Drawing for BBRV

USPTO serial 79060629

BBRV

Reviewed by CopyMark Law Group

Reg. 3784901Status 404
Filing date
Status date
Registration date
May 4, 2010
Examiner
MARTIN, LIEF ANDREW
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BBRV?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Post-tensioning elements, namely, metal cable wires, steel strands and steel bars; steel ducts for housing of post-tensioning elements for use in pretensioned and post-tensioned concrete; metal post-tensioning cables for prestressed concrete constructions of all types as listed below, including suspended bridges and roofs; metal wedges; steel ground anchors and stay cable anchors for use in concrete and prestressed concrete; steel couplers; steel protection caps for covering the ends of the cables in post-tensioning anchorages; steel damping devices in the nature of square dampers for stay cables to reduce cable vibration in prestressed and post-tensioned concrete construction; cable clamps of metal, cable junction of metal, metal non-electrical cable sheaths and cable ducts used in building construction; metal construction elements, namely, fabricated metal components for building foundations; metal prestressing construction elements used in post-tensioned buildings or constructions, namely, pipes, railway sleepers, posts, piers, columns, supports, beams, yokes; metal prestressing construction elements, namely, cantilever beams, bridge girders and bridge decks, flat slabs, ground slabs, retaining walls, shores and braces, all for prestressed concrete constructions of all typesSECTION 71 - CANCELLED—
007Machines for manufacturing of post-tensioning elements, namely, metal cable wires, steel strands, steel bars, steel ducts and metal post-tensioning cables; machines for cutting and hydraulic pressing; machines for coiling of prestressing elements; hydraulic stressing jacks of steel; bending machines; boring machines; drilling machines; grinding machinesSECTION 71 - CANCELLED—
019Carbon fiber construction elements, namely, stay cables; plastic ducts for housing post-tensioning cables for use in pretensioned and post-tensioned concrete construction; plastic protection caps for covering the ends of the cables in post-tensioning anchorages used in building construction; plastic cable sheaths for non-electric structural cables used in building construction; nonmetal construction elements for building or construction purposes, namely, concrete liquid holding tanks, roof panels, rigid pipes, railway sleepers, posts, piers, columns, supports, beams, yokes, cantilever beams, bridge girders and bridge decks, flat slabs of concrete, ground slabs of concrete, retaining walls of concrete, shores and braces, all for prestressed constructions of all typesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 15, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Feb 15, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 8, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 15, 2017INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 15, 2017INPCINVALIDATION PROCESSED—
Aug 9, 2017INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 9, 2016C71TCANCELLED SECTION 71—
Nov 3, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 13, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 24, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 13, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 13, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 4, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 4, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 30, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 15, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 15, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 16, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 27, 2010NPUBNOTICE OF PUBLICATION—
Jan 14, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 11, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 6, 2010CNEAEXAMINERS AMENDMENT MAILED—
Jan 6, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jan 6, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 2, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 2, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 1, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 13, 2009CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 13, 2009CNCFCONTINUATION OF FINAL REFUSAL MAILED—
Nov 12, 2009CNCFACTION CONTINUING A FINAL - COMPLETED—
Oct 23, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 23, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 22, 2009ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 26, 2009CNCFCONTINUATION OF FINAL REFUSAL MAILED—
Aug 25, 2009CNCFACTION CONTINUING A FINAL - COMPLETED—
Aug 7, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 7, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 7, 2009ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 2, 2009CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 2, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 14, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 14, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 13, 2009ALIEASSIGNED TO LIE—
May 13, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 6, 2008RFNTREFUSAL PROCESSED BY IB—
Nov 18, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 17, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 17, 2008RFRRREFUSAL PROCESSED BY MPU—
Nov 16, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 15, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 14, 2008DOCKASSIGNED TO EXAMINER—
Nov 14, 2008NWAPNEW APPLICATION ENTERED—
Nov 13, 2008SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance