Drawing for HAMWORTHY

USPTO serial 79056696

HAMWORTHY

Reviewed by CopyMark Law Group

Reg. 4127307Status 709
Filing date
Status date
Registration date
Apr 17, 2012
Examiner
HABEEB, MYRIAH A
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with HAMWORTHY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stephen P. McNamara

Stephen P. McNamara St. Onge Steward Johnston & Reens LLC986 Bedford StreetStamford, CT 06905-5619UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Electrical power generators for burners and flares; hydraulic pumps for burners or flares; hydraulic, linear, pneumatic actuators and valves for igniters; control regulators being parts of machines for heating or steam generating or steam handling installations or hot gas generating and hot gas handling installations or oxidisers or incinerators; control regulators being parts of machines for use in igniters, burners and flares; electric, hydraulic and pneumatic pumps for heating and heating installations; ignition wires and spark plugs for gas turbine ignition systems; machines for generating steam or hot gas, namely, steam operated power generators; fuel pumps for burners and flares; fuel skids for gaseous or liquid fuels, namely, transport or lifting work platforms for gaseous or liquid fuels; control regulators being parts of machines; burner and flare fuel filters being parts of machines for generating steam; fans, igniting devices and fuel injectors being parts of machines for generating steam; gas pokers, namely, pokers for use in igniting gas-powered machines; oil lances, namely, tubes for supplying oil for flame formation being structural parts of machines; devices which are fitted to burners or flares or installed upstream or downstream thereof whose primary function is to reduce emissions being structural parts of machines, namely, flue gas recirculation systems, namely, systems which mix part of the flue gas emitted from the burners or flares with clean air and supply the newly mixed flue gas/air combination back to the burners or flares and comprised primarily of fans, ducting and mixing devices, and also including control systems for controlling this recirculation and consisting of gas analyzers, control valves, dampers, pressure transmitters, flow transmitters and temperature transmitters therefor; staged combustion systems being systems that introduce air and fuel in stages to burners and flames and comprised primarily of fans, ducting and mixing devices, and also including control systems for controlling this staged introduction and consisting of gas analyzers, control valves, dampers, pressure transmitters, flow transmitters and temperature transmitters therefor; combustion air feeding apparatus for boilers or furnaces, namely, over fire air ports, namely, one or more air ports in a boiler or furnace which introduce secondary air above the burner flame to complete combustion and to produce turbulence, thereby increasing the efficiency of the combustion process; catalytic convertors; ammonia or urea injection systems being chemical injectors comprised primarily of chemical injectors, and also containing reagent storage tanks, mixers, dosing pumps, dosing meters, flow controllers, gas analyzers, PH analyzers, control valves, injection nozzles and flow meters therefor; Steam injection systems comprised primarily of steam injection machines and also containing flow meters, steam injection nozzles, diffusers, mixers, flow control valves and pressure transmitters therefor; water injection systems, comprised primarily of water injection machines and also containing storage tanks, pumps, flow controllers, gas analyzers, control valves, injection nozzles and flow meters therefor; pumps, pipes, valves and instrumentation for incinerators, oxidisers, burners and flares; all the aforesaid goods being for use in burners or flares, or in machinery which is ancillary to burners and flares or is installed with burners or flares or upstream or downstream thereofSECTION 71 - CANCELLED—
009Electrical and electronic combustion control systems for industrial burners and flares; electrical and electronic ignition control systems for industrial burners and flares; computer software for controlling and monitoring the operation of industrial burners and flares; alarms and warning apparatus to alert malfunction of industrial burners and flares, namely, audible and visible notification appliances, namely, bar graph indicators, namely, electronic indicator boards featuring bar graphs, warning lamps, touch screen displays, annunciators, alarm bells, hooters and sirens; programmable logic control units, namely, programmable logic controllers; human to machine interfaces, namely, computer touch screens, buttons and keyboards; electrical and electronic sensors for sensing temperature or pressure; electrical and electronic monitoring and control apparatus, namely, switches for controlling the flow of gases or liquids; pressure and temperature gauges; valves operated automatically by electric and electronic control for regulating the flow of gases and liquids; valves and electric switches operated automatically by changes in pressure or physical conditions or by temperature for regulating the flow of gases and liquids; solenoid valves being electromagnetic switches; junction boxes; sequential selectors and panels, namely, electric control panels for regulating the flow of gases and liquids; electric plugs; electrical relays; electrical transducers; electronic and radio signal transmitters and gas detector probes being part of control systems for industrial burners and flares; apparatus for safety monitoring, namely, safety valves for flow shutoff for industrial burners and flares; control valves for controlling and disposing of vent gas; test and measuring apparatus, namely, electronic test and measurement devices, namely, flow meters, differential pressure transmitters, gas sampling systems comprised primarily of controlled volume pumps, and also including heated sample tubes, sample flow measurement devices and residual gas analyzers therefor; sample weighing systems, namely, filters and weighing scales, residual gas analyzers, spectrometers chromatographs, microphones, noise meters and gas testing instruments for use in burning boil-off waste hydrocarbon gas from storage tanks or reliquification plants therefor; gas and fluid metering apparatus, namely, electronic metering faucets, electrical energy utilization metering devices complete with related software and orifice plates being structural parts sold therewith for metering or controlling the flow rate of fluidsSECTION 71 - CANCELLED—
011Air valves for steam heating installations, namely, steam valves; spark igniters for gas boilers, burners, incinerators and flares; water heaters; water heaters for industrial use; direct and indirect fired air-heaters being heating installations; fuel waste oil heaters; gas and liquid incinerators; gas scrubbers; electric vaporisers; combustion control systems comprised of combustion chambers; burner management systems comprised of gas burners; valves for controlling incinerators, for use in regulation of fluid flow within a boiler, burner or incinerator; process air heaters being heating installations; boiler fittings, namely, pipes for heating boilers; gas and oil pilots, namely, spark igniters for gas appliances; flare ignition systems comprised of a gas supply tube with a nozzle and an electrical ignitor to create a flame at the nozzle for industrial applications, namely, for igniting waste gases being discharged from industrial stacks and for igniting gas-fired boilers and flares; flare gas seals being structural parts of gas burners and flares; spark igniters for gas firing furnaces; valves for regulating and delivering oil or gas to boilers, incinerators, burners and flares; furnaces; incinerators; cooling fans systems and cooling domes for cooling incinerators; electric fans, pipes to cool heat producing components and valves, all being part of incinerators, burners and flares; waste heat recuperators, namely, heat exchangers not being parts of machines; combustion air heaters being heating installations; thermal oxidizing apparatus, namely, regenerative thermal oxidizer used to destroy airborne volatile organic compounds, airborne toxins, odors and other air pollutants from industrial operations; all the aforesaid goods being for use in burners or flares, or in machinery which is ancillary to burners or flares or is installed with burners or flares or upstream or downstream thereof; apparatus for steam boilers, namely, pipes for heating boilers; hot water heating boilers but excluding boilers ranging in size up to 1172kW for hydronic heating of large buildings and all parts or gas burners for such boilers below 58kW and excluding self contained storage water heaters and calorifiers for generating potable water for large buildings and all parts and fittings for the aforesaid goods; spark igniters for firing gas furnaces; gas burners; burner installations, namely, gas burners being heating apparatus, oil burners for industrial use, gas burners, low calorific value gas burners excluding gas burners below 58kW use for boilers of up to 1172kW for hydronic heating of large buildings, duct burners being heating installations; burners for hydrocarbon processing applications being heating installations, burners fuelled by gaseous liquid or solid fuel or by any combination thereof and flares and flare stacks of all descriptions being heating installationsSECTION 71 - CANCELLED—
037Installation, maintenance and repair services for boilers, incinerators, burners and flare systems, all being combustion equipmentSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 3, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 4, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 20, 2019XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Aug 20, 2019XXCRGENERIC MADRID TRANSACTION CREATED—
Jul 23, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 23, 2018C71TCANCELLED SECTION 71—
Jun 14, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Apr 21, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 17, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 6, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 20, 2013ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2013REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 7, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 17, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 17, 2012FIMPFINAL DISPOSITION PROCESSED—
Jul 17, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 17, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 31, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 31, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 27, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 11, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 11, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 11, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 29, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 21, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 16, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Dec 16, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 16, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 16, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 28, 2011GNS1NOTIFICATION OF SUBSEQUENT FINAL EMAILED—
Nov 28, 2011GNCFCONTINUATION OF FINAL REFUSAL E-MAILED—
Nov 28, 2011CNCFACTION CONTINUING A FINAL - COMPLETED—
Nov 14, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 14, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 1, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 1, 2011EXPIEX PARTE APPEAL-INSTITUTED—
Nov 1, 2011JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Nov 1, 2011EXAFEXPARTE APPEAL RECEIVED AT TTAB—
May 6, 2011GNS1NOTIFICATION OF SUBSEQUENT FINAL EMAILED—
May 6, 2011GNSFSUBSEQUENT FINAL EMAILED—
May 6, 2011CFRCSUBSEQUENT FINAL REFUSAL WRITTEN—
Apr 11, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 11, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 11, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 13, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 13, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 13, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 27, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 27, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Apr 23, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 23, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 23, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 1, 2010RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Apr 1, 2010ALIEASSIGNED TO LIE—
Feb 12, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 28, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 28, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 1, 2009RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Apr 30, 2009RFNTREFUSAL PROCESSED BY IB—
Mar 31, 2009GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Mar 31, 2009GNSLLETTER OF SUSPENSION E-MAILED—
Mar 31, 2009CNSLSUSPENSION LETTER WRITTEN—
Mar 5, 2009CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 5, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 5, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 4, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 4, 2009ALIEASSIGNED TO LIE—
Mar 4, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 20, 2008RFNTREFUSAL PROCESSED BY IB—
Sep 4, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 4, 2008RFRRREFUSAL PROCESSED BY MPU—
Sep 4, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 3, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 29, 2008DOCKASSIGNED TO EXAMINER—
Aug 29, 2008NWAPNEW APPLICATION ENTERED—
Aug 28, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance