Drawing for ELEMATIC

USPTO serial 79056692

ELEMATIC

Reviewed by CopyMark Law Group

Reg. 3669526Status 706Registered
Filing date
Status date
Registration date
Aug 18, 2009
Examiner
YONTEF, DAVID ERIC
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with ELEMATIC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Elizabeth A. Cominolli

Elizabeth A. Cominolli Markert & Cominolli PLLC75 S. Clinton Ave., Suite 510Rochester, NY 14604UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines and specialized equipment for the concrete and precast concrete industry, namely, concrete mixers and concrete construction machine parts, namely, conveyor buckets therefor; concrete casting machines and structural parts therefor, namely, slide-casting extruders; machine parts, namely, molds for use in the manufacture of precast concrete elements and exclusively used with engineered concrete equipment; [ metal and wood sawing machines ] and drilling machines for concrete and precast concrete elements; concrete construction machines; [ asphalt paving machines; ] lifting equipment, namely, power-operated lifting equipment in the nature of [ pipe layers, fork lifts, telehandlers, ] lifts, cranes, skip conveyors and belt conveyors; metal parts and fittings for power-operated lifting equipment; automatic and pneumatic machines for attaching loops and hooks to form parts of lifting connections; specialized equipment for servicing beds, machines and machine part molds in a precast concrete factory, namely, power-operated cleaning machines using brushes and power-operated oiling machines having oil tanks and lines to transfer oil to nozzles; power-operated and automatic machines for making recesses and openings in the concrete elements; heat exchangers, pumps, boilers and pipes, all being parts of machines used for heat-treatment of concrete elements; industrial electromechanical marking machines for marking concrete elements; hydraulic pretensioning machines for pre-stressing concrete elements; concrete vibrators and vibrating grinding machines; power-operated machines for tilting concrete elements; power-operated and automatic machines for attaching metal plates to concrete elements; grinding, floating cranes and power-operated polishing machines for surface treatment of concrete elements; roller conveyors for rolling a plastic cover over concrete elements; industrial robots for positioning mold walls; structural parts and fittings for all the aforesaid goodsACTIVE—
009Computer software * relating to the manufacturing of concrete, precast concrete and concrete elements * for planning and controlling production in a concrete factory and transportation, inventory, warehousing, material-handling and packaging logisticsACTIVE—
019Concrete; precast concrete slabs; [ reinforced and pre-stressed building construction elements, namely, concrete, concrete pillars and concrete beams; ] pre-stressed construction elements not made of metal, namely, [ concrete blocks, concrete beams, concrete columns, concrete panels and ] concrete floors; profiled and formed concrete elements, namely, [ balcony enclosures, stairs, terrace enclosures, vineyard posts, concrete blocks, concrete beams, concrete columns, concrete panels and ] concrete floors; [ wall elements, namely, concrete walls, insulated concrete walls, drywall and wall boards; plastic conduit for drainage when laying concrete; concrete blocks and ] concrete slabs for use as construction elements [ ; paving blocks; box elements for construction, namely, letter boxes of masonry and secondary moisture drainage system consisting of non-metal troughs and collection boxes; noise barriers made of concrete; concrete railroad ties ]ACTIVE—
037Construction of industrial manufacturing plants [, residential buildings and office buildings ] and construction supervision related thereto; servicing, installation and repair of specialized machines and equipment for the construction industryACTIVE—
042Technical consultation in the field of building construction; scientific research; industrial research and design in the field of building construction; design and development of computer software used in the precast concrete industry; * all the aforementioned services concerning the manufacturing of concrete, precast concrete and concrete elements *ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 13, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 2, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 2, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 2, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 2, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 7, 2020INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Sep 26, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Sep 26, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Aug 23, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 23, 2019NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Dec 23, 201971AGREGISTERED-SEC.71 ACCEPTED—
Sep 6, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 19, 2019ES71TEAS SECTION 71 RECEIVED—
Aug 18, 2018REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jul 5, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
May 20, 2017INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 16, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 21, 2017XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jan 21, 2017XXCRGENERIC MADRID TRANSACTION CREATED—
Dec 1, 2016INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 31, 2016NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Mar 31, 201671AGREGISTERED-SEC.71 ACCEPTED—
Mar 31, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 4, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 17, 2016ES71TEAS SECTION 71 RECEIVED—
Dec 18, 2015PRA7REGISTERED - SEC. 7 REQUEST ABANDONED—
Oct 8, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 9, 2014PRAMPOST REGISTRATION ACTION MAILED - SEC. 7—
Jan 31, 2014PLGLASSIGNED TO PARALEGAL—
Jan 28, 2014APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 15, 2014AMD7SEC 7 REQUEST FILED—
Jan 15, 2014ES7RTEAS SECTION 7 REQUEST RECEIVED—
Jan 28, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 19, 2010CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jul 22, 2010CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 29, 2010COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Apr 29, 2010PLGLASSIGNED TO PARALEGAL—
Mar 18, 2010LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Mar 18, 2010LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Dec 31, 2009NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 2, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 2, 2009FIMPFINAL DISPOSITION PROCESSED—
Nov 18, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 18, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 2, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 13, 2009NPUBNOTICE OF PUBLICATION—
Apr 28, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 24, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 24, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Apr 24, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 24, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 24, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 17, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 17, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 18, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 18, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 18, 2009ALIEASSIGNED TO LIE—
Mar 17, 2009MAILPAPER RECEIVED—
Mar 15, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 10, 2008RFNTREFUSAL PROCESSED BY IB—
Sep 16, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 16, 2008RFRRREFUSAL PROCESSED BY MPU—
Sep 16, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 15, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 12, 2008DOCKASSIGNED TO EXAMINER—
Aug 29, 2008NWAPNEW APPLICATION ENTERED—
Aug 28, 2008LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Aug 28, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance