Drawing for WACKER NEUSON

USPTO serial 79060553

WACKER NEUSON

Reviewed by CopyMark Law Group

Reg. 3968646Status 706Registered
Filing date
Status date
Registration date
May 31, 2011
Examiner
CARL III, FRED
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with WACKER NEUSON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy E. Newholm

Timothy E. Newholm Boyle Fredrickson, S.C.840 N. Plankinton Ave.Milwaukee, WI 53203UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Work machines for the building industry and for the building material industry, namely, skid steer loaders, articulated front end wheel loaders, all-wheel-steered front end loaders, telescopic front end wheel loaders, telescopic handlers, articulated four-wheel dumpers, track dumpers, compact excavators, mobile excavators, crawler excavators, and parts therefor, namely, buckets, blades, front shovels, lifting forks, brooms, grippers, attachment compactors, attachment breakers, spreaders, soil augers, planers, adapter plates, work platforms; vibration and oscillation machines for soil, gravel and asphalt compaction, namely, vibratory rammers, vibratory plates, vibratory rollers; machine vibration and oscillation devices for concrete compaction, namely, concrete internal vibrators, external vibrators for shuttering and molds, motorized vibration wet screeds, truss screeds and parts therefor, namely, leveling devices, shaft motors, flexible shafts; work machines for the building industry and for the building material industry, for concrete flatwork, namely, walk behind and sit-on power trowels, and parts therefor, namely, flattening pans; [ motor driven hammers, drilling machines, and hammer drills; ] rammers in the nature of machines; machine pumps for clean water and dirty water for dewatering and for trash water for draining pits and trenches, namely, diaphragm pumps, centrifugal dewatering pumps, centrifugal trash pumps, submersible electric pumps, modular submersible pumps with flexible shafts; [ cutting devices and joint cutting devices in particular cutting devices for asphalt and concrete in the nature of cutting machines; ] machine concrete flat pans, namely, concrete impeller flat pans, power trowels and concrete surface flatteners; electric power generators [ ; apparatus for cutting reinforcing steel, namely, machines for cutting steel that is used for reinforcing; apparatus for bending reinforcing steel, namely, machines for bending steel that is used for reinforcing ]ACTIVE—
009Remote controls, namely, radio controls, infrared remote controls and combinations thereof for remote control of earth moving machines and vibration and oscillation machines for soil, gravel and asphalt compaction; electronic controls for motors; electric switching devices and control units, namely, frequency and voltage converters and components therefor in the nature of electric controllers for use with frequency and voltage convertersACTIVE—
011Lighting installations for construction sites, namely, portable light towers, [ light balloons in the nature of balloon-shaped light bulbs on telescopic tripods; ] heating apparatus for construction sites, namely, electric space heaters, pavement heaters, indirect fired air heaters with oil burners, indirect fired air heaters with propane burners, indirect fired air heaters with natural gas burners, direct fired air heater with oil burners, direct fired air heater with natural gas burners, dehumidifiers for accelerated drying of wet or flooded buildings, surface heaters with enrolled hoses for defrosting of soil and curing of concrete, and replacement parts thereforACTIVE—
037[ Rental of construction machines ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 3, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 6, 2022INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Sep 23, 2022INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 23, 2022INPCINVALIDATION PROCESSED—
Aug 13, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 13, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Dec 13, 202171AGREGISTERED-SEC.71 ACCEPTED—
Nov 4, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 1, 2021ES71TEAS SECTION 71 RECEIVED—
May 31, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jul 5, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 2, 2017INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Mar 31, 2017INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 30, 2017INPCINVALIDATION PROCESSED—
Mar 11, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 11, 2016NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jul 11, 201671.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Jul 7, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 31, 2016ES71TEAS SECTION 71 RECEIVED—
Feb 1, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 1, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 1, 2011FIMPFINAL DISPOSITION PROCESSED—
Aug 31, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 31, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 15, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 15, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 11, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Feb 24, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 24, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 10, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 10, 2011ALIEASSIGNED TO LIE—
Jan 12, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 10, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jan 10, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 10, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 10, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 29, 2010EXPTEXPARTE APPEAL TERMINATED—
Dec 28, 2010EXPREX PARTE APPEAL-REFUSAL REVERSED—
Apr 30, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 29, 2010GNSNNOTIFICATION OF EXAMINERS STATEMENT E-MAILED—
Apr 29, 2010GNESEXAMINERS STATEMENT E-MAILED—
Apr 29, 2010CNESEXAMINERS STATEMENT - COMPLETED—
Apr 15, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 15, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 11, 2010JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Dec 16, 2009GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Dec 16, 2009GECDACTION DENYING REQ FOR RECON E-MAILED—
Dec 16, 2009CNCFACTION CONTINUING FINAL - COMPLETED—
Dec 10, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Dec 10, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 10, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 10, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 30, 2009ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 30, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 30, 2009EXPIEX PARTE APPEAL-INSTITUTED—
Nov 30, 2009JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Nov 30, 2009EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Oct 30, 2009RECDACTION DENYING REQ FOR RECON MAILED—
Oct 30, 2009CNCFACTION CONTINUING FINAL - COMPLETED—
Oct 22, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 21, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 21, 2009ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 18, 2009CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jun 22, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 28, 2009GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
May 28, 2009GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 28, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 7, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 7, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 7, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 7, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 7, 2009RFNTREFUSAL PROCESSED BY IB—
Nov 26, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 26, 2008RFRRREFUSAL PROCESSED BY MPU—
Nov 25, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 24, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 18, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 14, 2008DOCKASSIGNED TO EXAMINER—
Nov 14, 2008NWAPNEW APPLICATION ENTERED—
Nov 13, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—