Drawing for IPSEN

USPTO serial 79060647

IPSEN

Reviewed by CopyMark Law Group

Reg. 3774897Status 706Registered
Filing date
Status date
Registration date
Apr 13, 2010
Examiner
SCHRODY, ALLISON PAIGE
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with IPSEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Victoria Friedman

Victoria Friedman Dennemeyer & Associates, LLC2 North Riverside Plaza, Suite 1500Chicago, IL 60606UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Cleaning installations, namely, water based automatic cleaning installation for pre and post washing processes of heat treated parts and structural parts thereforeACTIVE—
009Measuring, checking, controlling, regulating and monitoring equipment for industrial ovens, in particular for the heat treatment of metal work pieces in industrial ovens, namely, thermocouples, electric controllers, C-potential controllers, computer equipment namely, computer hardware and monitors, including of software to carry out and control heat treatment processes; electric switches and sensors, namely, oxygen probes, gas analyzers, pressure sensors, limit switches for industrial ovens; automation systems for industrial ovens primarily comprised of PLC-controls, electrical controllers, limit switches, photo-electric sensors; data processing apparatus and installations composed thereof, namely, computer hardware, gas analyzers, thermocouples, data processors for monitoring, checking and the remote control of industrial work processes, in particular for industrial oven process technology for the heat treatment of metal work pieces; computer programs for process control engineering for industrial ovens for the heat treatment of metal work piecesACTIVE—
011Industrial ovens for the treatment of metal work pieces; structural parts and units of industrial ovens, in particular inflow and outflow gates, treatment chambers; transport and conveyor devices, namely, chain conveyors, roller conveyors and belt conveyors for metal work pieces, heating installations, gas production and storage installations; vacuum and atmospheric installations for the treatment of metal work pieces, in particular vacuum heat treatment installations featuring high pressure gas quenching, and structural parts therefore; heat treatment installations, namely, vacuum and atmosphere furnaces, oil quenching apparatus, gas quenching apparatus and liquid salt apparatus for the treatment of metal work pieces and structural parts therefore; gas generators and producers, namely, electrical or gas heated endogas generators, furnace integrated gas generating retorts, in particular generators and producers of inert gas and structural parts therefore; gas circulation installations, namely, electric fans and structural parts therefore; burners, in particular oil and gas burners and heating systems primarily comprised of recuperator gas burners, electrical heating elements for industrial ovens; loading and storage installations for metal work pieces, in particular loading and unloading tables and batch storers and conveyors; ovens, namely, sealed quench furnaces with protective gas atmosphere, low temperature tempering furnaces, low temperature nitriding furnaces and gas generators, namely, endogas generators and structural parts thereforeACTIVE—
037Installation, maintenance and repair of industrial ovens and structural parts therefore, and heat treatment installationsACTIVE—
042Technical planning and construction drafting of heat engineering installations, machines and equipment; computer programming for data processing as part of process control engineering for industrial ovens, in particular computer programming services with the aim of recording and processing data on clients, quantities, weights, materials, the geometrical factors of work pieces, heat treatment orientation, planning, full utilization of ovens optimization of throughput, division of batches, batch coding, batch sequencing, batch composition and statistical analysisACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 9, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 9, 202071AGREGISTERED-SEC.71 ACCEPTED—
Jun 9, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 10, 2020ES71TEAS SECTION 71 RECEIVED—
Apr 13, 2019REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Mar 22, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
May 18, 2016NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
May 18, 2016C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
May 18, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 27, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 6, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 30, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 30, 2010FIMPFINAL DISPOSITION PROCESSED—
Jul 13, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 13, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 26, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 26, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 23, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 23, 2009ALIEASSIGNED TO LIE—
Dec 5, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 6, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 6, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 6, 2009ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 14, 2009GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 14, 2009GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 14, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 3, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 3, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 3, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 3, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 26, 2009NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 7, 2009RFNTREFUSAL PROCESSED BY IB—
Dec 3, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 3, 2008RFRRREFUSAL PROCESSED BY MPU—
Dec 3, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 2, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 1, 2008RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Nov 30, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 29, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 25, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 21, 2008DOCKASSIGNED TO EXAMINER—
Nov 21, 2008NWAPNEW APPLICATION ENTERED—
Nov 20, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance