Drawing for FRITZ WERNER

USPTO serial 79059968

FRITZ WERNER

Reviewed by CopyMark Law Group

Reg. 3696101Status 706Registered
Filing date
Status date
Registration date
Oct 13, 2009
Examiner
PARK, JENNY K
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with FRITZ WERNER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark P. Stone

MARK P. STONE Law Office of Mark P. Stone400 COLUMBUS AVENUEVALHALLA, NY 10595UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machine tools, in particular for ammunition manufacturing, and parts and accessories for machine tools, namely, machine frames and drives, tool blocks, tool block inserts, feeding devices, conveyors, pumps, compressors, blowers, component transfer devices, hydraulic systems, lubrication systems, cam shafts, solid steel table plates, presses, press heads, shack absorbers, straightening devices, rolling tables, de-coiling reels, punches, mandrels and drawing dies, cutting tools, clamping tools, clamps, chucks, joints, working tables, and parts and accessories for machine tools sold therewith, namely, cooling systems, operator consoles, control cabinets, sound insulating casings, monitoring systems, control systems, gauges, measuring toolsACTIVE—
037Installation and repair, In particular, repair, installation and refitting of machine tools and industrial installations, in particular for ammunition manufacturing; factory and installation construction, in particular in the field of ammunition manufacturingACTIVE—
041personnel training, in particular for technical front-line employees, in particular in the field of ammunition manufacturing, the maintenance and repair of machine tools and factory installations, the manufacture of special-purpose tools, the quality control and testing of machine tools for ammunition manufacturing and of ammunitionACTIVE—
042Scientific and technological services, namely, engineering and physics, in particular technical project studies, construction drafting, research in the field of technology, mechanical engineering and physics, engineering surveying; creation, installation, updating and maintenance of computer software; all the aforesaid services in particular in the field of ammunition manufacturingACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 19, 2019NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 19, 201971AGREGISTERED-SEC.71 ACCEPTED—
Apr 3, 2019ES71TEAS SECTION 71 RECEIVED—
Oct 11, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Jan 14, 2015NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED—
Jan 14, 2015C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jan 12, 2015715FREGISTERED - SEC. 71 & SEC. 15 FILED—
Jan 12, 2015MAILPAPER RECEIVED—
Mar 28, 2013INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jan 29, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 4, 2011INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 4, 2010COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Aug 4, 2010APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 17, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 17, 2010FIMPFINAL DISPOSITION PROCESSED—
Jan 13, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 3, 2009AMD7SEC 7 REQUEST FILED—
Dec 3, 2009MAILPAPER RECEIVED—
Oct 13, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 28, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 8, 2009NPUBNOTICE OF PUBLICATION—
Jun 25, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 24, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 4, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 4, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 3, 2009FAXXFAX RECEIVED—
May 13, 2009CPRAPRIORITY ACTION MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 12, 2009CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 31, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 31, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 26, 2009ALIEASSIGNED TO LIE—
Mar 25, 2009MAILPAPER RECEIVED—
Feb 5, 2009RFNTREFUSAL PROCESSED BY IB—
Dec 23, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 23, 2008RFRRREFUSAL PROCESSED BY MPU—
Dec 23, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 22, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 15, 2008DOCKASSIGNED TO EXAMINER—
Nov 11, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 7, 2008NWAPNEW APPLICATION ENTERED—
Nov 6, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance