USPTO serial 79055602
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ursula B. Day
Ursula B. Day Law Firm of Ursula B. Day35 West 35th StreetSuite 900New York, NY 10001| Class | Description | Status | First use |
|---|---|---|---|
| 006 | METAL CHAINS, NAMELY, METAL CHAINS FOR LIFTING APPARATUS, [ EXCAVATORS, ] BUCKET ELEVATORS AND CRANE ELEVATORS, METAL CHAINS FOR MARINE USE, [ METAL EXTRACTION CHAINS, ] METAL PLOW CHAINS, [ METAL CHAINS FOR TRACTORS, ] METAL ROLLER CHAINS, [ METAL SPLICE-BAR CHAINS, METAL CHAINS FOR ANIMALS, DECORATIVE CHAINS OF COMMON METAL EXCEPT JEWELRY ARTICLES, METAL LAMP CHAINS. ] METAL STUD-LINK CHAINS, [ METAL BARREL CHAINS, ] METAL SCRAPER CHAINS, METAL CONVEYOR CHAINS, METAL ANCHOR CHAINS, [ METAL ORE-CHUTE CHAINS, METAL LANDING CHAINS. ] METAL SPROCKET CHAINS, METAL LINK CHAINS, METAL SAFETY CHAINS; CHAIN WHEELS; CHAIN TENSIONERS, [ CHAIN SUPPORTS; CONVEYOR ACCESSORIES, NAMELY, ] METAL JOINING SHACKLES FOR LIFTING AND RIGGING [ ; LOADING CASES IN THE NATURE OF METAL PALLETS, CONVEYOR BEARING FRAMEWORKS OF METAL, ROLLER FITTING IN THE NATURE OF RING-SHAPED FITTINGS OF METAL; GUYS FOR CABLES, FOR DUCTS, FOR LIGHTING APPARATUS, NAMELY, METAL CABLE WIRE; METAL CLOSURES FOR SHAFTS AND SWINGING PLATFORMS; LOCKSMITHING AND BLACKSMITHING ARTICLES, NAMELY, METAL LOCKS AND METAL KEYS FOR LOCKS; ARTICLES OF SHEET METAL, NAMELY, SHEET METAL LININGS; METAL FASTENING CLAMPS, NAMELY, METAL CLAMPS FOR TUBES; METAL HARDWARE PULLEYS, LATCHES, PULLS, CLASPS, PULLEYS, SPRINGS, NUTS, WASHERS; METAL WIRE ARTICLES, NAMELY, NON-ELECTRIC CABLES AND WIRES OF COMMON METALS, WIRE MESHES AND WIRE ROPES; METAL CABLE WIRE AND FENCING; METAL SCREWS, METAL NUTS, METAL HOOKS AND EYE BOLTS; METAL JOINING SHACKLES FOR LIFTING AND RIGGING; METAL SEALING RINGS, ANCHORS; STEEL PLATES ] | ACTIVE | — |
| 007 | CHAINS, ESPECIALLY CHAINS FOR LIFTING APPARATUS, [ EXCAVATORS, ] BUCKET ELEVATORS [ AND CRANE ELEVATORS, ] EXTRACTION CHAINS, PLOW CHAINS, ROLLER CHAINS, [ SPLICE-BAR CHAINS, ] STUD-LINK CHAINS, [ DRIVE CHAINS, ] SCRAPER CHAINS, CONVEYOR CHAINS, [ ORE-CHUTE CHAINS, LANDING CHAINS, ] SPROCKET CHAINS, LINK CHAINS, [ DRIVING CHAINS FOR STATIONARY AND MOBILE MACHINES, NAMELY, CHAIN CONVEYORS, CHAINS FOR CHAIN SAWS AND TRANSMISSION CHAINS, OTHER THAN FOR LAND VEHICLES; ] CHAIN WHEELS BEING PARTS OF MACHINES; [ WINCHES, NAMELY, POWER OPERATED CHAIN JACKS; MACHINES AND APPARATUS FOR THE MANUFACTURE OF CHAINS. NAMELY, ELECTRIC WELDING MACHINES FOR CHAINS AND POWER TOOLS, NAMELY, BURRS; ] CONVEYORS, NAMELY, CHAIN CONVEYORS, [ BELT CONVEYORS, CONVEYORS WITH RUBBER BELTS, TRAILING CONVEYORS, BRAKED CONVEYORS, ] CONTINUOUS CONVEYORS, [ METAL APRON CONVEYORS, CURVED CONVEYORS, ] METAL PLATE BAND CONVEYORS, [ RUNNING WHEEL CONVEYORS, SHAKER CONVEYORS, BLOCKING PULLEY CONVEYORS, ] BUCKET ELEVATORS [ AND CONVEYING TUBES ] IN THE NATURE OF CONVEYOR LINES; ENDLESS CHAIN CONVEYORS; [ STRUCTURAL PARTS FOR CONVEYORS; CONVEYOR ACCESSORIES, NAMELY, DRIVE COMPONENTS IN THE NATURE OF GEARS AND ENCLOSED DRIVES FOR INDUSTRIAL MACHINERY; SCRAPERS IN THE NATURE OF EARTH MOVING MACHINES; INSTALLING SCRAPERS IN THE NATURE OF BOX SCRAPERS, RUFFLE PLATES ASSEMBLED TO A CONVEYOR CHAIN BEING PART OF A CONVEYOR; GUIDE RAILS BEING STRUCTURAL PARTS OF CONVEYORS; ] FLIGHT BARS AND SCRAPER BARS BEING STRUCTURAL PARTS OF CONVEYORS [ ; GUIDE TRACK PROFILES FOR CONVEYORS BEING STRUCTURAL PARTS OF CONVEYORS; GUIDE TUBES AND GUIDING CONDUITS BEING STRUCTURAL PARTS OF CONVEYORS; CONVEYOR CHUTES BEING STRUCTURAL PARTS OF CONVEYORS. CONVEYOR COUPLINGS IN THE NATURE OF COUPLINGS FOR MACHINES; CONVEYOR BEARING FRAMEWORK IN THE NATURE OF CONVEYORS; DRIVING MOTORS AND GEARS FOR CONVEYORS AND FOR MINING MACHINES AND EQUIPMENT, NAMELY, MOTORS AND TRANSMISSION GEARS FOR MACHINES AND STRUCTURAL PARTS THEREFOR; STRUCTURAL PARTS OF MACHINES, NAMELY, GUIDE RAILS, GUIDE TRACK PROFILES, GUIDE TUBES AND GUIDE DUCTS FOR MINING MACHINES; UNCOUPLERS BEING PARTS OF CONVEYORS; ENDLESS CHAIN CONVEYORS; FORWARD PULLING CONVEYORS FOR LOADING AREAS, FOR SHAFT STATIONS, SHAFT TOPS, FOR MINE CAR CIRCULATION AND FOR MANEUVERING; POWER LOADERS AND LOADING APPARATUS, ESPECIALLY SCOOP LOADERS AND MOBILE LOADING CONVEYORS, NAMELY, FRONT END LOADERS AND CONVEYORS; MACHINES AND APPARATUS FOR CRUSHING COAL AND OTHER ORES, NAMELY, COAL CRUSHING MACHINES; AXLES, ROLLERS AND WHEELS, ESPECIALLY FOR PLATE BAND CONVEYORS AND FOR METAL APRON CONVEYORS, COUPLINGS, NAMELY, AXLES FOR MACHINES, ROLLER BEARINGS FOR MACHINES; DRIVE COMPONENTS, SCRAPPERS, AND EQUIPMENT FOR CHAINS AND CONVEYORS, NAMELY, CONVEYOR BELTS AND CONVEYOR LINES ] | ACTIVE | — |
| 008 | [ HAND-OPERATED TOOLS FOR MINING COAL AND OTHER UNDERGROUND ORES, NAMELY, SHOVELS, PICKS, AXES, PICKAXES, SLEDGEHAMMERS; HAND-OPERATED HOISTS FOR THE TRANSPORT OF CONTAINERS ] | SECTION 71 - CANCELLED | — |
| 011 | [ LAMP CHAINS BEING STRUCTURAL PARTS OF LAMPS ] | SECTION 71 - CANCELLED | — |
| 012 | [ CHAINS, ESPECIALLY CHAINS FOR TRACTORS, ANTI-SKID CHAINS, CHAINS FOR VEHICLES, SNOW CHAINS, TRACKS, NAMELY, CHAINS FOR MOTOR CARS AND TRANSMISSION CHAINS FOR LAND VEHICLES; MINE CARS AND THEIR PARTS, NAMELY, LORRIES FOR MINES AND STRUCTURAL PARTS THEREFOR; CIRCULATION TRACKS IN THE NATURE OF RAILWAY BOGIES FOR TRANSPORTING MINE CARS; AXLES, ROLLERS AND WHEELS, ESPECIALLY FOR MINE CARS, NAMELY, AXLE BEARINGS FOR LAND VEHICLES AND VEHICLE WHEELS; COUPLINGS, ESPECIALLY COUPLINGS FOR VEHICLES AND MINE CARS, NAMELY, RAILWAY COUPLINGS; DRIVE COMPONENTS, NAMELY, DRIVE SHAFTS FOR LAND VEHICLES ] | SECTION 71 - CANCELLED | — |
| 017 | [ SHAPED PARTS MADE OF SYNTHETIC MATERIAL, NAMELY, EXTRUDED PLASTIC COMPOSITE MATERIAL IN THE FORM OF PROFILES, BOARDS, SHEETS, BLOCKS, RODS, FOR GENERAL INDUSTRIAL USE AND IN MINING ] | SECTION 71 - CANCELLED | — |
| 019 | [ CONVEYOR BEARING FRAMEWORK, NAMELY, FLOOR PANELS NOT OF METAL; CLOSURES FOR SHAFTS AND SWINGING PLATFORMS, NAMELY, NON-METAL GIRDERS; LAMINATED, DRAWN, PRESSED, STAMPED, TURNED AND CAST BUILDINGS PARTS, NAMELY, MULTI LAYER PANELS OF PLASTIC FOR USE IN BUILDING; SHAPED PARTS MADE OF SYNTHETIC MATERIAL, NAMELY, BUILDING PANELS ] | SECTION 71 - CANCELLED | — |
| 020 | [ CONVEYOR COMPONENTS, NAMELY, NON-METAL LOADING CONTAINERS FOR STORAGE OR TRANSPORT; NON-METAL CLAMPS FOR CABLES, FOR DUCTS, FOR LIGHTING APPARATUS; FASTENING CLAMPS, NAMELY, NON-METAL CLAMPS FOR TUBES ] | SECTION 71 - CANCELLED | — |
| 026 | [ HOOKS AND EYELETS ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 24, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Dec 25, 2020 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 17, 2020 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 17, 2020 | INPC | INVALIDATION PROCESSED | — |
| Nov 2, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 2, 2020 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Mar 2, 2020 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Mar 2, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 16, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jan 5, 2019 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| May 26, 2017 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 8, 2016 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 8, 2016 | INPC | INVALIDATION PROCESSED | — |
| Sep 4, 2016 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 1, 2016 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 4, 2016 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jan 4, 2016 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Dec 30, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 19, 2015 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| May 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 30, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 30, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 5, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 21, 2010 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 5, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 4, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 31, 2009 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Oct 20, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 30, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 16, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 15, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 15, 2009 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Sep 14, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 14, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 4, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 4, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 12, 2009 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Aug 12, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 11, 2009 | FAXX | FAX RECEIVED | — |
| Feb 20, 2009 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 20, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 10, 2009 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Feb 10, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 10, 2009 | ALIE | ASSIGNED TO LIE | — |
| Feb 6, 2009 | FAXX | FAX RECEIVED | — |
| Feb 6, 2009 | FAXX | FAX RECEIVED | — |
| Feb 6, 2009 | FAXX | FAX RECEIVED | — |
| Jan 23, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 23, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 4, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 8, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 8, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 7, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 6, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 1, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 1, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Jul 31, 2008 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |