Drawing for IBC SOLAR

USPTO serial 79058710

IBC SOLAR

Reviewed by CopyMark Law Group

Reg. 3673215Status 404
Filing date
Status date
Registration date
Aug 25, 2009
Examiner
MACFARLANE, JAMES W
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with IBC SOLAR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JOHN ALUMIT

John Alumit Patel & Alumit, PC16830 Ventura Blvd., Suite 360Encino, CA 91436UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Mounting frames of metal for fastening solar installations, solar modules and laminates; metal building materials, namely, solar panel mounts made of metal; transportable buildings of metal; pipes and tubes of metalSECTION 71 - CANCELLED—
009Power Inverters, voltage charge regulators for electric power, batteries, electric cables; electric and electronic measuring and display systems for solar installations, comprising electronic control devices for heating and energy management, and metering devices with integrated software, all for measuring and displaying wind strength, temperature, performance data, and energy produced; all the aforesaid goods relating to solar energy technology; photovoltaic installations, namely, photovoltaic solar modules made from silicon and other semiconductors, photovoltaic cladding panels, photovoltaic solar hybrid modules, photovoltaic thermal modules, and photovoltaic cells, and structural parts thereforSECTION 71 - CANCELLED—
011Solar installations for generating thermal energy from the rays of the sun, namely, solar thermal modules, solar thermal air systems for heating purposes, and solar thermal-based power plants, and structural parts therefor; thermal solar collectors; all the aforesaid goods relating to solar energy technology; solar furnaces, heat pumps, heat regenerators in the nature of regenerative heat exchangers, heat accumulators, and heat exchangersSECTION 71 - CANCELLED—
019Mooring bollards, not of metal; reinforcing materials not of metal for building purposes; asphalt; girders, not of metal; huts, namely, non-metal storage sheds; construction timber; worked timber, namely, partially processed timber; non-metallic building materials, namely, non-metal structures for mounting solar panels; pre-fabricated non-metallic buildings; concrete; concrete building elements, namely, blocks, bricks, posts, slabs, panels; bituminous products for building, namely, roof coatings; non-metal roof coverings; non-metal facade panels for construction purposes; asphalted roofing cardboard; tiles, not of metal; non-metal carpentry scantlings for building; roofing, not of metal, with integrated solar cells; drain pipes, not of metal; refractory construction materials, not of metal; non-metallic scaffolding; gravel; artificial stone; posts, not of metal; non-metallic rigid piping for building; non-metallic fencing stays; utility poles not of metal; water tanks of masonry for industrial purposes; non-metallic window and door frames for buildingsSECTION 71 - CANCELLED—
035Advertising services; providing office functionsSECTION 71 - CANCELLED—
037Building construction services; repair services for construction machines and construction equipment, water vehicles, and plants for process engineering for environmental technology installations; installation services, namely, installing solar and photo voltaic systems; providing information in the field of building construction; building construction supervision; building monitoring, namely, construction management services; building monitoring, namely, building inspection in the course of building construction; structural and civil engineering; construction planning; construction management; building construction consultation; building construction project supervision of projects for regenerative power generationSECTION 71 - CANCELLED—
042Architectural consultancy; architectural design services; engineering surveying; geological expertise, namely, geological surveying; land surveying; product research and development for others; conducting of feasibility studies for technical projects; engineering work; technical measuring and testing in the nature of calibration; construction drafting; research in the field of physics; environmental assessment services, namely, research in the field of environmental protectionSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 16, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Nov 16, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
May 18, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 22, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 20, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 31, 2017INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 31, 2017INPCINVALIDATION PROCESSED—
Dec 1, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 1, 2016C71TCANCELLED SECTION 71—
May 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 27, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 28, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 16, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 16, 2009FIMPFINAL DISPOSITION PROCESSED—
Nov 25, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 25, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 18, 2009TMBNTTAB RELEASE CASE TO TRADEMARKS—
Jul 18, 2009OP.TOPPOSITION TERMINATED NO. 999999—
Jul 17, 2009OP.SOPPOSITION SUSTAINED NO. 999999—
May 22, 2009RFNTREFUSAL PROCESSED BY IB—
Apr 27, 2009OP.IOPPOSITION INSTITUTED NO. 999999—
Apr 24, 2009OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
Apr 24, 2009OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
Apr 23, 2009OPPFOPPOSITION PAPERS RECEIVED AT TTAB—
Mar 31, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 11, 2009NPUBNOTICE OF PUBLICATION—
Feb 24, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 24, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 24, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Feb 24, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 24, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 24, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 3, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 3, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 3, 2009ALIEASSIGNED TO LIE—
Jan 30, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 30, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 14, 2008RFNTREFUSAL PROCESSED BY IB—
Oct 22, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 22, 2008RFRRREFUSAL PROCESSED BY MPU—
Oct 22, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 21, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 10, 2008DOCKASSIGNED TO EXAMINER—
Oct 10, 2008NWAPNEW APPLICATION ENTERED—
Oct 9, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—