Drawing for R

USPTO serial 79060848

R

Reviewed by CopyMark Law Group

Reg. 3712215Status 404
Filing date
Status date
Registration date
Nov 17, 2009
Examiner
MORENO, PAUL A
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with R?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines for generating and converting energy and installations constructed therefrom, namely, wind power plants, wind turbines, wind powered electricity generators and wind-powered machines for generating electrical and mechanical energy; parts and fittings for the aforesaid wind power plants, namely, rotor blades, rotors, rotor consoles, blade hubs, machine housings, machine foundations, rotation devices, yaw spinner, yaw linkage, rotor adjusters, adjusters for setting the pitch of the blades, brakes and brake equipment, main drive shafts, universal joints,gears, gear boxes, couplings and electric generators, emergency power supplies, back-up power supply units, electric generatorsSECTION 70 - CANCELLED—
009Switch cabinets for recording, processing, storage and transmission of data from wind power plants and wind farms; switch cabinets for controlling actuator systems for wind power plants and wind farms, electrical voltage and current regulators for wind power plants; electric or electronic controllers for wind power plants, electric or electronic monitors, meters and sensors for measuring turbine performance and power generation in wind power plants, data processing equipment and computers; computer interfaces and computer programs for monitoring and regulating wind power plants and wind farms; voltage surge protectors and suppressors for lightning protection; electric or electronic vibration sensors; electric or electronic watt-hour meters; electric converters and transformers for wind power plantsSECTION 70 - CANCELLED—
035Commercial consultancy regarding wind power plants and wind farmsSECTION 70 - CANCELLED—
037Erection, construction, installation, maintenance, overhauling, servicing and repair of wind power plants; construction of buildings for wind power plants; rotor blade mounting; conducting overhaul, maintenance and repair work for interference elimination in wind power plants and wind farmsSECTION 70 - CANCELLED—
038Telecommunications in connection with wind power plants and wind farms, in particular electronic transmission of data of wind power plants and wind farms, in particular for remote monitoringSECTION 70 - CANCELLED—
042Remote maintenance, remote control and remote monitoring of wind power plants and wind farms via the Internet; analysis of data from wind power plants and wind farms; surveillance and monitoring of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; technical support in relation to windpower plant projects, providing technical planning and technical engineering project management in the field of wind power plants; development and testing of wind power plants, wind farms and components therefor; calculation, layout and design of rotor blades; conducting research projects in the field of wind power plants and wind farms; providing technical information and technical consultancy with regard to wind power plants and wind farms; remote monitoring of wind power plants for others; load measuring and condition monitoring for rotor blades; design of molds for manufacturing rotor bladesSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 3, 2014DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Apr 3, 2014DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 29, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 12, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 11, 2010FIMPFINAL DISPOSITION PROCESSED—
Feb 17, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 17, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 1, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 12, 2009NPUBNOTICE OF PUBLICATION—
Jul 29, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 29, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 27, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 27, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 24, 2009MAILPAPER RECEIVED—
Jun 4, 2009CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 3, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 11, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
May 11, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 11, 2009ALIEASSIGNED TO LIE—
May 8, 2009MAILPAPER RECEIVED—
Jan 8, 2009RFNTREFUSAL PROCESSED BY IB—
Dec 2, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 2, 2008RFRRREFUSAL PROCESSED BY MPU—
Dec 2, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 1, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 25, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 21, 2008DOCKASSIGNED TO EXAMINER—
Nov 21, 2008NWAPNEW APPLICATION ENTERED—
Nov 20, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance