Drawing for STOCK SCHENCK PROCESS GROUP

USPTO serial 79062324

STOCK SCHENCK PROCESS GROUP

Reviewed by CopyMark Law Group

Reg. 4010923Status 404
Filing date
Status date
Registration date
Aug 16, 2011
Examiner
BUSH, KAREN K
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with STOCK SCHENCK PROCESS GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Tanks of metal or mainly of metal, namely, metal containers for storage and transportation of bulk goodsSECTION 71 - CANCELLED—
007Machines for the chemical and pharmaceutical industry, food industry, plastics, pulp and paper industry, heavy industry and environmental industry, namely, machines for separating, sorting forwarding, pressing and grinding waste; engines not for use with land vehicles; couplings and clutches for power transmission for machines, except those meant for land vehicles; conveyors, machines with mechanical carrying devices for holding and emptying of bulk material containers, principally machine equipment as machine parts for stirring and passing on of bulk material from bulk material containers; machines in the nature of volume conveyors; mechanical bulk material mixers, bottle filling machines, machines for classifying of bulk material in the nature of sorting machines; drainage sieves as machines or machine parts; cast iron unpacking machines; mechanical vibration apparatus for conveying, shaking, feeding, screening, compacting and sorting of materials; vibrating conveyor channels and vibrating sieves as machines or machine parts, base compacting machines for compacting waste, parts of vibrating machines, in particular directional exciters, circle exciters, unbalance motors, magnetic exciters; springs as component parts of machines and cardan shafts as machine parts; machine operated transportation apparatus in the nature of conveyors, conveyor belts, conveyor mats and pneumatic transporters; screw conveyors and feeding screw conveyors as machines or machine parts, conveyor belts, cell sluices as machines for conveying and measuring of bulk material, chain conveyors, sheet bands, namely, belts for machines and conveyor belts as machine parts, lifting jacks, namely, power operated mechanical equipment for lifting and lowering of loads, bucket conveyors, elevators, belt conveyors, paternoster belts as mechanical components, apron conveyors, machine operated wagon loading and wagon unloading apparatus, mechanical conveyors for pits, machines for cleaning coal and parts belonging thereto, in particular crushers; chutes as component parts of sorting machines, electric pumps, conveyors, cyclones and spiral separators, hydrocyclones, spiral concentrators, magnetic separators, centrifuges, drainage machines in the nature of screen separators for the drainage of ore, coal, coke, sinter, pellats or rock; mechanical equipment for adding of flake substances in the nature of automated dispensing machines for adding and mixing flaked substances for industrial purposesSECTION 71 - CANCELLED—
009Physical, optical, electrotechnical and electronic devices for control systems and surveillance of machines, namely, electronic circuits, instruments for detecting and measuring two-dimensional distribution of force and pressure, microsensors for measurement of pressure, acceleration, force and flow; weighing, measuring, signaling and controlling apparatus and instruments, namely, scales and balances, level switches and level indicators for monitoring and controlling liquids in tanks and vessels, environmental monitoring systems comprised of meters and sensors that measure pressure, humidity, temperature and includes alarm and reporting functions, force measurement products, namely, digital force gauges, digital torque gauges and manual and motorized test stands used therewith sold as a unit with the gauges; data processors; computers; devices meant for oscillation measurement or monitoring of oscillations, namely, transducers that utilize ultrasonic oscillations to test for stress and fatigue in metal; electro acoustic transducers for measuring purposes; electric sensors for measuring density of dry bulk goods; measuring devices, namely, electroacoustic pressure transducers; weighing scales; weighing equipment, namely, scales and balances; mass flow measuring apparatus; vehicle weighing equipment, namely, weighing scales; machines for measuring and testing of force transducers; weighing machines for industrial use, namely, belt weighers, dosing belt weighers, and differential proportioning weighers; parts of weighing scales; data entry and monitoring electronics for machines, namely, data processors, wireless electrical controllers to monitor and control the function of the aforementioned machines and parts; safety devices in the nature of optoelectronic sensors, namely, light barriers for monitoring and controlling machines; electrical switches; computers and the related periphery, namely, wireless controllers for control and regulation of the aforementioned goods. computer programs recorded on data storage media for controlling and regulating the aforementioned goods; replacement parts of all aforementioned goodsSECTION 71 - CANCELLED—
011Apparatus for cooling and drying of transported materials and bulk goods, namely, cooling evaporators, dehumidifiersSECTION 71 - CANCELLED—
012Aerial conveyers, namely, overhead trolleys consisting of a loop of chain or cable suspended from a track and with carriers attached to hang or contain productsSECTION 71 - CANCELLED—
020Non-metal containers for storage and transportation of bulk goods, for commercial useSECTION 71 - CANCELLED—
042Technical engineering services; technical project planning in the nature of engineering services; technical engineering consultation; computer programming; development, updating, installation and maintenance of computer software; computer software consultationSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 20, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jul 20, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 23, 2018C71TCANCELLED SECTION 71—
Aug 16, 2016REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jan 20, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 26, 2014ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 11, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 23, 2012CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 22, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 22, 2012FIMPFINAL DISPOSITION PROCESSED—
Nov 16, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 19, 2011GPNXNOTIFICATION PROCESSED BY IB—
Aug 16, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 31, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 31, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 11, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 11, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 27, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 27, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 27, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Apr 27, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 27, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 27, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 1, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 31, 2011CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 31, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 3, 2011RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Feb 25, 2011RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Aug 20, 2010RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Aug 20, 2010ALIEASSIGNED TO LIE—
Jul 30, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
May 20, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 20, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 17, 2010RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Dec 10, 2009DCPNCHANGE OF OWNER RECEIVED FROM IB—
Nov 27, 2009DOCKASSIGNED TO EXAMINER—
Aug 17, 2009DMCCDATA MODIFICATION COMPLETED—
Aug 14, 2009ALIEASSIGNED TO LIE—
Aug 14, 2009GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Aug 14, 2009GNSLLETTER OF SUSPENSION E-MAILED—
Aug 14, 2009CNSLSUSPENSION LETTER WRITTEN—
Jul 2, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 1, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 1, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 1, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 13, 2009RFNTREFUSAL PROCESSED BY IB—
Jan 5, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 5, 2009RFRRREFUSAL PROCESSED BY MPU—
Jan 2, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 1, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 23, 2008MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 19, 2008DOCKASSIGNED TO EXAMINER—
Dec 19, 2008NWAPNEW APPLICATION ENTERED—
Dec 18, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance