USPTO serial 79061129
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kevin W. Guynn
Kevin W. Guynn GREER, BURNS & CRAIN, LTD.200 W. Madison St.Suite 2100CHICAGO, IL 60606| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and their parts for the chemical industry and for the cement, coal, mineral and metal industry, namely, aerators, belt conveyors, belts for conveyors, compressed air pumps, disintegrators, earth moving machines, engines or motors not for land vehicles, grinding machines, heat exchangers as parts of machines, mine borers, mud catchers and collector machines being part of mine borers, milling machines for the treatment of ore, pneumatic transporters, pneumatic tube conveyors, regulators as parts of machines, rolling mills, power operated separating machines, shredder machines for industrial use, sieves a machines for industrial use, sieves as parts of machines for industrial use, sifters as machines for industrial use, sifting installations as machines for industrial use, air condensers in the nature of steam condensers, steamrollers, stone grinding machines, suction machines for industrial purposes, vibratory screen separators for industrial use; comminution machines and their parts, in particular cone crushers and roller crushers for the cement, coal, mineral and metal industry; mills in the nature of roller mills, hammer mills, ball mills, roller plate mills and vertical mills for the cement, coal, mineral and metal industry and their parts; presses, in particular roller presses and briquetting machines; machine parts, namely, mill stones and annular casings with and without hard bodies for milling or pressing rollers; separating machines and their parts for separating fine bulk goods, in particular wind, cascade and rod basket sifters; sorting machines and their parts, in particular wet sorting machines, jigging machines, flotation machines and magnetic graders | ACTIVE | — |
| 009 | Electric systems and their parts for remote control of industrial procedures, instrumentation and control devices including control systems for machines in the nature of frequency converters and computer programs and programmable logic controls to determine speed and power consumption, and process automation systems | ACTIVE | — |
| 011 | Heat exchangers and their replacement parts, in particular cyclone heat exchangers not being parts of machines; counter current flow calcining machines and their parts for the transformation of mineral raw materials, in particular for calcining limestone; furnaces and their parts for industrial purposes, in particular rotary kilns and their parts for the cement industry and for mineral aggregate preparation; oil burners for industrial kilns and rotary kilns and for industrial pre heaters for preheating raw meal in the cement production process; cooling conveyors and their parts for cooling hot bulk goods, in particular hot cement clinker, in particular stepped coolers and reciprocating slat coolers | ACTIVE | — |
| 037 | Construction, installation and placing into service, repair, maintenance and servicing of burners; structural and civil engineering; plant construction, in particular cement works, coal and ore dressing plants and metal works; construction, installation and placing into service, repair, maintenance and servicing of machinery and equipment for cement works, coal plants, mineral and smelting works | ACTIVE | — |
| 042 | Mechanical and structural engineering services, in particular for the planning, construction, selection, compilation and dimensioning of machinery parts for the cement, coal, mineral and metal industry together with conception and programming of process automation systems; technical consulting and project planning for plant construction, in particular for the cement, coal, mineral and metal industry; drawing up of expert technical opinions in connection with technical, geological and scientific expert reports, in particular for the cement, coal, mineral and metal industry in the nature of geological surveys, technical surveys; land surveying; services of a property developer, namely, technical preparation of building projects in the nature of design of industrial plants; physics research featuring energetic calculation and simulation of industrial processes, firing systems and heat exchangers together with the calculation and simulation of mechanical force distribution systems in static and dynamic installation parts; services of a technical measuring and testing laboratory, in particular materials testing and evaluation of the pollution and dust emissions of industrial plants; services of a chemical laboratory, in particular analysis of building materials; materials testing procedures, in particular pulverizing stones and minerals and dust sifting in the nature of testing raw materials, material testing, grinding and sifting for testing purposes; drawing up geological and scientific expert reports; scientific research in the fields of environment protection, chemistry, technical development, machine construction and the dressing and preparation of mineral raw materials for scientific and technological applications | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 8, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 8, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 8, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 29, 2019 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jul 29, 2019 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jul 9, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Apr 20, 2019 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| May 3, 2018 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Mar 17, 2017 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Mar 17, 2017 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Mar 16, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 4, 2016 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Feb 6, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 5, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 5, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 20, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 20, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 12, 2010 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Feb 25, 2010 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Feb 2, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 2, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 29, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 29, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 25, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 25, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 23, 2009 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| May 21, 2009 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| May 21, 2009 | GNCF | CONTINUATION OF FINAL REFUSAL E-MAILED | — |
| May 21, 2009 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| May 21, 2009 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| May 21, 2009 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 21, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 17, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 17, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2009 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Apr 10, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 10, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 10, 2009 | ALIE | ASSIGNED TO LIE | — |
| Apr 10, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 8, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 10, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 10, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 10, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 9, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2008 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 28, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 28, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Nov 27, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |