USPTO serial 79059859
VOEST
Reviewed by CopyMark Law Group
Reg. 3787542Status 709
- Filing date
- Status date
- Registration date
- May 11, 2010
- Examiner
- HOFFMAN, DAVID AARON
- Law office
- —
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with VOEST?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Stewart J. Bellus
Stewart J. Bellus COLLARD & ROE, P.C.1077 NORTHERN BLVD.ROSLYN, NY 11576UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | [ Coal, coke, broken coke, blast furnace lump coke, foundry coke, small coke ] | SECTION 71 - CANCELLED | — |
| 006 | Unwrought and partly wrought common metals and their alloys for further manufacture; iron ores, pig iron, steel, cast iron; iron slabs, blocks, billets, cast, rolled and forged components for further manufacture; cold-rolled and hot-rolled thin, medium and heavy sheets and plates of steel for further manufacture; cold-rolled and hot-rolled bands of steel for further manufacture; surface treated and refined metal sheets and plates for further manufacture, sheet metal blanks; sheet metal pressings and stampings, forged sheet metal; surface treated, refined and welded sheet bars of steel; precision metal pipes and special-purpose metal pipes for use in the automobile and construction industries, plastic-coated steel pipes, helically wound metal pipes, metal pipe fittings and junctions, steel pipe joints, metal flanges; wire and wire goods, namely, drawn wire, wire rods and prestressing steel, surface treated, refined and galvanized steel wire, metal screws, nuts, nails, cotter pins, ropes, rivets, bolts, rings, chains; metal rails; rail and switch point fixing material of metal; switches and switch point equipment for use in railroad construction, namely, moveable frogs, rails and sleepers as well as switch point bolts and switch point nuts of metal, shaped steel bars for permanent way accessories, sleepers for railway tracks of metal, cold-rolled and hot-rolled pipes of metal, seamless pipes of metal; sectional steel, hot-rolled and cold-rolled profiles of metal for further manufacture in the construction, furniture, manufacturing and automotive industry, rod steel, round bar steel, reinforcing mesh, reinforcing steel, ribbed reinforcing steel, steel sections, cold-rolled and hot-rolled beams and rings of steel; masts and scaffolding of metal; steel pipe culverts; fence posts and railings of metal, trellis posts of metal; safety rails of metal for roads, overhead direction signs of metal; structural parts of metal for buildings, namely, sections for roof purlins, side rails and mezzanine floors, sheet metal constructions of steel; doors of metal and frames for doors of metal, steel frame profiled sections and building elements of light metal and steel, namely, for the construction industry; sound insulating walls and partitions of metal, sheet piling of metal for securing excavation pits and terrain liable to slips; metal façade claddings for construction; prefabricated high-bay and high-bay warehouse buildings made of metal | SECTION 71 - CANCELLED | — |
| 009 | [ Temperature measuring lances for steel works; cutting torches and welding torches ] | SECTION 71 - CANCELLED | — |
| 012 | Railway rolling stock and parts and fittings therefor; automobiles, parts and fittings therefore, namely, skin panels, bodyside panels, roofs, hoods, tailgates, fenders | SECTION 71 - CANCELLED | — |
| 017 | [ Plastic and plastic-coated objects, namely, plastic in the form of foils, plates, rods for further manufacture ] | SECTION 71 - CANCELLED | — |
| 019 | [ Sleepers of concrete, namely, railroad ties for railway tracks ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building, construction, assembly, installation, maintenance and repair of metallurgical plants and railway tracks; construction, assembly, repair and maintenance of high-bay and high-bay warehouse buildings ] | SECTION 71 - CANCELLED | — |
| 039 | [ Transport of goods and freight forwarding ] | SECTION 71 - CANCELLED | — |
| 040 | [ Forging, stamping, pressing, cutting and welding of metal parts for vehicle bodies to the order and specification of others; forging, cutting and welding of metal profiles and rails to the order and specification of others; assembly of vehicle bodies and parts for vehicle bodies to the order and specification of others ] | SECTION 71 - CANCELLED | — |
| 042 | [ Technological consultancy and planning for metallurgical and automotive industry, namely, engineering; development, programming, servicing and maintenance of computer software; planning and design of computer hardware and computer software; servicing and maintenance of computer software ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by voestalpine AG
- Other trademarks owned by voestalpine AG
- Other trademarks owned by voestalpine AG
- Other trademarks in Class 004
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 012
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named VOEST
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 14, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 16, 2021 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 16, 2021 | INPC | INVALIDATION PROCESSED | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Mar 8, 2018 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 20, 2017 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 2, 2017 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Feb 2, 2017 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Feb 2, 2017 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 2, 2016 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - MAILED | — |
| Jun 2, 2016 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Jun 2, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 11, 2016 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Nov 12, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 5, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 2, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 2, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 11, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 11, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 23, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 23, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 16, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 13, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 12, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 12, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 12, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 12, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 6, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 5, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 5, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 6, 2009 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 6, 2009 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 6, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 3, 2009 | CREV | CORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED | — |
| May 28, 2009 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 16, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 15, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 15, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 15, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 26, 2008 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 19, 2008 | UNPR | UNRESPONSIVE/DUPLICATE PAPER RECEIVED | — |
| Dec 19, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 19, 2008 | ALIE | ASSIGNED TO LIE | — |
| Dec 5, 2008 | PAPER RECEIVED | — | |
| Nov 19, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 19, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 19, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 18, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 11, 2008 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 7, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 7, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Nov 6, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |