Drawing for VOEST

USPTO serial 79059859

VOEST

Reviewed by CopyMark Law Group

Reg. 3787542Status 709
Filing date
Status date
Registration date
May 11, 2010
Examiner
HOFFMAN, DAVID AARON
Law office
—

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VOEST?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stewart J. Bellus

Stewart J. Bellus COLLARD & ROE, P.C.1077 NORTHERN BLVD.ROSLYN, NY 11576UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
004[ Coal, coke, broken coke, blast furnace lump coke, foundry coke, small coke ]SECTION 71 - CANCELLED—
006Unwrought and partly wrought common metals and their alloys for further manufacture; iron ores, pig iron, steel, cast iron; iron slabs, blocks, billets, cast, rolled and forged components for further manufacture; cold-rolled and hot-rolled thin, medium and heavy sheets and plates of steel for further manufacture; cold-rolled and hot-rolled bands of steel for further manufacture; surface treated and refined metal sheets and plates for further manufacture, sheet metal blanks; sheet metal pressings and stampings, forged sheet metal; surface treated, refined and welded sheet bars of steel; precision metal pipes and special-purpose metal pipes for use in the automobile and construction industries, plastic-coated steel pipes, helically wound metal pipes, metal pipe fittings and junctions, steel pipe joints, metal flanges; wire and wire goods, namely, drawn wire, wire rods and prestressing steel, surface treated, refined and galvanized steel wire, metal screws, nuts, nails, cotter pins, ropes, rivets, bolts, rings, chains; metal rails; rail and switch point fixing material of metal; switches and switch point equipment for use in railroad construction, namely, moveable frogs, rails and sleepers as well as switch point bolts and switch point nuts of metal, shaped steel bars for permanent way accessories, sleepers for railway tracks of metal, cold-rolled and hot-rolled pipes of metal, seamless pipes of metal; sectional steel, hot-rolled and cold-rolled profiles of metal for further manufacture in the construction, furniture, manufacturing and automotive industry, rod steel, round bar steel, reinforcing mesh, reinforcing steel, ribbed reinforcing steel, steel sections, cold-rolled and hot-rolled beams and rings of steel; masts and scaffolding of metal; steel pipe culverts; fence posts and railings of metal, trellis posts of metal; safety rails of metal for roads, overhead direction signs of metal; structural parts of metal for buildings, namely, sections for roof purlins, side rails and mezzanine floors, sheet metal constructions of steel; doors of metal and frames for doors of metal, steel frame profiled sections and building elements of light metal and steel, namely, for the construction industry; sound insulating walls and partitions of metal, sheet piling of metal for securing excavation pits and terrain liable to slips; metal façade claddings for construction; prefabricated high-bay and high-bay warehouse buildings made of metalSECTION 71 - CANCELLED—
009[ Temperature measuring lances for steel works; cutting torches and welding torches ]SECTION 71 - CANCELLED—
012Railway rolling stock and parts and fittings therefor; automobiles, parts and fittings therefore, namely, skin panels, bodyside panels, roofs, hoods, tailgates, fendersSECTION 71 - CANCELLED—
017[ Plastic and plastic-coated objects, namely, plastic in the form of foils, plates, rods for further manufacture ]SECTION 71 - CANCELLED—
019[ Sleepers of concrete, namely, railroad ties for railway tracks ]SECTION 71 - CANCELLED—
037[ Building, construction, assembly, installation, maintenance and repair of metallurgical plants and railway tracks; construction, assembly, repair and maintenance of high-bay and high-bay warehouse buildings ]SECTION 71 - CANCELLED—
039[ Transport of goods and freight forwarding ]SECTION 71 - CANCELLED—
040[ Forging, stamping, pressing, cutting and welding of metal parts for vehicle bodies to the order and specification of others; forging, cutting and welding of metal profiles and rails to the order and specification of others; assembly of vehicle bodies and parts for vehicle bodies to the order and specification of others ]SECTION 71 - CANCELLED—
042[ Technological consultancy and planning for metallurgical and automotive industry, namely, engineering; development, programming, servicing and maintenance of computer software; planning and design of computer hardware and computer software; servicing and maintenance of computer software ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 14, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 16, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 16, 2021INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Mar 8, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
May 20, 2017INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 2, 2017XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Feb 2, 2017XXCRGENERIC MADRID TRANSACTION CREATED—
Feb 2, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 2, 2016NA71NOTICE OF ACCEPTANCE OF SEC. 71 - MAILED—
Jun 2, 201671.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Jun 2, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 11, 2016ES71TEAS SECTION 71 RECEIVED—
Nov 12, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 2, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 2, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 11, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 11, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 23, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 23, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 16, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 13, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 12, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jan 12, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 12, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 12, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 6, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 5, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 5, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 6, 2009GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 6, 2009GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 6, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 3, 2009CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
May 28, 2009CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 16, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 15, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 15, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 15, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 26, 2008RFNTREFUSAL PROCESSED BY IB—
Dec 19, 2008UNPRUNRESPONSIVE/DUPLICATE PAPER RECEIVED—
Dec 19, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 19, 2008ALIEASSIGNED TO LIE—
Dec 5, 2008MAILPAPER RECEIVED—
Nov 19, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 19, 2008RFRRREFUSAL PROCESSED BY MPU—
Nov 19, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 18, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 11, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 7, 2008DOCKASSIGNED TO EXAMINER—
Nov 7, 2008NWAPNEW APPLICATION ENTERED—
Nov 6, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance