USPTO serial 79063121
PROTECTSYS
Reviewed by CopyMark Law Group
Reg. 3793211Status 404
- Filing date
- Status date
- Registration date
- May 25, 2010
- Examiner
- ROACH, APRIL K
- Law office
- POST REGISTRATION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with PROTECTSYS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey H. Kaufman
Jeffrey H. Kaufman Muncy, Geissler, Olds & Lowe, P.C.4000 Legato Road, Suite 310Fairfax, VA 22033UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electronic leakage location apparatus and instruments, namely, wireless temperature and humidity sensors for measuring water vapour pressure in flat roof insulation areas; electrical and electronic detectors for detecting and measuring fluid leakage; flue gas leakage location apparatus and instruments, namely, electrical and electronic detectors for detecting and measuring flue gas leakage; tracer gas leakage location apparatus and instruments, namely, electrical and electronic detectors for detecting and measuring tracer gas leakage; infrared thermography apparatus and instruments, namely, infrared detectors; thermometers; roof insulation drying apparatus, particularly electrical and electronic detectors for measuring moisture in roof insulation | SECTION 70 - CANCELLED | — |
| 037 | Building construction, namely, leakage location in buildings, particularly flat roofs, brick works and thermal insulations, on high-level tanks, swimming pools, disposal sites, in water-conducting ducts, long-distance heating ducts, by means of visual leakage location, electronic leakage location, flue gas leakage location, tracer gas leakage location, and infrared thermography; flat roof insulation layer drying | SECTION 70 - CANCELLED | — |
| 042 | [ Scientific and technological services, namely, conducting technical studies on industrial process optimization, studies on product development, and methods of leakage location in buildings in plant safety and reliability inspections, all by using infrared thermography; inspections to support plant safety and reliability by using infrared thermography; infrared measurement evaluations for air draft studies and air change studies; infrared measurement evaluations for industrial location of electrical conductors and circuits relative to the influence thereof on machines as well as for long-term process studies; on-site quality control services for buildings ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by AB Mess- und Trocknungstechnik GmbH
- Other trademarks owned by AB Mess- und Trocknungstechnik GmbH
- Other trademarks owned by ILD Deutschland GmbH
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named PROTECTSYS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 7, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 7, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| May 25, 2019 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jul 27, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 15, 2017 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| May 1, 2017 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| May 1, 2017 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 1, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 28, 2017 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Nov 23, 2016 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Mar 7, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 25, 2015 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Feb 11, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 11, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 13, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 13, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 25, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 25, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 9, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 9, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 1, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 26, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 14, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 13, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 13, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 11, 2009 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 11, 2009 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 11, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 1, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 25, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 25, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 25, 2009 | ALIE | ASSIGNED TO LIE | — |
| Aug 7, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 7, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 7, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 6, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 9, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 9, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 7, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 6, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 5, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 13, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 7, 2009 | NWAP | NEW APPLICATION ENTERED | — |
| Jan 6, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |