USPTO serial 79063727
NIHONSPINDLE
Reviewed by CopyMark Law Group
Reg. 3807142Status 706Registered
- Filing date
- Status date
- Registration date
- Jun 22, 2010
- Examiner
- HABEEB, MYRIAH A
- Law office
- GENERIC WEB UPDATE
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with NIHONSPINDLE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mainak H. Mehta
Mainak H. Mehta Procopio, Cory, Hargreaves & Savitch LLP525 B. Street, Suite 2200San Diego, CA 92101UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [Metal materials used exclusively for buildings or construction, namely, metal cladding; prefabricated buildings sets of metal consisting of prefabricated metal buildings and metal bolts therefor; metal sliding doors; metal hinged doors, partitions of metal and miscellaneous joinery fittings of metal] | SECTION 71 - CANCELLED | — |
| 007 | Metalworking machines and tools, namely, spinning machines and drawing machines; chemical machines and apparatus, namely, agitating machines, mixing and blending machines[, dissolving machines and emulsifying machines all for chemical processing; food or beverage processing machines and apparatus, namely, meat processing machines, namely, electric meat grinders; fishery product processing machines, namely, machines for flaking dried fish meat; tea processing machines, namely, tea extracting machines; coffee processing machines, namely, coffee extracting machines and electric coffee grinders; aerated beverage making machine and grinding machines with spiral bevel gears; plastic processing machines and apparatus, namely, injection plastic molding machine and film winding machines; semiconductor manufacturing machines]; machines and apparatus for manufacturing rubber goods, namely, rubber forming machines and rubber mixing machines; [waste compacting machines; waste crushing machines] | ACTIVE | — |
| 011 | [Drying apparatus, namely, electric hand drying apparatus for washrooms and clothes dryers; apparatus for chemical processing, namely, recuperators, steamers, evaporators, distillers and heat exchangers; industrial furnaces and their parts and fittings; nuclear reactors and their parts and fittings; air conditioning apparatus; air filter for air conditioning apparatus; air filter for air purifying apparatus; water cooling tower; refrigerating machines; processing apparatus for contaminated soil and sludge, namely, equipment for treating groundwater and soil comprising distribution lines, distribution manifolds, drop tubes, well seals and blowers; garbage incinerators and their parts and fittings; exhaust gas processing apparatus for industrial furnaces and their parts and fittings, namely, ventilating exhaust fans; exhaust gas processing apparatus for processing apparatus for contaminated soil and sludge and their parts and fittings, namely, ventilating exhaust fans; exhaust gas disposal apparatus of garbage incinerators for industrial purposes and their parts and fittings, namely, ventilating exhaust fans] | SECTION 71 - CANCELLED | — |
| 019 | [Ceramic materials used exclusively for buildings, bricks and refractory products, namely, ceramic tiles; plastic materials used exclusively for buildings, namely, plastic floorboards; synthetic materials used exclusively for buildings, namely, synthetic flooring materials; asphalt and asphalt materials used exclusively for buildings or construction, namely, asphalt roof coatings; rubber materials used exclusively for buildings or construction, namely, rubber flooring; lime materials used exclusively for buildings or construction, namely, hydrated lime for building purposes; gypsum materials used exclusively for buildings or construction, namely, gypsum tiles; prefabricated building sets, not of metal consisting of prefabricated non-metal buildings and non-metal concrete construction hardware, namely, load transfer dowels therefor; lumber; wood materials used exclusively for buildings, namely, wood beams; building glass; non-metal sliding doors, non-metal hinged doors, partitions, namely, construction materials, namely, nonmetal toilet partitions and miscellaneous joinery fittings, not of metal] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by NIHON SPINDLE MFG. CO., LTD.
- Other trademarks owned by NIHON SPINDLE MFG. CO., LTD.
- Other trademarks owned by NIHON SPINDLE MFG. CO., LTD.
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 019
- Similar marks named NIHONSPINDLE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 2, 2021 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jul 27, 2021 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 28, 2020 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 27, 2020 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Nov 17, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 22, 2020 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 22, 2019 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jan 31, 2019 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Oct 25, 2018 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Oct 12, 2018 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Apr 26, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 26, 2017 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 28, 2017 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 27, 2017 | INPC | INVALIDATION PROCESSED | — |
| Mar 11, 2017 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 11, 2016 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jul 11, 2016 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jul 8, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 1, 2016 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 11, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 11, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 11, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 27, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 27, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 22, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 22, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 6, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 17, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 26, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 25, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 5, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 4, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 4, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 10, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 9, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 19, 2009 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Aug 19, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 19, 2009 | ALIE | ASSIGNED TO LIE | — |
| Aug 3, 2009 | PAPER RECEIVED | — | |
| Feb 27, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 4, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 4, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 3, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 2, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 2, 2009 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Jan 31, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 30, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 27, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 23, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 23, 2009 | NWAP | NEW APPLICATION ENTERED | — |
| Jan 22, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |