Drawing for ENERGYCULTURE

USPTO serial 79062018

ENERGYCULTURE

Reviewed by CopyMark Law Group

Reg. 3784909Status 404
Filing date
Status date
Registration date
May 4, 2010
Examiner
JOINER, KATINA JACKSON
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ENERGYCULTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jesus Sanchelima

Jesus Sanchelima Sanchelima & Associates, P.A.235 SW Le Jeune RoadMiami, FL 33134UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007electric power generators, wind turbines and wind turbine towers; transmission mills; transmission gears for machines; machine parts, namely, blades and vanes, blades or vanes as parts of machinesSECTION 71 - CANCELLED—
009electric apparatus, namely, multipliers and electrical switch-gear used in remote operation of electricity distribution; electric relays; electronic circuit breakers; apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current, electrical conductors and Electric transformersSECTION 71 - CANCELLED—
035advertising; provision of business consulting services in the field of business processes for companies directly involved in manufacturing or marketingSECTION 71 - CANCELLED—
037repair of wind generators; technical assistance in the field of wind generators; assembly and maintenance of wind turbines, electrical instrumentation and control equipment; assembly, repair and maintenance services for apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricitySECTION 71 - CANCELLED—
039distribution of energy and electricity distributionSECTION 71 - CANCELLED—
040production of energy; energy recycling services, namely, capturing and conversion of wasted energy into electricity and useful steam; generation of energy and electricitySECTION 71 - CANCELLED—
041education services, namely, organization of seminars and conferences in the field of production, transformation, distribution and rational use of the energy, specially of the solar and wind power energy; training in the field of production, transformation, distribution and rational use of the energy, specially of the solar and wind power energySECTION 71 - CANCELLED—
042scientific and technological services and research and design services in the field of production, transformation, distribution and rational use of the energy, especially of wind power energy; industrial analysis and research services in the field of production, transformation, distribution and rational use of the energy, especially of wind power energy; research and design services for apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, in particular for production of electricity from renewable energy sources; industrial analysis and research services for developing apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, in particular for production of electricity from renewable energy sourcesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 8, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Mar 8, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 21, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 2, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 8, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 15, 2017INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 15, 2017INPCINVALIDATION PROCESSED—
Aug 9, 2017INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 27, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 9, 2016C71TCANCELLED SECTION 71—
Apr 21, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 13, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 13, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 4, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 4, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 26, 2010NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 16, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 27, 2010NPUBNOTICE OF PUBLICATION—
Jan 12, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 12, 2010ALIEASSIGNED TO LIE—
Dec 22, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 21, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 21, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 21, 2009ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 14, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 14, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 23, 2009CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 22, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 1, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 1, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 1, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 6, 2009RFNPREFUSAL PROCESSED BY IB—
Dec 19, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 18, 2008RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 18, 2008RFRRREFUSAL PROCESSED BY MPU—
Dec 18, 2008RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 17, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 15, 2008DOCKASSIGNED TO EXAMINER—
Dec 15, 2008NWAPNEW APPLICATION ENTERED—
Dec 12, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance