Drawing for MERO

USPTO serial 79054331

MERO

Reviewed by CopyMark Law Group

Reg. 3831972Status 709
Filing date
Status date
Registration date
Aug 10, 2010
Examiner
STEIN, JAMES W
Law office
TMO LAW OFFICE 100 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MERO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Metal construction elements for space frameworks, namely, metal joint elements, metal pipes, metal tubular bars, metal bars, metal profile bars, metal brackets, metal connecting pieces, namely, metal bolts, and metal structural panels, namely, metal wall panels and metal floor panels; metal prefabricated units, namely, prefabricated metal buildings consisting primarily of metal walls, windows, doors, floors, ceilings, facades and linings; buildings and transportable buildings, namely, prefabricated metal buildings built using the aforesaid goods; layout frameworks of metal, namely, three-dimensional frameworks made of flat and curved metal bar elements, metal joint elements, and metal area elementsSECTION 71 - CANCELLED—
019Non-metal construction elements for space frameworks, namely, non-metal pipes of plastics, non-metal reinforcing tubular bars, non-metal reinforcing bars, non-metal profile reinforcing bars, non-metal beams; non-metal wainscoting; building materials, namely, non-metal building boards, namely, wall boards and floor boards; non-metal prefabricated units in the nature of buildings comprised primarily of non-metal walls, windows, doors, floors, ceilings, facades and linings, non-metal joint elements, and non-metal area elements; construction elements, namely, supports consisting of plastic, wood, glass, gypsum, anhydrite or cementSECTION 71 - CANCELLED—
020Furniture; cupboards; cabinets; office furniture; room dividers; chairs; upholstered furniture; furniture with a supporting framework of tubular bars, and connectors; furniture with a supporting framework of profile rods, and connectors; display stands; pre-fabricated exhibition booths and stands, namely, metal display standsSECTION 71 - CANCELLED—
037Building construction services; exhibition booth assembly for others; services in the field of airport construction, namely, the construction of hangars, towers, halls and maintenance frameworks for planes; building of fair stalls and shops; building construction supervision; scaffolding construction; construction of buildings, namely, construction of transportable buildings using pipes, tubular bars, bars, profile rods, stays, mounts, building boards and board-shaped components, wainscoting, and prefabricated components in the form of wall, window, door, floor, ceiling, facade or lining elements; construction of buildings with built-in installations, and connecting and supporting elements; construction of layout frameworks, namely, construction of three-dimensional frameworks; construction of buildings made of flat and curved bar elements, joint elements, area elements, such buildings including components such as roofs, domes, ceilings, building walls, facades, halls; construction of layout frameworks, namely, buildings including airplane hangars, greenhouses, towers, drilling rigs, cooling towers for industrial installations, towers for chemical installations; construction of exhibition and sales stands; construction of layout frameworks, namely, construction of three-dimensional frameworks, namely, construction of pedestrian and vehicular bridges; construction of layout frameworks, namely, construction of advertising structures including advertising towers and billboards; construction of layout frameworks, namely, construction of stage structures including stage scenery structures for theatre, television, film and advertising purposes; construction of layout frameworks, namely, construction of lighting installations, and scaffolding; construction of maintenance frameworks for air, land and water vehicles, and of maintenance frameworks for large stationary and mobile machines; construction of layout frameworks, namely, construction of masts, aerial masts, telescopes, podiums, stands; maintenance of buildings, namely, maintenance of roofs, roof structures, and building frameworksSECTION 71 - CANCELLED—
042Engineering services; architecture services including architectural consultancy services; interior design services; technical consultancy services in the field of engineering; construction drafting; surveying; structural engineering; software developmentSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 2, 2018APETASSIGNED TO PETITION STAFF—
Jun 28, 2018PC.DPETITION TO DIRECTOR DISMISSED—
Jun 24, 2018APETASSIGNED TO PETITION STAFF—
May 7, 2018TPDRTEAS PETITION TO DIRECTOR RECEIVED—
Feb 23, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jan 19, 2018XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jan 19, 2018XXCRGENERIC MADRID TRANSACTION CREATED—
Jan 5, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 21, 2017RNWLINTERNATIONAL REGISTRATION RENEWED—
May 5, 2017C71TCANCELLED SECTION 71—
May 5, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 14, 2016PR71POST REGISTRATION ACTION MAILED - SEC.71—
Sep 12, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 9, 2016ES71TEAS SECTION 71 RECEIVED—
Aug 9, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 11, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 7, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 7, 2010FIMPFINAL DISPOSITION PROCESSED—
Nov 10, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 10, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 25, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 25, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 22, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 22, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 22, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Apr 22, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 22, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 22, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 22, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 22, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 20, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 20, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 20, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 18, 2009OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 3, 2009OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 3, 2009OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 21, 2009GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 21, 2009GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 21, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 27, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 26, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 26, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 26, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 26, 2009CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 16, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 16, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 16, 2009ALIEASSIGNED TO LIE—
Jan 13, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 8, 2008RFNTREFUSAL PROCESSED BY IB—
Jul 21, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 21, 2008RFRRREFUSAL PROCESSED BY MPU—
Jul 18, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 17, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2008DOCKASSIGNED TO EXAMINER—
Jul 7, 2008NWAPNEW APPLICATION ENTERED—
Jul 3, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance