USPTO serial 79062018
ENERGYCULTURE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 4, 2010
- Examiner
- JOINER, KATINA JACKSON
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ENERGYCULTURE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
SIEMENS GAMESA RENEWABLE ENERGY, S.A.
ES
Other trademarks owned by SIEMENS GAMESA RENEWABLE ENERGY, S.A.
GAMESA CORPORACION TECNOLOGICA, S.A.
ES
Other trademarks owned by GAMESA CORPORACION TECNOLOGICA, S.A.
GAMESA CORPORACION TECNOLOGICA, S.A.
ES
Other trademarks owned by GAMESA CORPORACION TECNOLOGICA, S.A.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jesus Sanchelima
Jesus Sanchelima Sanchelima & Associates, P.A.235 SW Le Jeune RoadMiami, FL 33134UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | electric power generators, wind turbines and wind turbine towers; transmission mills; transmission gears for machines; machine parts, namely, blades and vanes, blades or vanes as parts of machines | SECTION 71 - CANCELLED | — |
| 009 | electric apparatus, namely, multipliers and electrical switch-gear used in remote operation of electricity distribution; electric relays; electronic circuit breakers; apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current, electrical conductors and Electric transformers | SECTION 71 - CANCELLED | — |
| 035 | advertising; provision of business consulting services in the field of business processes for companies directly involved in manufacturing or marketing | SECTION 71 - CANCELLED | — |
| 037 | repair of wind generators; technical assistance in the field of wind generators; assembly and maintenance of wind turbines, electrical instrumentation and control equipment; assembly, repair and maintenance services for apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity | SECTION 71 - CANCELLED | — |
| 039 | distribution of energy and electricity distribution | SECTION 71 - CANCELLED | — |
| 040 | production of energy; energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam; generation of energy and electricity | SECTION 71 - CANCELLED | — |
| 041 | education services, namely, organization of seminars and conferences in the field of production, transformation, distribution and rational use of the energy, specially of the solar and wind power energy; training in the field of production, transformation, distribution and rational use of the energy, specially of the solar and wind power energy | SECTION 71 - CANCELLED | — |
| 042 | scientific and technological services and research and design services in the field of production, transformation, distribution and rational use of the energy, especially of wind power energy; industrial analysis and research services in the field of production, transformation, distribution and rational use of the energy, especially of wind power energy; research and design services for apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, in particular for production of electricity from renewable energy sources; industrial analysis and research services for developing apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, in particular for production of electricity from renewable energy sources | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SIEMENS GAMESA RENEWABLE ENERGY, S.A.
- Other trademarks owned by GAMESA CORPORACION TECNOLOGICA, S.A.
- Other trademarks owned by GAMESA CORPORACION TECNOLOGICA, S.A.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named ENERGYCULTURE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 8, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Mar 8, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jun 21, 2018 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 2, 2018 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Sep 8, 2017 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 15, 2017 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 15, 2017 | INPC | INVALIDATION PROCESSED | — |
| Aug 9, 2017 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 27, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 9, 2016 | C71T | CANCELLED SECTION 71 | — |
| Apr 21, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 13, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 13, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 4, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 4, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 26, 2010 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 16, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 27, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Jan 12, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 12, 2010 | ALIE | ASSIGNED TO LIE | — |
| Dec 22, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 21, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 21, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 21, 2009 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 14, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 14, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 23, 2009 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 22, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 1, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 1, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 1, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 6, 2009 | RFNP | REFUSAL PROCESSED BY IB | — |
| Dec 19, 2008 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 18, 2008 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 18, 2008 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 18, 2008 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 17, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 15, 2008 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 15, 2008 | NWAP | NEW APPLICATION ENTERED | — |
| Dec 12, 2008 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |