Drawing for MWM

USPTO serial 79061808

MWM

Reviewed by CopyMark Law Group

Reg. 3790324Status 706Registered
Filing date
Status date
Registration date
May 18, 2010
Examiner
FENNESSY, EDWARD JOHN
Law office
TMEG LAW OFFICE 101

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with MWM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher P. Foley

Christopher P. Foley Finnegan, Henderson, Farabow, Garrett & Dunner LLP901 New York Avenue NWWashington, DC 20001UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007[ Internal combustion engines for power generation other than for land vehicles, namely, air and water-cooled diesel and gas engines and gas turbine engines for stationary machines and parts therefor; internal combustion engines for machine operation and replacement parts therefor; internal combustion engines for power generation, other than for land vehicles; diesel engines for machines; diesel engines not for land vehicles; internal combustion engines for boats, for woodworking machines, for grinding mill machines, for brewery machines, and for hoists and for oil field apparatus, namely, drilling rig mechanization machines and devices; ] machine assemblies consisting of stationary and mobile internal combustion engines, namely, electric power generators for generating electrical power; [ air and hydraulic compressors for machines; pumps, namely, vacuum pumps and hydraulic pumps; ] emergency power generating installations and combined heat and power installations, namely, auxiliary power units for supplying electrical power to heat and power generators; [ fuel conversion apparatus for internal combustion engines, namely, catalytic exhaust gas converters; ] speed governors for [ machines, ] engines [ and motors; ] [ compressed air engines, namely, compressed air motors, air motors; ] [ filters for machines or engines, namely, engine air filters, oil filters and fuel filters; ] crankcases for [ machines, motors and ] engines; [ hydraulic motors for hydraulic pumps; hydraulic controls for machines and motors; ] [ filters for cleaning cooling air for engines; ] regulators being parts of machines; control mechanisms [ for machines, ] for engines [ or for motors, ] namely, [ hydraulic controls, pneumatic controls and ] electrical controls [ ; anti-pollution devices for motors and engines; combustion engines for rollers, excavators, cranes, road building machines, and agricultural machines; engines and motors for the generation of electricity; engines not for land vehicles; engines, other than for land vehicles; gasoline engines not for land vehicles; industrial engines; marine engines and parts and fittings thereof ]ACTIVE—
011[ Heat pumps; heat regenerators; heat accumulators; heat exchangers; electrochemical gas generators and steam generators ]SECTION 71 - CANCELLED—
012[ Internal combustion engines for land vehicles, namely, air and water-cooled diesel engines and gas engines ]SECTION 71 - CANCELLED—
037Rebuilding of [ land vehicle engines, ] engines not for land vehicles and stationary enginesACTIVE—
040[ Rental of electric power generators; rental of power generating equipment, namely, internal combustion engines ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 22, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 20, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 14, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 8, 2021INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jan 1, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 1, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 1, 202071AGREGISTERED-SEC.71 ACCEPTED—
Apr 30, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 17, 2020ES71TEAS SECTION 71 RECEIVED—
May 18, 2019REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 4, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Mar 16, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 19, 2018XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jan 19, 2018XXCRGENERIC MADRID TRANSACTION CREATED—
Jan 2, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 5, 2017NA15SEC. 15 ACKNOWLEDGEMENT - E-MAILED—
Jul 5, 201715AKREGISTERED - SEC. 15 ACKNOWLEDGED—
Jun 29, 2017E15RTEAS SECTION 15 RECEIVED—
May 2, 2017NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 2, 201771.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Apr 24, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 16, 2016ES71TEAS SECTION 71 RECEIVED—
Jul 24, 2014ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 24, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 11, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 3, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 3, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 18, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 28, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 18, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 13, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 13, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 2, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 10, 2010NPUBNOTICE OF PUBLICATION—
Jan 27, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 27, 2010CNEAEXAMINERS AMENDMENT MAILED—
Jan 27, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 27, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jan 27, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 22, 2010ACECAMENDMENT FROM APPLICANT ENTERED—
Dec 18, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 18, 2009FAXXFAX RECEIVED—
Nov 10, 2009RECDACTION DENYING REQ FOR RECON MAILED—
Nov 10, 2009CNCFACTION CONTINUING FINAL - COMPLETED—
Oct 15, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Oct 15, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 9, 2009MAILPAPER RECEIVED—
Jul 7, 2009CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 6, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 9, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 9, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 9, 2009ALIEASSIGNED TO LIE—
Jun 2, 2009MAILPAPER RECEIVED—
Mar 5, 2009CHLDCHANGE OF OWNER RECEIVED FROM IB—
Feb 6, 2009RFNTREFUSAL PROCESSED BY IB—
Dec 19, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 19, 2008RFRRREFUSAL PROCESSED BY MPU—
Dec 19, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 19, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 18, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 17, 2008DOCKASSIGNED TO EXAMINER—
Dec 15, 2008NWAPNEW APPLICATION ENTERED—
Dec 12, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance