE OF METAL; [ WORKS OF ART OF COMMON METAL; ] METAL REINFORCEMENTS FOR CONCRETE, NAMELY, [ MESHES, BEAMS, JOISTS, ] PLATES, [ RODS AND BARS; METAL PIPES; ] STEEL, UNWROUGHT OR PARTIALLY WROUGHT; STEEL PLATES; STEEL CASTINGS; [ STEEL BALLS; ] STEEL ALLOYS [ ; STEEL PIPES ]SECTION 70 - CANCELLED—
040METALWORKING, NAMELY, METAL FABRICATION AND FINISHING SERVICES; OXYACETYLENE CUTTING OF METAL PARTS [ ; ANNEALING OF METAL PARTS; STEEL SHOT BLASTING OF METAL PARTS; MILLING OF METAL PARTS; DRILLING OF METAL PARTS; WELDING OF METAL PARTS ]SECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 29, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 29, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 16, 2018REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Mar 2, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 31, 2016INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Dec 30, 2015XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Dec 30, 2015XXCRGENERIC MADRID TRANSACTION CREATED—
Nov 4, 2015INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 4, 2015NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Mar 4, 201571AGREGISTERED-SEC.71 ACCEPTED—
Mar 3, 2015EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Feb 26, 2015PR71POST REGISTRATION ACTION MAILED - SEC.71—
Feb 24, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 23, 201571AFREGISTERED-SEC.71 FILED—
Feb 23, 2015ES71TEAS SECTION 71 RECEIVED—
Apr 10, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 27, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 13, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 24, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 24, 2009FIMPFINAL DISPOSITION PROCESSED—
Sep 16, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 16, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 31, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 11, 2009NPUBNOTICE OF PUBLICATION—
Feb 26, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 26, 2009ALIEASSIGNED TO LIE—
Feb 23, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 29, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 28, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 28, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 28, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 15, 2008RFNTREFUSAL PROCESSED BY IB—
Jul 29, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 29, 2008RFRRREFUSAL PROCESSED BY MPU—
Jul 29, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 28, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 20, 2008DOCKASSIGNED TO EXAMINER—
Jun 20, 2008NWAPNEW APPLICATION ENTERED—
Jun 19, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance