USPTO serial 79056304
BTM
Reviewed by CopyMark Law Group
Status 622
- Filing date
- Status date
- Registration date
- —
- Examiner
- THOMAS, AMY E
- Law office
- TMO LAW OFFICE 110 - EXAMINING ATTORNEY ASSIGNED
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with BTM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, machine tools and equipment for the construction industry, including traffic way construction, airfield construction, asphalt construction, earth-moving, hydraulic engineering, landfill construction and mining, as well as road demolition, road repair, road rehabilitation and road recycling, in particular crushers, road millers, road surface breakers, road finishers, asphalt finishers, pavers, road topping recyclers, ground stabilisers, binding agent and grit spreaders, and compactors for soil, asphalt and waste, including namely rollers, tampers and vibrating plates; machines and equipment for the horizontal or vertical conveying of building materials, including conveyor belts, slides, hoists and lifts; parts for the aforesaid goods | ACTIVE | — |
| 009 | Measuring and controlling devices and computer programs for the vibratory movement of road making machines and of machines for soil, asphalt and waste compaction and compaction of road supporting layers, binder and surfacing layers, in particular of vibratory rollers, tampers, vibrating plates, finishers and compaction machines including temperature measurement | ACTIVE | — |
| 042 | Engineering, technical consultancy, scientific and industrial research in the field of construction industry, including traffic way construction, airfield construction, road rehabilitation, road recycling, road demolition and road repair, asphalt construction, earth-moving, hydraulic engineering, landfill construction and mining as well as waste compaction | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 29, 2010 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 14, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 14, 2010 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 7, 2008 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Oct 23, 2008 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Oct 10, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 17, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 17, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 17, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 16, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 15, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 15, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Aug 14, 2008 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |