Drawing for HUMBOLDT

USPTO serial 79062651

HUMBOLDT

Reviewed by CopyMark Law Group

Reg. 3793208Status 404
Filing date
Status date
Registration date
May 25, 2010
Examiner
ROACH, APRIL K
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with HUMBOLDT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

KEVIN W. GUYNN

KEVIN W. GUYNN GREER, BURNS & CRAIN, LTD.300 SOUTH WACKER DRIVESUITE 2500CHICAGO, IL 60606

Goods and services

ClassDescriptionStatusFirst use
007Machines and their parts for the chemical industry and for the cement, coal, mineral and metal industry, namely, aerators, belt conveyors, belts for conveyors, compressed air pumps, disintegrators, earth moving machines, engines or motors not for land vehicles, grinding machines, heat exchangers as parts of machines, mine borers, mud catchers and collector machines being part of mine borers, milling machines for the treatment of ore, pneumatic transporters, pneumatic tube conveyors, regulators as parts of machines, rolling mills, power operated separating machines, shredder machines for industrial use, sieves a machines for industrial use, sieves as parts of machines for industrial use, sifters as machines for industrial use, sifting installations as machines for industrial use, air condensers in the nature of steam condensers, steamrollers, stone grinding machines, suction machines for industrial purposes, vibratory screen separators for industrial use; comminution machines and their parts, in particular cone crushers and roller crushers for the cement, coal, mineral and metal industry; mills in the nature of roller mills, hammer mills, ball mills, roller plate mills and vertical mills for the cement, coal, mineral and metal industry and their parts; presses, in particular roller presses and briquetting machines; machine parts, namely, mill stones and annular casings with and without hard bodies for milling or pressing rollers; cooling conveyors and their parts for cooling hot bulk goods, in particular hot cement clinker, in particular stepped coolers and reciprocating slat coolers; separating machines and their parts for separating fine bulk goods, in particular wind, cascade and rod basket sifters; sorting machines and their parts, in particular wet sorting machines, jigging machines, flotation machines and magnetic gradersSECTION 71 - CANCELLED—
009Electric systems and their parts for remote control of industrial procedures, instrumentation and control devices including control systems for machines in the nature of frequency converters and computer programs and programmable logic controls to determine speed and power consumption, and process automation systemsSECTION 71 - CANCELLED—
011Heat exchangers and their replacement parts, in particular cyclone heat exchangers not being parts of machines; counter current flow calcining kilns and their parts for the transformation of mineral raw materials, in particular for calcining limestone; furnaces and their parts for industrial purposes, in particular rotary kilns and their parts for the cement industry and for mineral aggregate preparation; oil burners for industrial kilns and rotary kilns and for industrial pre heaters for preheating raw meal in the cement production process; coolers and their parts for cooling hot bulk goods, in particular hot cement clinker, in particular stepped coolers and reciprocating slat coolersSECTION 71 - CANCELLED—
037Construction, installation, conversion, placing into service, repair, maintenance and servicing of burners; [ structural and civil engineering; ] plant construction, in particular cement works, coal and ore dressing plants and metal works; construction, installation, conversion, placing into service, repair, maintenance and servicing of machinery and equipment for cement works, coal plants, mineral and smelting worksSECTION 71 - CANCELLED—
042Mechanical and structural engineering services, in particular for the planning, construction, selection, compilation and dimensioning of machinery parts for the cement, coal, mineral and metal industry together with conception and programming of process automation systems; technical consulting and project planning for plant construction, in particular for the cement, coal, mineral and metal industry; drawing up of expert technical opinions in connection with technical, geological and scientific expert reports, in particular for the cement, coal, mineral and metal industry in the nature of geological surveys, technical surveys; land surveying; services of a property developer, namely, technical preparation of building projects in the nature of design of industrial plants; physics research featuring energetic calculation and simulation of industrial processes, firing systems and heat exchangers together with the calculation and simulation of mechanical force distribution systems in static and dynamic installation parts; services of a technical measuring and testing laboratory, in particular materials testing and evaluation of the pollution and dust emissions of industrial plants; services of a chemical laboratory, in particular analysis of building materials; materials testing procedures, in particular pulverizing stones and minerals and dust sifting in the nature of testing raw materials, material testing, grinding and sifting for testing purposes; drawing up geological and scientific expert reports; scientific research in the fields of environment protection, chemistry, technical development, machine construction and the dressing and preparation of mineral raw materials for scientific and technological applications; * structural and civil engineering *SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 8, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Mar 8, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 6, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 13, 2017INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 13, 2017INPCINVALIDATION PROCESSED—
Aug 30, 2017INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 30, 2016C71TCANCELLED SECTION 71—
Feb 11, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 13, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 13, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 25, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 11, 2010CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jun 10, 2010COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 10, 2010PLGLASSIGNED TO PARALEGAL—
Jun 3, 2010RINXUSPTO CORRECTION PROCESSED BY IB—
Jun 3, 2010CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 25, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 9, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 1, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 28, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 8, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 8, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 6, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 14, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 14, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 14, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 8, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 8, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 8, 2009ALIEASSIGNED TO LIE—
May 7, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 7, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 13, 2009RFNTREFUSAL PROCESSED BY IB—
Jan 6, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 6, 2009RFRRREFUSAL PROCESSED BY MPU—
Jan 6, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 5, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 2, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 29, 2008DOCKASSIGNED TO EXAMINER—
Dec 29, 2008NWAPNEW APPLICATION ENTERED—
Dec 25, 2008REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance